IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v20y2002i3p201-210.html
   My bibliography  Save this article

An object-oriented model for planning and control of housing construction

Author

Listed:
  • Khaled El-Rayes
  • Ramaneetharan Ramanathan
  • Osama Moselhi

Abstract

A practical object-oriented model for the planning and control of housing construction is presented that can generate efficient schedules and determine the time and cost performance of a housing project at three levels: (i) entire project, (ii) particular housing unit and (iii) an individual subcontractor. The model comprises five major components: (1) input module, (2) scheduling module, (3) database module, (4) control module and (5) reports module, and incorporates 18 classes that are designed to address the main requirements in planning and control of housing construction. The model is implemented as a user-friendly prototype software system using Visual C++ 6.0 and Microsoft Foundation Class (MFC). The prototype software is named 'Residential Planner', and runs in Windows 2000 and NT. An example of an application is analysed to illus8 trate the use of the developed model and demonstrate its practical features.

Suggested Citation

  • Khaled El-Rayes & Ramaneetharan Ramanathan & Osama Moselhi, 2002. "An object-oriented model for planning and control of housing construction," Construction Management and Economics, Taylor & Francis Journals, vol. 20(3), pages 201-210.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:3:p:201-210
    DOI: 10.1080/01446190110115312
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190110115312
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190110115312?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Khaled El-Rayes & Osama Moselhi, 1998. "Resource-driven scheduling of repetitive activities," Construction Management and Economics, Taylor & Francis Journals, vol. 16(4), pages 433-446.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Pierre Bonnal & Didier Gourc & Ari-pekka Hameri & Germain Lacoste, 2005. "A linear-discrete scheduling model for the resource-constrained project scheduling problem," Construction Management and Economics, Taylor & Francis Journals, vol. 23(8), pages 797-814.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Khalied Hesham Hyari & Khaled El-Rayes & Mohammad El-Mashaleh, 2009. "Automated trade-off between time and cost in planning repetitive construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 27(8), pages 749-761.
    2. M. Vanhoucke & K. Van Osselaer, 2004. "Work Continuity In A Real-Life Schedule: The Westerschelde Tunnel," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 04/271, Ghent University, Faculty of Economics and Business Administration.
    3. Duc-Hoc Tran & Jui-Sheng Chou & Duc-Long Luong, 2022. "Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms," Operational Research, Springer, vol. 22(1), pages 77-103, March.
    4. M. Vanhoucke, 2006. "An efficient hybrid search algorithm for various optimization problems," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 06/365, Ghent University, Faculty of Economics and Business Administration.
    5. M. Vanhoucke, 2007. "An electromagnetic time/cost trade-off optimization in project scheduling," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 07/457, Ghent University, Faculty of Economics and Business Administration.
    6. Ahmed Hassanein & Osama Moselhi, 2005. "Accelerating linear projects," Construction Management and Economics, Taylor & Francis Journals, vol. 23(4), pages 377-385.
    7. Pierre Bonnal & Didier Gourc & Ari-pekka Hameri & Germain Lacoste, 2005. "A linear-discrete scheduling model for the resource-constrained project scheduling problem," Construction Management and Economics, Taylor & Francis Journals, vol. 23(8), pages 797-814.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:3:p:201-210. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.