IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v38y1992i8p1201-1211.html
   My bibliography  Save this article

An Integrated Model for Job-Shop Planning and Scheduling

Author

Listed:
  • J. B. Lasserre

    (LAAS-CNRS, 7 Avenue du Colonel Roche, 31077 Toulouse Cedex, France)

Abstract

We consider an integrated job-shop planning and scheduling model. To solve the problem we use a (multi-pass) decomposition approach which alternates between solving a planning problem with a fixed sequence of products on the machines, and a job-shop scheduling problem for a fixed choice of the production plan. The generated production plans are feasible i.e., there exists at least one feasible schedule to realize that plan. Quality of the solution is investigated and numerical results are presented.

Suggested Citation

  • J. B. Lasserre, 1992. "An Integrated Model for Job-Shop Planning and Scheduling," Management Science, INFORMS, vol. 38(8), pages 1201-1211, August.
  • Handle: RePEc:inm:ormnsc:v:38:y:1992:i:8:p:1201-1211
    DOI: 10.1287/mnsc.38.8.1201
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.38.8.1201
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.38.8.1201?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wen, Haijun & Hou, Shiwang & Liu, Zhaohua & Liu, Yongjiang, 2017. "An optimization algorithm for integrated remanufacturing production planning and scheduling system," Chaos, Solitons & Fractals, Elsevier, vol. 105(C), pages 69-76.
    2. Guyon, O. & Lemaire, P. & Pinson, É. & Rivreau, D., 2010. "Cut generation for an integrated employee timetabling and production scheduling problem," European Journal of Operational Research, Elsevier, vol. 201(2), pages 557-567, March.
    3. Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
    4. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    5. Chen, Kejia & Ji, Ping, 2007. "A mixed integer programming model for advanced planning and scheduling (APS)," European Journal of Operational Research, Elsevier, vol. 181(1), pages 515-522, August.
    6. Meyr, Herbert & Mann, Matthias, 2013. "A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines," European Journal of Operational Research, Elsevier, vol. 229(3), pages 718-731.
    7. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    8. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    9. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    10. Yu-Wei An & Hong-Sen Yan, 2016. "Lagrangean relaxation approach to joint optimization for production planning and scheduling of synchronous assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6718-6735, November.
    11. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    12. Józefowska, J. & Zimniak, A., 2008. "Optimization tool for short-term production planning and scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 109-120, March.
    13. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:38:y:1992:i:8:p:1201-1211. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.