IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v29y2011i1p97-106.html
   My bibliography  Save this article

Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location

Author

Listed:
  • Onur Dursun
  • Christian Stoy

Abstract

Construction duration is one of the key elements to determine the success of a project. Several models have been developed to provide precise predictions of construction duration. The datasets in previous studies comprise observations from particular countries. This precludes examination of the role of project location at the country level for modelling construction duration. The aim, therefore, is to test the statistical adequacy of categorizing projects with respect to their locations for modelling construction duration. A formal procedure to evaluate the adequacy of categorizing observations is also presented. It is intended to contribute to the epistemology of modelling construction duration. The dataset was generated from a global client. It contains information on 246 projects from 25 different countries. This creates a categorical variable for location. Bromilow's time-cost model is chosen to assess the adequacy of this categorization. A full model with indicator and interaction variables is compared to a restricted one. Parameter estimation was performed according to the ordinary least squares method. F-statistics are calculated and the probability of the value is significant. The results show that two distinct groups with substantial changes in model parameters exist in the dataset. It is also noted that conclusions are valid over the selected population.

Suggested Citation

  • Onur Dursun & Christian Stoy, 2011. "Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location," Construction Management and Economics, Taylor & Francis Journals, vol. 29(1), pages 97-106.
  • Handle: RePEc:taf:conmgt:v:29:y:2011:i:1:p:97-106
    DOI: 10.1080/01446193.2010.528437
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446193.2010.528437
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2010.528437?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Albert Chan, 1999. "Modelling building durations in Hong Kong," Construction Management and Economics, Taylor & Francis Journals, vol. 17(2), pages 189-196.
    2. Russell Kenley, 2001. "The predictive ability of Bromilow's time-cost model: a comment," Construction Management and Economics, Taylor & Francis Journals, vol. 19(8), pages 759-764.
    3. S. Thomas Ng & Michael Mak & R. Martin Skitmore & Ka Chi Lam & Mark Varnam, 2001. "The predictive ability of Bromilow's time-cost model," Construction Management and Economics, Taylor & Francis Journals, vol. 19(2), pages 165-173.
    4. Will Hughes & Patricia Hillebrandt & John Murdoch, 2000. "The impact of contract duration on the cost of cash retention," Construction Management and Economics, Taylor & Francis Journals, vol. 18(1), pages 11-14.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zaher Mundher Yaseen & Zainab Hasan Ali & Sinan Q. Salih & Nadhir Al-Ansari, 2020. "Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model," Sustainability, MDPI, vol. 12(4), pages 1-14, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. D. R. Ogunsemi & G. O. Jagboro, 2006. "Time-cost model for building projects in Nigeria," Construction Management and Economics, Taylor & Francis Journals, vol. 24(3), pages 253-258.
    2. John M. Kamara & Oliver Heidrich & Vincenza E. Tafaro & Sebastiano Maltese & Mario C. Dejaco & Fulvio Re Cecconi, 2020. "Change Factors and the Adaptability of Buildings," Sustainability, MDPI, vol. 12(16), pages 1-18, August.
    3. Pordea Daniela & David Delia & Mateș Dorel, 2020. "The Impact of Operating Cash Flow and Current Ratio on the Profitability in Construction Industry," Studia Universitatis „Vasile Goldis” Arad – Economics Series, Sciendo, vol. 30(1), pages 22-32, March.
    4. Swee-Lean Chan, 2002. "Responses of selected economic indicators to construction output shocks: the case of Singapore," Construction Management and Economics, Taylor & Francis Journals, vol. 20(6), pages 523-533.
    5. Byeol Kim & Yonghan Ahn & Sanghyo Lee, 2019. "LDA-Based Model for Defect Management in Residential Buildings," Sustainability, MDPI, vol. 11(24), pages 1-16, December.
    6. Wei Tong Chen & Ying-Hua Huang, 2006. "Approximately predicting the cost and duration of school reconstruction projects in Taiwan," Construction Management and Economics, Taylor & Francis Journals, vol. 24(12), pages 1231-1239.
    7. Vitor Sousa & Inês Meireles, 2018. "The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 32(8), pages 2753-2766, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:29:y:2011:i:1:p:97-106. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.