IDEAS home Printed from https://ideas.repec.org/a/spr/opsear/v56y2019i3d10.1007_s12597-019-00395-y.html
   My bibliography  Save this article

Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem

Author

Listed:
  • M. Yazdani

    (Islamic Azad University)

  • M. Zandieh

    (Shahid Beheshti University, G.C.)

  • R. Tavakkoli-Moghaddam

    (University of Tehran)

Abstract

This paper presents a multi-objective dual-resource constrained flexible job-shop scheduling problem (MODRCFJSP) with the objectives of minimizing the makespan, critical machine workload and total workload of machines simultaneously. Two types of multi-objective evolutionary algorithms including fast elitist non-dominated sorting genetic algorithm (NSGA-II) and non-dominated ranking genetic algorithm (NRGA) are proposed for solving MODRCFJSP. Some efficient mutation and crossover operators are adapted to the special chromosome structure of the problem for producing new solutions in the algorithm’s generations. Besides, we provide controlled elitism based version of NSGA-II and NRGA, namely controlled elitist NSGA-II (CENSGA-II) and controlled elitist NRGA (CENRGA), to optimize MODRCFJSP. To show the performance of the four proposed algorithms, numerical experiments with randomly generated test problems are used. Moreover, different convergence and diversity performance metrics are employed to illustrate the relative performance of the presented algorithms.

Suggested Citation

  • M. Yazdani & M. Zandieh & R. Tavakkoli-Moghaddam, 2019. "Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 983-1006, September.
  • Handle: RePEc:spr:opsear:v:56:y:2019:i:3:d:10.1007_s12597-019-00395-y
    DOI: 10.1007/s12597-019-00395-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12597-019-00395-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12597-019-00395-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Xiao-long Zheng & Ling Wang, 2016. "A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem," International Journal of Production Research, Taylor & Francis Journals, vol. 54(18), pages 5554-5566, September.
    2. Khalili-Damghani, Kaveh & Abtahi, Amir-Reza & Tavana, Madjid, 2013. "A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 58-75.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Vahid Baradaran & Amir Hossein Hosseinian, 2020. "A bi-objective model for redundancy allocation problem in designing server farms: mathematical formulation and solution approaches," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(5), pages 935-952, October.
    2. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    3. Mohamadreza Dabiri & Mehdi Yazdani & Bahman Naderi & Hassan Haleh, 2022. "Modeling and solution methods for hybrid flow shop scheduling problem with job rejection," Operational Research, Springer, vol. 22(3), pages 2721-2765, July.
    4. Mohammad Reza Bazargan-Lari & Sharareh Taghipour & Arash Zaretalab & Mani Sharifi, 2022. "Production scheduling optimization for parallel machines subject to physical distancing due to COVID-19 pandemic," Operations Management Research, Springer, vol. 15(1), pages 503-527, June.
    5. Nikzamir, Mohammad & Baradaran, Vahid, 2020. "A healthcare logistic network considering stochastic emission of contamination: Bi-objective model and solution algorithm," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 142(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vahid Baradaran & Amir Hossein Hosseinian, 2020. "A bi-objective model for redundancy allocation problem in designing server farms: mathematical formulation and solution approaches," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(5), pages 935-952, October.
    2. Gholinezhad, Hadi & Zeinal Hamadani, Ali, 2017. "A new model for the redundancy allocation problem with component mixing and mixed redundancy strategy," Reliability Engineering and System Safety, Elsevier, vol. 164(C), pages 66-73.
    3. MacKenzie, Cameron A. & Hu, Chao, 2019. "Decision making under uncertainty for design of resilient engineered systems," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    4. Shoujing Zhang & Tiantian Hou & Qing Qu & Adam Glowacz & Samar M. Alqhtani & Muhammad Irfan & Grzegorz Królczyk & Zhixiong Li, 2022. "An Improved Mayfly Method to Solve Distributed Flexible Job Shop Scheduling Problem under Dual Resource Constraints," Sustainability, MDPI, vol. 14(19), pages 1-19, September.
    5. Zhang, Enze & Wu, Yifei & Chen, Qingwei, 2014. "A practical approach for solving multi-objective reliability redundancy allocation problems using extended bare-bones particle swarm optimization," Reliability Engineering and System Safety, Elsevier, vol. 127(C), pages 65-76.
    6. Kong, Xiangyong & Gao, Liqun & Ouyang, Haibin & Li, Steven, 2015. "Solving the redundancy allocation problem with multiple strategy choices using a new simplified particle swarm optimization," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 147-158.
    7. Zografidou, Eleni & Petridis, Konstantinos & Petridis, Nikolaos E. & Arabatzis, Garyfallos, 2017. "A financial approach to renewable energy production in Greece using goal programming," Renewable Energy, Elsevier, vol. 108(C), pages 37-51.
    8. Soheil Azizi & Milad Mohammadi, 2023. "Strategy selection for multi-objective redundancy allocation problem in a k-out-of-n system considering the mean time to failure," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 1021-1044, June.
    9. Karimi, Behzad & Niaki, S.T.A. & Haleh, Hassan & Naderi, Bahman, 2018. "Bi-objective optimization of a job shop with two types of failures for the operating machines that use automated guided vehicles," Reliability Engineering and System Safety, Elsevier, vol. 175(C), pages 92-104.
    10. Nath, Rahul & Muhuri, Pranab K., 2022. "Evolutionary Optimization based Solution approaches for Many Objective Reliability-Redundancy Allocation Problem," Reliability Engineering and System Safety, Elsevier, vol. 220(C).
    11. Huang, Xianzhen & Coolen, Frank P.A. & Coolen-Maturi, Tahani, 2019. "A heuristic survival signature based approach for reliability-redundancy allocation," Reliability Engineering and System Safety, Elsevier, vol. 185(C), pages 511-517.
    12. Ali Salmasnia & Sadegh Noori & Hadi Mokhtari, 2019. "A redundancy allocation problem by using utility function method and ant colony optimization: tradeoff between availability and total cost," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 416-428, June.
    13. Wei Sun & Yi Su, 2020. "Analysing Green Forward–Reverse Logistics with NSGA-II," Sustainability, MDPI, vol. 12(15), pages 1-18, July.
    14. Xiuli Wu & Junjian Peng & Xiao Xiao & Shaomin Wu, 2021. "An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading," Journal of Intelligent Manufacturing, Springer, vol. 32(3), pages 707-728, March.
    15. Canales-Bustos, Linda & Santibañez-González, Ernesto & Candia-Véjar, Alfredo, 2017. "A multi-objective optimization model for the design of an effective decarbonized supply chain in mining," International Journal of Production Economics, Elsevier, vol. 193(C), pages 449-464.
    16. Petru Cașcaval & Florin Leon, 2022. "Optimization Methods for Redundancy Allocation in Hybrid Structure Large Binary Systems," Mathematics, MDPI, vol. 10(19), pages 1-33, October.
    17. Ramezani, Reza & Ghavidel, Abolfazl & Sedaghat, Yasser, 2021. "Exact and efficient reliability and performance optimization of synchronous task graphs," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    18. Fang, Jianguang & Gao, Yunkai & Sun, Guangyong & Xu, Chengmin & Li, Qing, 2015. "Multiobjective robust design optimization of fatigue life for a truck cab," Reliability Engineering and System Safety, Elsevier, vol. 135(C), pages 1-8.
    19. Madjid Tavana & Kaveh Khalili-Damghani & Amir-Reza Abtahi, 2013. "A fuzzy multidimensional multiple-choice knapsack model for project portfolio selection using an evolutionary algorithm," Annals of Operations Research, Springer, vol. 206(1), pages 449-483, July.
    20. Jose L. Andrade-Pineda & David Canca & Pedro L. Gonzalez-R & M. Calle, 2020. "Scheduling a dual-resource flexible job shop with makespan and due date-related criteria," Annals of Operations Research, Springer, vol. 291(1), pages 5-35, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:56:y:2019:i:3:d:10.1007_s12597-019-00395-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.