Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return
Author
Abstract
Suggested Citation
DOI: 10.1007/s12351-018-0398-x
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kai Fu Yuan & Shi Hua Ma & Bo He & Yang Gao, 2015. "Inventory decision-making models for a closed-loop supply chain system with different decision-making structures," International Journal of Production Research, Taylor & Francis Journals, vol. 53(1), pages 183-219, January.
- Hsien-Jen Lin, 2015. "Two-echelon stochastic inventory system with returns and partial backlogging," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(6), pages 966-975, April.
- Schulz, Tobias & Voigt, Guido, 2014. "A flexibly structured lot sizing heuristic for a static remanufacturing system," Omega, Elsevier, vol. 44(C), pages 21-31.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
- Mabini, Marilyn C. & Pintelon, Liliane M. & Gelders, Ludo F., 1992. "EOQ type formulations for controlling repairable inventories," International Journal of Production Economics, Elsevier, vol. 28(1), pages 21-33, November.
- Tai, Allen H. & Ching, Wai-Ki, 2014. "Optimal inventory policy for a Markovian two-echelon system with returns and lateral transshipment," International Journal of Production Economics, Elsevier, vol. 151(C), pages 48-55.
- John A. Muckstadt & Michael H. Isaac, 1981. "An analysis of single item inventory systems with returns," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 28(2), pages 237-254, June.
- Mitra, Subrata, 2009. "Analysis of a two-echelon inventory system with returns," Omega, Elsevier, vol. 37(1), pages 106-115, February.
- Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.
- Maiti, T. & Giri, B.C., 2017. "Two-way product recovery in a closed-loop supply chain with variable markup under price and quality dependent demand," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 259-272.
- Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
- Dobos, Imre & Richter, Knut, 2006. "A production/recycling model with quality consideration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 571-579, December.
- Richter, Knut, 1996. "The extended EOQ repair and waste disposal model," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 443-447, August.
- David A. Schrady, 1967. "A deterministic inventory model for reparable items," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 14(3), pages 391-398.
- Xiaoming Li, 2015. "Optimal Policies and Bounds for Stochastic Inventory Systems with Lost Sales," Journal of Optimization Theory and Applications, Springer, vol. 164(1), pages 359-375, January.
- Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2011. "An economic production and remanufacturing model with learning effects," International Journal of Production Economics, Elsevier, vol. 131(1), pages 115-127, May.
- R. Canan Savaskan & Luk N. Van Wassenhove, 2006. "Reverse Channel Design: The Case of Competing Retailers," Management Science, INFORMS, vol. 52(1), pages 1-14, January.
- Hariga, Moncer & As’ad, Rami & Khan, Zeinab, 2017. "Manufacturing-remanufacturing policies for a centralized two stage supply chain under consignment stock partnership," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 362-374.
- Ruud H. Teunter, 2001. "Economic ordering quantities for recoverable item inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(6), pages 484-495, September.
- Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
- V. Daniel R. Guide, Jr. & Ruud H. Teunter & Luk N. Van Wassenhove, 2003. "Matching Demand and Supply to Maximize Profits from Remanufacturing," Manufacturing & Service Operations Management, INFORMS, vol. 5(4), pages 303-316, October.
- Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- A. K. Gaula & J. K. Jha, 2024. "Pricing strategy with quality improvement in a dual collection channel closed-loop supply chain under return uncertainty," Operational Research, Springer, vol. 24(2), pages 1-40, June.
- Hu, Shaolong & Hu, Qingmi & Tao, Sha & Dong, Zhijie Sasha, 2023. "A multi-stage stochastic programming approach for pre-positioning of relief supplies considering returns," Socio-Economic Planning Sciences, Elsevier, vol. 88(C).
- Mostafa Parsa & Ali Shahandeh Nookabadi & Zümbül Atan & Yaser Malekian, 2022. "An optimal inventory policy for a multi-echelon closed-loop supply chain of postconsumer recycled content products," Operational Research, Springer, vol. 22(3), pages 1887-1938, July.
- Y. Sarada & S. Sangeetha, 2022. "Coordinating a reverse supply chain with price and warranty dependent random demand under collection uncertainties," Operational Research, Springer, vol. 22(4), pages 4119-4158, September.
- Lingli Shu & Xuedong Liang & Jingyuan Yao & Peng Luo, 2023. "Price Optimization of Closed-loop Supply Chain With Uncertain Demand Under Multi-channel Cross Influence," SAGE Open, , vol. 13(4), pages 21582440231, December.
- Seyed Babak Ebrahimi & Ehsan Bagheri, 2022. "A multi-objective formulation for the closed-loop plastic supply chain under uncertainty," Operational Research, Springer, vol. 22(5), pages 4725-4768, November.
- Yang Hu, 2023. "Perspectives in closed-loop supply chains network design considering risk and uncertainty factors," Papers 2306.04819, arXiv.org.
- Zhang, Yanzi & Berenguer, Gemma & Zhang, Zhi-Hai, 2024. "A subsidized reverse supply chain in the Chinese electronics industry," Omega, Elsevier, vol. 122(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sumit Maheshwari & Amrina Kausar & Ahmad Hasan & Chandra K. Jaggi, 2023. "Sustainable inventory model for a three-layer supply chain using optimal waste management," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 216-235, March.
- Lucas Dias Condeixa & Pierry Silva & Diego Moah & Brenda Farias & Adriana Leiras, 2022. "Evaluating cost impacts on reverse logistics using an Economic Order Quantity (EOQ) model with environmental and social considerations," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(3), pages 921-940, September.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
- Adel A. Alamri, 2023. "A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times," Sustainability, MDPI, vol. 15(12), pages 1-23, June.
- Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Taleizadeh, Ata Allah & Moshtagh, Mohammad Sadegh, 2019. "A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure," International Journal of Production Economics, Elsevier, vol. 217(C), pages 298-316.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
- Ullah, Mehran & Sarkar, Biswajit, 2020. "Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality," International Journal of Production Economics, Elsevier, vol. 219(C), pages 360-374.
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- Hallak, Bassam K. & Nasr, Walid W. & Jaber, Mohamad Y., 2021. "Re-ordering policies for inventory systems with recyclable items and stochastic demand – Outsourcing vs. in-house recycling," Omega, Elsevier, vol. 105(C).
- Mostafa Parsa & Ali Shahandeh Nookabadi & Zümbül Atan & Yaser Malekian, 2022. "An optimal inventory policy for a multi-echelon closed-loop supply chain of postconsumer recycled content products," Operational Research, Springer, vol. 22(3), pages 1887-1938, July.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
- Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
- Melis Teksan, Z. & Geunes, Joseph, 2016. "An EOQ model with price-dependent supply and demand," International Journal of Production Economics, Elsevier, vol. 178(C), pages 22-33.
- Biswajit Sarkar & Mehran Ullah & Seok-Beom Choi, 2019. "Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items," Mathematics, MDPI, vol. 7(6), pages 1-20, June.
- Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
- B. C. Giri & M. Masanta, 2022. "A closed-loop supply chain model with uncertain return and learning-forgetting effect in production under consignment stock policy," Operational Research, Springer, vol. 22(2), pages 947-975, April.
More about this item
Keywords
Two-echelon production-inventory model; Random demand and return rate; Closed-loop supply chain; Remanufacturing; Inventory control;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:operea:v:20:y:2020:i:3:d:10.1007_s12351-018-0398-x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.