IDEAS home Printed from https://ideas.repec.org/a/rom/mancon/v8y2014i1p306-320.html
   My bibliography  Save this article

Harmony Search Algorithm For Solvingâ Two Aggregate Production Planning Models With Breakdowns And Maintenance

Author

Listed:
  • Esmaeil MEHDIZADEH
  • Amir Aydin Atashi ABKENAR

Abstract

Aggregate Production planning (APP) and preventive maintenance (PM) are most important issue carried out in manufacturing environments which seeks efficient planning, scheduling and coordination of all production activities that optimizes the company's objectives. In this paper, we develop two mixed integer linear programming (MILP) models for an integrated aggregate production planning system with return products, breakdowns and preventive maintenance. The goal is to minimize production breakdowns and Preventive maintenance costs and instabilities in the work force, inventory levels and downtimes, also effect of PM on the objective function. Additionally, Taguchi method is conducted to calibrate the parameter of the meta-heuristic and select the optimal levels of the algorithm’s performance influential factors. Due to NP-hard class of APP, we implement a harmony search (HS) algorithm for solving these models. Finally, computational results show that, the objective values obtained by APP with PM are better from APP with breakdowns results.

Suggested Citation

  • Esmaeil MEHDIZADEH & Amir Aydin Atashi ABKENAR, 2014. "Harmony Search Algorithm For Solvingâ Two Aggregate Production Planning Models With Breakdowns And Maintenance," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 8(1), pages 306-320, November.
  • Handle: RePEc:rom:mancon:v:8:y:2014:i:1:p:306-320
    as

    Download full text from publisher

    File URL: https://conference.management.ase.ro/archives/2014/pdf/29.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2014. "Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 175-186.
    2. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2012. "Integrating noncyclical preventive maintenance scheduling and production planning for a single machine," International Journal of Production Economics, Elsevier, vol. 136(2), pages 344-351.
    3. Ashayeri, J. & Teelen, A. & Selen, W.J., 1995. "A production model and maintenance planning model for the process industry," Discussion Paper 1995-6, Tilburg University, Center for Economic Research.
    4. Nam, Sang-jin & Logendran, Rasaratnam, 1992. "Aggregate production planning -- A survey of models and methodologies," European Journal of Operational Research, Elsevier, vol. 61(3), pages 255-272, September.
    5. Nourelfath, Mustapha & Châtelet, Eric, 2012. "Integrating production, inventory and maintenance planning for a parallel system with dependent components," Reliability Engineering and System Safety, Elsevier, vol. 101(C), pages 59-66.
    6. Aghezzaf, E.H. & Jamali, M.A. & Ait-Kadi, D., 2007. "An integrated production and preventive maintenance planning model," European Journal of Operational Research, Elsevier, vol. 181(2), pages 679-685, September.
    7. Ashayeri, J. & Teelen, A. & Selen, W.J., 1995. "A production model and maintenance planning model for the process industry," Other publications TiSEM d1553893-a00f-47fe-ae8a-b, Tilburg University, School of Economics and Management.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2014. "Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 175-186.
    2. Ali Salmasnia & Ali Talesh-Kazemi, 2022. "Integrating inventory planning, pricing and maintenance for perishable products in a two-component parallel manufacturing system with common cause failures," Operational Research, Springer, vol. 22(2), pages 1235-1265, April.
    3. Fahimeh Shamsaei & Mathieu Vyve, 2017. "Solving integrated production and condition-based maintenance planning problems by MIP modeling," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 184-202, June.
    4. Ali Salmasnia & Ali Talesh-Kazemi & Mohammad Reza Maleki, 2022. "Joint optimization of inventory planning, maintenance policy and pricing for perishable complementary products by considering the product freshness and technology level," Economia e Politica Industriale: Journal of Industrial and Business Economics, Springer;Associazione Amici di Economia e Politica Industriale, vol. 49(4), pages 713-746, December.
    5. Aghezzaf, El-Houssaine & Khatab, Abdelhakim & Tam, Phuoc Le, 2016. "Optimizing production and imperfect preventive maintenance planning׳s integration in failure-prone manufacturing systems," Reliability Engineering and System Safety, Elsevier, vol. 145(C), pages 190-198.
    6. Liu, Yu & Zhang, Qin & Ouyang, Zhiyuan & Huang, Hong-Zhong, 2021. "Integrated production planning and preventive maintenance scheduling for synchronized parallel machines," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    7. Absi, Nabil & van den Heuvel, Wilco & Dauzère-Pérès, Stéphane, 2024. "Complexity analysis of integrated dynamic lot sizing and maintenance planning problems," European Journal of Operational Research, Elsevier, vol. 318(1), pages 100-109.
    8. Daniel Owusu-Mensah & Ren Naifei & Lydia Brako & Priscilla Boateng & Williams Kweku Darkwah, 2020. "Analysis of Production System Management of Ghana¡¯s Food and Beverage Industry: Empirical evidence from Spare Parts Inventory Control, Production Quality and Maintenance Modeling," Journal of Food Industry, Macrothink Institute, vol. 4(1), pages 1-43, November.
    9. Fakher, Hossein Beheshti & Nourelfath, Mustapha & Gendreau, Michel, 2018. "Integrating production, maintenance and quality: A multi-period multi-product profit-maximization model," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 191-201.
    10. Mohammed Haoues & Mohammed Dahane & Nadia Kenza Mouss, 2019. "Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 701-725, February.
    11. Jiawen Hu & Zuhua Jiang & Hong Wang, 2017. "Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-28, August.
    12. Xiao, Lei & Song, Sanling & Chen, Xiaohui & Coit, David W., 2016. "Joint optimization of production scheduling and machine group preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 146(C), pages 68-78.
    13. Qinming Liu & Ming Dong & Wenyuan Lv & Chunming Ye, 2019. "Manufacturing system maintenance based on dynamic programming model with prognostics information," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1155-1173, March.
    14. Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.
    15. Azizi, Fariba & Salari, Nooshin, 2023. "A novel condition-based maintenance framework for parallel manufacturing systems based on bivariate birth/birth–death processes," Reliability Engineering and System Safety, Elsevier, vol. 229(C).
    16. Ornella Tarola, 2010. "Public Utilities: Privatization without Regulation," Czech Economic Review, Charles University Prague, Faculty of Social Sciences, Institute of Economic Studies, vol. 4(1), pages 062-078, March.
    17. Xuejuan Liu & Wenbin Wang & Rui Peng & Fei Zhao, 2015. "A delay-time-based inspection model for parallel systems," Journal of Risk and Reliability, , vol. 229(6), pages 556-567, December.
    18. Chen, Yiming & Liu, Yu & Jiang, Tao, 2021. "Optimal maintenance strategy for multi-state systems with single maintenance capacity and arbitrarily distributed maintenance time," Reliability Engineering and System Safety, Elsevier, vol. 211(C).
    19. Lin Wang & Zhiqiang Lu & Yifei Ren, 2019. "A rolling horizon approach for production planning and condition-based maintenance under uncertain demand," Journal of Risk and Reliability, , vol. 233(6), pages 1014-1028, December.
    20. Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rom:mancon:v:8:y:2014:i:1:p:306-320. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ciocoiu Nadia Carmen (email available below). General contact details of provider: https://edirc.repec.org/data/mnasero.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.