A heuristic for real-time crew rescheduling during small disruptions
Author
Abstract
Suggested Citation
DOI: 10.1007/s12469-017-0155-1
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Lucas P. Veelenturf & Daniel Potthoff & Dennis Huisman & Leo G. Kroon & Gábor Maróti & Albert P. M. Wagelmans, 2016. "A Quasi-Robust Optimization Approach for Crew Rescheduling," Transportation Science, INFORMS, vol. 50(1), pages 204-215, February.
- Daniel Potthoff & Dennis Huisman & Guy Desaulniers, 2010. "Column Generation with Dynamic Duty Selection for Railway Crew Rescheduling," Transportation Science, INFORMS, vol. 44(4), pages 493-505, November.
- Huisman, Dennis, 2007. "A column generation approach for the rail crew re-scheduling problem," European Journal of Operational Research, Elsevier, vol. 180(1), pages 163-173, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Liping Ge & Stefan Voß & Lin Xie, 2022. "Robustness and disturbances in public transport," Public Transport, Springer, vol. 14(1), pages 191-261, March.
- Eva König, 2020. "A review on railway delay management," Public Transport, Springer, vol. 12(2), pages 335-361, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Borgonjon, Tessa & Maenhout, Broos, 2022. "An exact approach for the personnel task rescheduling problem with task retiming," European Journal of Operational Research, Elsevier, vol. 296(2), pages 465-484.
- Dekker, M.M. & van Lieshout, R.N. & Ball, R.C. & Bouman, P.C. & Dekker, S.C. & Dijkstra, H.A. & Goverde, R.M.P. & Huisman, D. & Panja, D. & Schaafsma, A.M. & van den Akker, M., 2018. "A Next Step in Disruption Management: Combining Operations Research and Complexity Science," Econometric Institute Research Papers EI2018-25, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Dennis Huisman & Gábor Maróti, 2024. "Operations Research at Netherlands Railways," SN Operations Research Forum, Springer, vol. 5(3), pages 1-6, September.
- Bach, L. & Dollevoet, T.A.B. & Huisman, D., 2014. "Integrating Timetabling and Crew," Econometric Institute Research Papers EI 2014-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Lukas Bach & Twan Dollevoet & Dennis Huisman, 2016. "Integrating Timetabling and Crew Scheduling at a Freight Railway Operator," Transportation Science, INFORMS, vol. 50(3), pages 878-891, August.
- Hilbert Snijders & Ricardo L. Saldanha, 2017. "Decision support for scheduling security crews at Netherlands Railways," Public Transport, Springer, vol. 9(1), pages 193-215, July.
- Heil, Julia & Hoffmann, Kirsten & Buscher, Udo, 2020. "Railway crew scheduling: Models, methods and applications," European Journal of Operational Research, Elsevier, vol. 283(2), pages 405-425.
- Mark M. Dekker & Rolf N. Lieshout & Robin C. Ball & Paul C. Bouman & Stefan C. Dekker & Henk A. Dijkstra & Rob M. P. Goverde & Dennis Huisman & Debabrata Panja & Alfons A. M. Schaafsma & Marjan Akker, 2022. "A next step in disruption management: combining operations research and complexity science," Public Transport, Springer, vol. 14(1), pages 5-26, March.
- Breugem, T. & van Rossum, B.T.C. & Dollevoet, T. & Huisman, D., 2022. "A column generation approach for the integrated crew re-planning problem," Omega, Elsevier, vol. 107(C).
- van Rossum, B.T.C. & Dollevoet, T. & Huisman, D., 2024. "Railway crew planning with fairness over time," European Journal of Operational Research, Elsevier, vol. 318(1), pages 55-70.
- Federico Malucelli & Emanuele Tresoldi, 2019. "Delay and disruption management in local public transportation via real-time vehicle and crew re-scheduling: a case study," Public Transport, Springer, vol. 11(1), pages 1-25, June.
- Verhaegh, T. & Huisman, D. & Fioole, P-J. & Vera, J.C., 2016. "A heuristic for real-time crew rescheduling during small disruptions," Econometric Institute Research Papers EI2016-09, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Perumal, Shyam S.G. & Lusby, Richard M. & Larsen, Jesper, 2022. "Electric bus planning & scheduling: A review of related problems and methodologies," European Journal of Operational Research, Elsevier, vol. 301(2), pages 395-413.
- Ana Paias & Marta Mesquita & Margarida Moz & Margarida Pato, 2021. "A network flow-based algorithm for bus driver rerostering," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(2), pages 543-576, June.
- van Lieshout, R.N. & Mulder, J. & Huisman, D., 2016. "The Vehicle Rescheduling Problem with Retiming," Econometric Institute Research Papers EI2016-37, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Masoud Yaghini & Mohammad Karimi & Mohadeseh Rahbar, 2015. "A set covering approach for multi-depot train driver scheduling," Journal of Combinatorial Optimization, Springer, vol. 29(3), pages 636-654, April.
- Dollevoet, T.A.B. & Pecin, D. & Spliet, R., 2020. "The path programming problem and a partial path relaxation," Econometric Institute Research Papers EI-2020-04, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sato, Keisuke & Fukumura, Naoto, 2012. "Real-time freight locomotive rescheduling and uncovered train detection during disruption," European Journal of Operational Research, Elsevier, vol. 221(3), pages 636-648.
- Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
- Kroon, L.G. & Huisman, D., 2011. "Algorithmic Support for Disruption Management at Netherlands Railways," Econometric Institute Research Papers EI 2011-06, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
More about this item
Keywords
Crew rescheduling; Depth-first iterative-deepening; Heuristic; Railway optimization; Real-time rescheduling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:pubtra:v:9:y:2017:i:1:d:10.1007_s12469-017-0155-1. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.