Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing

Author

Listed:
  • Shaojun Lu

    (Hefei University of Technology
    Key Laboratory of Process Optimization and Intelligent Decision-Making of Ministry of Education)

  • Jun Pei

    (Hefei University of Technology
    University of Florida
    Key Laboratory of Process Optimization and Intelligent Decision-Making of Ministry of Education)

  • Xinbao Liu

    (Hefei University of Technology
    Key Laboratory of Process Optimization and Intelligent Decision-Making of Ministry of Education)

  • Xiaofei Qian

    (Hefei University of Technology
    Key Laboratory of Process Optimization and Intelligent Decision-Making of Ministry of Education)

  • Nenad Mladenovic

    (Khalifa University
    Ural Federal University)

  • Panos M. Pardalos

    (University of Florida)

Abstract

This paper investigates an integrated production and assembly scheduling problem with the practical manufacturing features of serial batching and the effects of deteriorating and learning. The problem is divided into two stages. During the production stage, there are several semi-product manufacturers who first produce ordered product components in batches, and then these processed components are sent to an assembly manufacturer. During the assembly stage, the assembly manufacturer will further process them on multiple assembly machines, where the product components are assembled into final products. Through mathematical induction, we characterize the structures of the optimal decision rules for the scheduling problem during the production stage, and a scheme is developed to solve this scheduling problem optimally based on the structural properties. Some useful lemmas are proposed for the scheduling problem during the assembly stage, and a heuristic algorithm is developed to eliminate the inappropriate schedules and enhance the solution quality. We then prove that the investigated problem is NP-hard. Motivated by this complexity result, we present a less-is-more-approach-based variable neighborhood search heuristic to obtain the approximately optimal solution for the problem. The computational experiments indicate that our designed LIMA-VNS (less is more approach–variable neighborhood search) has an advantage over other metaheuristics in terms of converge speed, solution quality, and robustness, especially for large-scale problems.

Suggested Citation

  • Shaojun Lu & Jun Pei & Xinbao Liu & Xiaofei Qian & Nenad Mladenovic & Panos M. Pardalos, 2020. "Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing," Journal of Scheduling, Springer, vol. 23(6), pages 649-664, December.
  • Handle: RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-019-00619-5
    DOI: 10.1007/s10951-019-00619-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10951-019-00619-5
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10951-019-00619-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yin, Yunqiang & Cheng, T.C.E. & Hsu, Chou-Jung & Wu, Chin-Chia, 2013. "Single-machine batch delivery scheduling with an assignable common due window," Omega, Elsevier, vol. 41(2), pages 216-225.
    2. Dominik Kress & Maksim Barketau & Erwin Pesch, 2018. "Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines," Journal of Scheduling, Springer, vol. 21(6), pages 595-606, December.
    3. C. N. Potts & S. V. Sevast'janov & V. A. Strusevich & L. N. Van Wassenhove & C. M. Zwaneveld, 1995. "The Two-Stage Assembly Scheduling Problem: Complexity and Approximation," Operations Research, INFORMS, vol. 43(2), pages 346-355, April.
    4. Ameni Azzouz & Meriem Ennigrou & Lamjed Ben Said, 2018. "Scheduling problems under learning effects: classification and cartography," International Journal of Production Research, Taylor & Francis Journals, vol. 56(4), pages 1642-1661, February.
    5. F. Tao & Y. Cheng & L. Zhang & A. Y. C. Nee, 2017. "Advanced manufacturing systems: socialization characteristics and trends," Journal of Intelligent Manufacturing, Springer, vol. 28(5), pages 1079-1094, June.
    6. Chin-Chia Wu & Du-Juan Wang & Shuenn-Ren Cheng & I-Hong Chung & Win-Chin Lin, 2018. "A two-stage three-machine assembly scheduling problem with a position-based learning effect," International Journal of Production Research, Taylor & Francis Journals, vol. 56(9), pages 3064-3079, May.
    7. Wang, Xiuli & Edwin Cheng, T.C., 2007. "Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 178(1), pages 57-70, April.
    8. Jun Pei & Xinbao Liu & Panos M. Pardalos & Athanasios Migdalas & Shanlin Yang, 2017. "Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine," Journal of Global Optimization, Springer, vol. 67(1), pages 251-262, January.
    9. Wenjuan Fan & Jun Pei & Xinbao Liu & Panos M. Pardalos & Min Kong, 2018. "Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning," Journal of Global Optimization, Springer, vol. 71(1), pages 147-163, May.
    10. Wang, Ji-Bo, 2007. "Single-machine scheduling problems with the effects of learning and deterioration," Omega, Elsevier, vol. 35(4), pages 397-402, August.
    11. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.
    12. Roh, James & Hong, Paul & Min, Hokey, 2014. "Implementation of a responsive supply chain strategy in global complexity: The case of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 147(PB), pages 198-210.
    13. Mor, Baruch & Mosheiov, Gur, 2011. "Single machine batch scheduling with two competing agents to minimize total flowtime," European Journal of Operational Research, Elsevier, vol. 215(3), pages 524-531, December.
    14. Shahvari, Omid & Logendran, Rasaratnam, 2018. "A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect," International Journal of Production Economics, Elsevier, vol. 195(C), pages 227-248.
    15. Hariri, A. M. A. & Potts, C. N., 1997. "A branch and bound algorithm for the two-stage assembly scheduling problem," European Journal of Operational Research, Elsevier, vol. 103(3), pages 547-556, December.
    16. Yin, Yunqiang & Wang, Yan & Cheng, T.C.E. & Liu, Wenqi & Li, Jinhai, 2017. "Parallel-machine scheduling of deteriorating jobs with potential machine disruptions," Omega, Elsevier, vol. 69(C), pages 17-28.
    17. Yunqiang Yin & Yongjian Yang & Dujuan Wang & T.C.E. Cheng & Chin‐Chia Wu, 2018. "Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(5), pages 393-409, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mohammad Rostami & Shiva Nikravesh & Mahdi Shahin, 2020. "Minimizing total weighted completion and batch delivery times with machine deterioration and learning effect: a case study from wax production," Operational Research, Springer, vol. 20(3), pages 1255-1287, September.
    2. Cheng, Bayi & Zhu, Huijun & Li, Kai & Li, Yongjun, 2019. "Optimization of batch operations with a truncated batch-position-based learning effect," Omega, Elsevier, vol. 85(C), pages 134-143.
    3. Cheng He & Chunqi Xu & Hao Lin, 2020. "Serial-batching scheduling with two agents to minimize makespan and maximum cost," Journal of Scheduling, Springer, vol. 23(5), pages 609-617, October.
    4. Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
    5. Koulamas, Christos & Kyparisis, George J., 2007. "A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 945-951, October.
    6. Hatami, Sara & Ruiz, Rubén & Andrés-Romano, Carlos, 2015. "Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 169(C), pages 76-88.
    7. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
    8. Zhang, Sicheng & Li, Xiang & Zhang, Bowen & Wang, Shouyang, 2020. "Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system," European Journal of Operational Research, Elsevier, vol. 283(2), pages 441-460.
    9. Pei, Jun & Pardalos, Panos M. & Liu, Xinbao & Fan, Wenjuan & Yang, Shanlin, 2015. "Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 244(1), pages 13-25.
    10. Dujuan Wang & Yugang Yu & Huaxin Qiu & Yunqiang Yin & T. C. E. Cheng, 2020. "Two‐agent scheduling with linear resource‐dependent processing times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(7), pages 573-591, October.
    11. Yokoyama, Masao, 2008. "Flow-shop scheduling with setup and assembly operations," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1184-1195, June.
    12. James Blocher & Dilip Chhajed, 2008. "Minimizing customer order lead-time in a two-stage assembly supply chain," Annals of Operations Research, Springer, vol. 161(1), pages 25-52, July.
    13. Park, Moon-Won & Kim, Yeong-Dae, 2000. "A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints," European Journal of Operational Research, Elsevier, vol. 123(3), pages 504-518, June.
    14. Yunqiang Yin & Doudou Li & Dujuan Wang & T. C. E. Cheng, 2021. "Single-machine serial-batch delivery scheduling with two competing agents and due date assignment," Annals of Operations Research, Springer, vol. 298(1), pages 497-523, March.
    15. Niloy J. Mukherjee & Subhash C. Sarin & Daniel A. Neira, 2023. "Lot streaming for a two-stage assembly system in the presence of handling costs," Journal of Scheduling, Springer, vol. 26(4), pages 335-351, August.
    16. Biskup, Dirk, 2008. "A state-of-the-art review on scheduling with learning effects," European Journal of Operational Research, Elsevier, vol. 188(2), pages 315-329, July.
    17. Kai-biao Sun & Hong-xing Li, 2009. "Some single-machine scheduling problems with actual time and position dependent learning effects," Fuzzy Information and Engineering, Springer, vol. 1(2), pages 161-177, June.
    18. Qian, Jianbo & Steiner, George, 2013. "Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 225(3), pages 547-551.
    19. Mohammad Rostami & Milad Mohammadi, 2024. "Two-machine decentralized flow shop scheduling problem with inter-factory batch delivery system," Operational Research, Springer, vol. 24(3), pages 1-37, September.
    20. Yunqiang Yin & Yongjian Yang & Dujuan Wang & T.C.E. Cheng & Chin‐Chia Wu, 2018. "Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(5), pages 393-409, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jsched:v:23:y:2020:i:6:d:10.1007_s10951-019-00619-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.