IDEAS home Printed from https://ideas.repec.org/a/spr/fuzinf/v1y2009i2d10.1007_s12543-009-0013-1.html
   My bibliography  Save this article

Some single-machine scheduling problems with actual time and position dependent learning effects

Author

Listed:
  • Kai-biao Sun

    (Dalian University of Technology)

  • Hong-xing Li

    (Dalian University of Technology)

Abstract

In this paper we study some single-machine scheduling problems with learning effects where the actual processing time of a job serves as a function of the total actual processing times of the jobs already processed and of its scheduled position. We show by examples that the optimal schedules for the classical version of problems are not optimal under this actual time and position dependent learning effect model for the following objectives: makespan, sum of kth power of the completion times, total weighted completion times, maximum lateness and number of tardy jobs. But under certain conditions, we show that the shortest processing time (SPT) rule, the weighted shortest processing time (WSPT) rule, the earliest due date (EDD) rule and the modified Moore’s Algorithm can also construct an optimal schedule for the problem of minimizing these objective functions, respectively.

Suggested Citation

  • Kai-biao Sun & Hong-xing Li, 2009. "Some single-machine scheduling problems with actual time and position dependent learning effects," Fuzzy Information and Engineering, Springer, vol. 1(2), pages 161-177, June.
  • Handle: RePEc:spr:fuzinf:v:1:y:2009:i:2:d:10.1007_s12543-009-0013-1
    DOI: 10.1007/s12543-009-0013-1
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12543-009-0013-1
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12543-009-0013-1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Koulamas, Christos & Kyparisis, George J., 2007. "Single-machine and two-machine flowshop scheduling with general learning functions," European Journal of Operational Research, Elsevier, vol. 178(2), pages 402-407, April.
    2. Biskup, Dirk, 1999. "Single-machine scheduling with learning considerations," European Journal of Operational Research, Elsevier, vol. 115(1), pages 173-178, May.
    3. Mosheiov, Gur, 2001. "Scheduling problems with a learning effect," European Journal of Operational Research, Elsevier, vol. 132(3), pages 687-693, August.
    4. Wang, Ji-Bo, 2007. "Single-machine scheduling problems with the effects of learning and deterioration," Omega, Elsevier, vol. 35(4), pages 397-402, August.
    5. D-L Yang & W-H Kuo, 2007. "Single-machine scheduling with an actual time-dependent learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1348-1353, October.
    6. Biskup, Dirk, 2008. "A state-of-the-art review on scheduling with learning effects," European Journal of Operational Research, Elsevier, vol. 188(2), pages 315-329, July.
    7. Kuo, Wen-Hung & Yang, Dar-Li, 2006. "Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1184-1190, October.
    8. Cheng, T. C. E. & Ding, Q. & Lin, B. M. T., 2004. "A concise survey of scheduling with time-dependent processing times," European Journal of Operational Research, Elsevier, vol. 152(1), pages 1-13, January.
    9. B Alidaee & N K Womer, 1999. "Scheduling with time dependent processing times: Review and extensions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 711-720, July.
    10. Wang, J.-B. & Ng, C.T. & Cheng, T.C.E. & Liu, L.L., 2008. "Single-machine scheduling with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 111(2), pages 802-811, February.
    11. W. Townsend, 1978. "The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution," Management Science, INFORMS, vol. 24(5), pages 530-534, January.
    12. Wang, Xiuli & Edwin Cheng, T.C., 2007. "Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 178(1), pages 57-70, April.
    13. T.C. Cheng & Guoqing Wang, 2000. "Single Machine Scheduling with Learning Effect Considerations," Annals of Operations Research, Springer, vol. 98(1), pages 273-290, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Min Ji & Yingchun Zhang & Yuan Zhang & T. C. E. Cheng & Yiwei Jiang, 2022. "Single-machine multitasking scheduling with job efficiency promotion," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 446-479, August.
    2. Jun Pei & Qingru Song & Baoyu Liao & Xinbao Liu & Panos M. Pardalos, 2021. "Parallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deterioration," Annals of Operations Research, Springer, vol. 298(1), pages 407-444, March.
    3. Jian-You Xu & Win-Chin Lin & Yu-Wei Chang & Yu-Hsiang Chung & Juin-Han Chen & Chin-Chia Wu, 2023. "A Two-Machine Learning Date Flow-Shop Scheduling Problem with Heuristics and Population-Based GA to Minimize the Makespan," Mathematics, MDPI, vol. 11(19), pages 1-21, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dar-Li Yang & Wen-Hung Kuo, 2009. "Single-machine scheduling with both deterioration and learning effects," Annals of Operations Research, Springer, vol. 172(1), pages 315-327, November.
    2. Heuser, Patricia & Tauer, Björn, 2023. "Single-machine scheduling with product category-based learning and forgetting effects," Omega, Elsevier, vol. 115(C).
    3. Jiang, Zhongyi & Chen, Fangfang & Kang, Huiyan, 2013. "Single-machine scheduling problems with actual time-dependent and job-dependent learning effect," European Journal of Operational Research, Elsevier, vol. 227(1), pages 76-80.
    4. Zhongyi Jiang & Fangfang Chen & Xiandong Zhang, 2017. "Single-machine scheduling with times-based and job-dependent learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(7), pages 809-815, July.
    5. J-B Wang, 2010. "Single-machine scheduling with a sum-of-actual-processing-time-based learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 172-177, January.
    6. Wen-Hung Wu & Yunqiang Yin & T C E Cheng & Win-Chin Lin & Juei-Chao Chen & Shin-Yi Luo & Chin-Chia Wu, 2017. "A combined approach for two-agent scheduling with sum-of-processing-times-based learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 111-120, February.
    7. Biskup, Dirk, 2008. "A state-of-the-art review on scheduling with learning effects," European Journal of Operational Research, Elsevier, vol. 188(2), pages 315-329, July.
    8. Ji-Bo Wang & Ming-Zheng Wang, 2011. "Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects," Annals of Operations Research, Springer, vol. 191(1), pages 155-169, November.
    9. Lai, Peng-Jen & Lee, Wen-Chiung, 2011. "Single-machine scheduling with general sum-of-processing-time-based and position-based learning effects," Omega, Elsevier, vol. 39(5), pages 467-471, October.
    10. W-H Kuo & D-L Yang, 2011. "A note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effects," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 206-210, January.
    11. Wang, J.-B. & Ng, C.T. & Cheng, T.C.E. & Liu, L.L., 2008. "Single-machine scheduling with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 111(2), pages 802-811, February.
    12. Qian, Jianbo & Steiner, George, 2013. "Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 225(3), pages 547-551.
    13. Li, Gang & Wang, Xiao-Yuan & Wang, Ji-Bo & Sun, Lin-Yan, 2013. "Worst case analysis of flow shop scheduling problems with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 142(1), pages 98-104.
    14. Wen-Hung Kuo, 2012. "Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect," Annals of Operations Research, Springer, vol. 196(1), pages 349-359, July.
    15. Lee, Wen-Chiung & Wu, Chin-Chia & Hsu, Peng-Hsiang, 2010. "A single-machine learning effect scheduling problem with release times," Omega, Elsevier, vol. 38(1-2), pages 3-11, February.
    16. Chang, Pei-Chann & Chen, Shih-Hsin & Mani, V., 2009. "A note on due-date assignment and single machine scheduling with a learning/aging effect," International Journal of Production Economics, Elsevier, vol. 117(1), pages 142-149, January.
    17. Xingong Zhang & Guangle Yan & Wanzhen Huang & Guochun Tang, 2011. "Single-machine scheduling problems with time and position dependent processing times," Annals of Operations Research, Springer, vol. 186(1), pages 345-356, June.
    18. Bai, Danyu & Tang, Mengqian & Zhang, Zhi-Hai & Santibanez-Gonzalez, Ernesto DR, 2018. "Flow shop learning effect scheduling problem with release dates," Omega, Elsevier, vol. 78(C), pages 21-38.
    19. Finke, Gerd & Gara-Ali, Ahmed & Espinouse, Marie-Laure & Jost, Vincent & Moncel, Julien, 2017. "Unified matrix approach to solve production-maintenance problems on a single machine," Omega, Elsevier, vol. 66(PA), pages 140-146.
    20. Cheng, T.C.E. & Shafransky, Y. & Ng, C.T., 2016. "An alternative approach for proving the NP-hardness of optimization problems," European Journal of Operational Research, Elsevier, vol. 248(1), pages 52-58.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:fuzinf:v:1:y:2009:i:2:d:10.1007_s12543-009-0013-1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.