Optimal Control of Production, Remanufacturing and Refurbishing Activities in a Finite Planning Horizon Inventory System
Author
Abstract
Suggested Citation
DOI: 10.1007/s10957-015-0741-9
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
- Konstantaras, I. & Papachristos, S., 2008. "A note on: Developing an exact solution for an inventory system with product recovery," International Journal of Production Economics, Elsevier, vol. 111(2), pages 707-712, February.
- Fleischmann, Mortiz & Krikke, Hans Ronald & Dekker, Rommert & Flapper, Simme Douwe P., 2000. "A characterisation of logistics networks for product recovery," Omega, Elsevier, vol. 28(6), pages 653-666, December.
- Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
- Talal M. Al-Khamis & Lakdere Benkherouf & Mohamed Omar, 2014. "Optimal policies for a finite-horizon batching inventory model," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(10), pages 2196-2202, October.
- Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jauhari, Wakhid Ahmad & Adam, Niimas Ayu Frensilia Putri & Rosyidi, Cucuk Nur & Pujawan, I Nyoman & Shah, Nita H., 2020. "A closed-loop supply chain model with rework, waste disposal, and carbon emissions," Operations Research Perspectives, Elsevier, vol. 7(C).
- Alireza Pooya & Morteza Pakdaman, 2019. "Optimal control model for finite capacity continuous MRP with deteriorating items," Journal of Intelligent Manufacturing, Springer, vol. 30(5), pages 2203-2215, June.
- Yiju Wang & Donglei Du & Jingfu Huang, 2021. "Optimal Replenishment Strategy for Inventory Mechanism with Step-Shaped Demand," Journal of Optimization Theory and Applications, Springer, vol. 190(3), pages 841-860, September.
- Samarghandi, Hamed, 2017. "Studying the impact of merged and divided storage policies on the profitability of a remanufacturing system with deteriorating revenues," International Journal of Production Economics, Elsevier, vol. 193(C), pages 160-171.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
- Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
- Taleizadeh, Ata Allah & Moshtagh, Mohammad Sadegh, 2019. "A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure," International Journal of Production Economics, Elsevier, vol. 217(C), pages 298-316.
- Tahirov, Nail & Hasanov, Parviz & Jaber, Mohamad Y., 2016. "Optimization of closed-loop supply chain of multi-items with returned subassemblies," International Journal of Production Economics, Elsevier, vol. 174(C), pages 1-10.
- Wenyuan Wang & Daniel Y. Mo & Yue Wang & Mitchell M. Tseng, 2019. "Assessing the cost structure of component reuse in a product family for remanufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 575-587, February.
- Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
- Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
- El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
- Bimal Kumar Mawandiya & J. K. Jha & Jitesh J. Thakkar, 2020. "Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return," Operational Research, Springer, vol. 20(3), pages 1623-1664, September.
- Mostafa Parsa & Ali Shahandeh Nookabadi & Zümbül Atan & Yaser Malekian, 2022. "An optimal inventory policy for a multi-echelon closed-loop supply chain of postconsumer recycled content products," Operational Research, Springer, vol. 22(3), pages 1887-1938, July.
- Sumit Maheshwari & Amrina Kausar & Ahmad Hasan & Chandra K. Jaggi, 2023. "Sustainable inventory model for a three-layer supply chain using optimal waste management," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 216-235, March.
- Adel A. Alamri, 2023. "A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times," Sustainability, MDPI, vol. 15(12), pages 1-23, June.
- Özceylan, Eren & Paksoy, Turan & Bektaş, Tolga, 2014. "Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 142-164.
- Schweiger, Katharina & Sahamie, Ramin, 2013. "A hybrid Tabu Search approach for the design of a paper recycling network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 50(C), pages 98-119.
- Caiado, Nathália & Guarnieri, Patricia & Xavier, Lúcia Helena & de Lorena Diniz Chaves, Gisele, 2017. "A characterization of the Brazilian market of reverse logistic credits (RLC) and an analogy with the existing carbon credit market," Resources, Conservation & Recycling, Elsevier, vol. 118(C), pages 47-59.
- Sicilia, Joaquín & González-De-la-Rosa, Manuel & Febles-Acosta, Jaime & Alcaide-López-de-Pablo, David, 2014. "Optimal policy for an inventory system with power demand, backlogged shortages and production rate proportional to demand rate," International Journal of Production Economics, Elsevier, vol. 155(C), pages 163-171.
- De Giovanni, Pietro & Zaccour, Georges, 2014. "A two-period game of a closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 232(1), pages 22-40.
More about this item
Keywords
Lot sizing; Remanufacturing; Inspection; Sorting; Finite planning horizon; Time-varying demand;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joptap:v:168:y:2016:i:2:d:10.1007_s10957-015-0741-9. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.