A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
- Dobos, Imre & Richter, Knut, 2006. "A production/recycling model with quality consideration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 571-579, December.
- Simme Douwe P. Flapper & Jo A.E.E. Nunen & Luk N. Wassenhove, 2005. "Future developments in managing closed-loop supply chains," Springer Books, in: Simme Douwe P. Flapper & Jo A.E.E. Nunen & Luk N. Wassenhove (ed.), Managing Closed-Loop Supply Chains, chapter 18, pages 197-206, Springer.
- Richter, Knut, 1996. "The extended EOQ repair and waste disposal model," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 443-447, August.
- Fleischmann, M., 2001. "Reverse Logistics Network Structures and Design," ERIM Report Series Research in Management ERS-2001-52-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Alamri, Adel A. & Syntetos, Aris A., 2018. "Beyond LIFO and FIFO: Exploring an Allocation-In-Fraction-Out (AIFO) policy in a two-warehouse inventory model," International Journal of Production Economics, Elsevier, vol. 206(C), pages 33-45.
- David A. Schrady, 1967. "A deterministic inventory model for reparable items," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 14(3), pages 391-398.
- Van Nguyen, Truong & Zhou, Li & Chong, Alain Yee Loong & Li, Boying & Pu, Xiaodie, 2020. "Predicting customer demand for remanufactured products: A data-mining approach," European Journal of Operational Research, Elsevier, vol. 281(3), pages 543-558.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
- Frank Montabon & Mark Pagell & Zhaohui Wu, 2016. "Making Sustainability Sustainable," Journal of Supply Chain Management, Institute for Supply Management, vol. 52(2), pages 11-27, April.
- Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
- Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Grosse, E. H. & Glock, C. H. & Jaber, M. Y., 2013. "The effect of worker learning and forgetting on storage reassignment decisions in order picking systems," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 62648, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Datta, T. K. & Paul, K. & Pal, A. K., 1998. "Demand promotion by upgradation under stock-dependent demand situation - a model," International Journal of Production Economics, Elsevier, vol. 55(1), pages 31-38, June.
- Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
- Alamri, Adel A. & Harris, Irina & Syntetos, Aris A., 2016. "Efficient inventory control for imperfect quality items," European Journal of Operational Research, Elsevier, vol. 254(1), pages 92-104.
- V. Daniel R. Guide & Terry P. Harrison & Luk N. Van Wassenhove, 2003. "The Challenge of Closed-Loop Supply Chains," Interfaces, INFORMS, vol. 33(6), pages 3-6, December.
- Ruud H. Teunter, 2001. "Economic ordering quantities for recoverable item inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(6), pages 484-495, September.
- Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
- Alamri, Adel. A. & Balkhi, Zaid T., 2007. "The effects of learning and forgetting on the optimal production lot size for deteriorating items with time varying demand and deterioration rates," International Journal of Production Economics, Elsevier, vol. 107(1), pages 125-138, May.
- Liu, Zhuojun & Diallo, Claver & Chen, Jing & Zhang, Michael, 2020. "Optimal pricing and production strategies for new and remanufactured products under a non-renewing free replacement warranty," International Journal of Production Economics, Elsevier, vol. 226(C).
- Hariga, Moncer A. & Benkherouf, Lakdere, 1994. "Optimal and heuristic inventory replenishment models for deteriorating items with exponential time-varying demand," European Journal of Operational Research, Elsevier, vol. 79(1), pages 123-137, November.
- Polotski, V. & Kenne, J.-P. & Gharbi, A., 2019. "Joint production and maintenance optimization in flexible hybrid Manufacturing–Remanufacturing systems under age-dependent deterioration," International Journal of Production Economics, Elsevier, vol. 216(C), pages 239-254.
- Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.
- Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Adel A. Alamri, 2023. "Carbon Emissions Effect on Vendor-Managed Inventory System Considering Displaced Re-Start-Up Production Time," Logistics, MDPI, vol. 7(4), pages 1-29, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sumit Maheshwari & Amrina Kausar & Ahmad Hasan & Chandra K. Jaggi, 2023. "Sustainable inventory model for a three-layer supply chain using optimal waste management," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 216-235, March.
- Lucas Dias Condeixa & Pierry Silva & Diego Moah & Brenda Farias & Adriana Leiras, 2022. "Evaluating cost impacts on reverse logistics using an Economic Order Quantity (EOQ) model with environmental and social considerations," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(3), pages 921-940, September.
- Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
- Taleizadeh, Ata Allah & Moshtagh, Mohammad Sadegh, 2019. "A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure," International Journal of Production Economics, Elsevier, vol. 217(C), pages 298-316.
- Bimal Kumar Mawandiya & J. K. Jha & Jitesh J. Thakkar, 2020. "Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return," Operational Research, Springer, vol. 20(3), pages 1623-1664, September.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
- Alamri, Adel A. & Syntetos, Aris A., 2018. "Beyond LIFO and FIFO: Exploring an Allocation-In-Fraction-Out (AIFO) policy in a two-warehouse inventory model," International Journal of Production Economics, Elsevier, vol. 206(C), pages 33-45.
- Ullah, Mehran & Sarkar, Biswajit, 2020. "Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality," International Journal of Production Economics, Elsevier, vol. 219(C), pages 360-374.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2011. "An economic production and remanufacturing model with learning effects," International Journal of Production Economics, Elsevier, vol. 131(1), pages 115-127, May.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Jaber, Mohamad Y. & Rosen, Marc A., 2008. "The economic order quantity repair and waste disposal model with entropy cost," European Journal of Operational Research, Elsevier, vol. 188(1), pages 109-120, July.
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- Hallak, Bassam K. & Nasr, Walid W. & Jaber, Mohamad Y., 2021. "Re-ordering policies for inventory systems with recyclable items and stochastic demand – Outsourcing vs. in-house recycling," Omega, Elsevier, vol. 105(C).
- Tahirov, Nail & Hasanov, Parviz & Jaber, Mohamad Y., 2016. "Optimization of closed-loop supply chain of multi-items with returned subassemblies," International Journal of Production Economics, Elsevier, vol. 174(C), pages 1-10.
- Biswajit Sarkar & Mehran Ullah & Seok-Beom Choi, 2019. "Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items," Mathematics, MDPI, vol. 7(6), pages 1-20, June.
- Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
More about this item
Keywords
reverse logistics; number of remanufacturing times; first remanufacturing cycle; time-varying parameters; demand dependent return rate;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:12:p:9517-:d:1170399. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.