A method for aligning serial batching decisions in a two-level organization of factory and distributed workstations
Author
Abstract
Suggested Citation
DOI: 10.1007/s10845-014-0951-2
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Miragliotta, Giovanni & Perona, Marco, 2005. "Decentralised, multi-objective driven scheduling for reentrant shops: A conceptual development and a test case," European Journal of Operational Research, Elsevier, vol. 167(3), pages 644-662, December.
- Li, Na & Zhang, Mike Tao & Deng, Shiming & Lee, Zu-Hsu & Zhang, Lawrence & Zheng, Li, 2007. "Single-station performance evaluation and improvement in semiconductor manufacturing: A graphical approach," International Journal of Production Economics, Elsevier, vol. 107(2), pages 397-403, June.
- Yuan, J.J. & Lin, Y.X. & Cheng, T.C.E. & Ng, C.T., 2007. "Single machine serial-batching scheduling problem with a common batch size to minimize total weighted completion time," International Journal of Production Economics, Elsevier, vol. 105(2), pages 402-406, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Dugardin, Frédéric & Yalaoui, Farouk & Amodeo, Lionel, 2010. "New multi-objective method to solve reentrant hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 203(1), pages 22-31, May.
- Jun-Qiang Wang & Guo-Qiang Fan & Zhixin Liu, 2020. "Mixed batch scheduling on identical machines," Journal of Scheduling, Springer, vol. 23(4), pages 487-496, August.
- Gur Mosheiov & Daniel Oron, 2023. "A note on batch scheduling on a two-machine flowshop with machine-dependent processing times," 4OR, Springer, vol. 21(3), pages 457-469, September.
- Mor, Baruch & Mosheiov, Gur, 2014. "Batch scheduling with a rate-modifying maintenance activity to minimize total flowtime," International Journal of Production Economics, Elsevier, vol. 153(C), pages 238-242.
- Mohamed Ali Aloulou & Afef Bouzaiene & Najoua Dridi & Daniel Vanderpooten, 2009. "The two-machine ow-shop serial-batching scheduling problem with limited batch size," Working Papers hal-00877036, HAL.
- Tirkel, Israel & Rabinowitz, Gad, 2014. "Modeling cost benefit analysis of inspection in a production line," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 38-45.
- Jae-Min Yu & Rong Huang & Dong-Ho Lee, 2017. "Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3266-3282, June.
- Pradhan, Salil & Damodaran, Purushothaman, 2009. "Performance characterization of complex manufacturing systems with general distributions and job failures," European Journal of Operational Research, Elsevier, vol. 197(2), pages 588-598, September.
- Otto, Alena & Li, Xiyu, 2020. "Product sequencing in multiple-piece-flow assembly lines," Omega, Elsevier, vol. 91(C).
- Chen-Fu Chien & Chung-Jen Kuo & Chih-Min Yu, 2020. "Tool allocation to smooth work-in-process for cycle time reduction and an empirical study," Annals of Operations Research, Springer, vol. 290(1), pages 1009-1033, July.
- Kalir, Adar A. & Sarin, Subhash C., 2009. "A method for reducing inter-departure time variability in serial production lines," International Journal of Production Economics, Elsevier, vol. 120(2), pages 340-347, August.
- Baoyu Liao & Qingru Song & Jun Pei & Shanlin Yang & Panos M. Pardalos, 2020. "Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration," Journal of Global Optimization, Springer, vol. 78(4), pages 717-742, December.
- Wenhua Li & Jinjiang Yuan & Yixun Lin, 2007. "A note on special optimal batching structures to minimize total weighted completion time," Journal of Combinatorial Optimization, Springer, vol. 14(4), pages 475-480, November.
More about this item
Keywords
Distributed manufacturing control; Setup reduction; Job batching; Serial-batch production;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joinma:v:27:y:2016:i:6:d:10.1007_s10845-014-0951-2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.