Performance characterization of complex manufacturing systems with general distributions and job failures

Author

Listed:
  • Pradhan, Salil
  • Damodaran, Purushothaman

Abstract

In optoelectronics assembly, the first few stages of the assembly line are dedicated to build the product and the later stages are dedicated for calibration and testing. The assembly line is arranged in a flow shop environment with multiple processors at each stage. When a product (or job) fails at a stage, it is routed back to one of the previous stages or to the same stage (depending upon the nature of the failure). Consequently, the product could circulate between the current stage and the previous stage(s) before it is transferred to the next stage. Estimating the performance measures of such complex manufacturing systems, while considering multiple product classes, random job failures, and resource sharing, is not trivial. This paper presents the approximations used to estimate the performance measures of such complex manufacturing systems with general arrival and service distributions. The analytical approximations have been validated using discrete event simulation and the source of error between them is identified. These approximations can be used by operations managers to estimate the performance measures such as WIP and flow time.

Suggested Citation

  • Pradhan, Salil & Damodaran, Purushothaman, 2009. "Performance characterization of complex manufacturing systems with general distributions and job failures," European Journal of Operational Research, Elsevier, vol. 197(2), pages 588-598, September.
  • Handle: RePEc:eee:ejores:v:197:y:2009:i:2:p:588-598
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00515-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nazzal, Dima & Mollaghasemi, Mansooreh & Anderson, Dave, 2006. "A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility--a case study," International Journal of Production Economics, Elsevier, vol. 100(2), pages 300-313, April.
    2. Souza, Gilvan C. & Wagner, Harvey M. & Whybark, D. Clay, 2001. "Evaluating focused factory benefits with queuing theory," European Journal of Operational Research, Elsevier, vol. 128(3), pages 597-610, February.
    3. Yang, Taho & Lee, Rong-Shean & Chen, Mu-Chen & Chen, Pangwei, 2005. "Queueing network model for a single-operator machine interference problem with external operations," European Journal of Operational Research, Elsevier, vol. 167(1), pages 163-178, November.
    4. Ward Whitt, 1982. "Approximating a Point Process by a Renewal Process, I: Two Basic Methods," Operations Research, INFORMS, vol. 30(1), pages 125-147, February.
    5. Li, Na & Zhang, Mike Tao & Deng, Shiming & Lee, Zu-Hsu & Zhang, Lawrence & Zheng, Li, 2007. "Single-station performance evaluation and improvement in semiconductor manufacturing: A graphical approach," International Journal of Production Economics, Elsevier, vol. 107(2), pages 397-403, June.
    6. Goddard, John & Tavakoli, Manouche, 2008. "Efficiency and welfare implications of managed public sector hospital waiting lists," European Journal of Operational Research, Elsevier, vol. 184(2), pages 778-792, January.
    7. Pradhan, Salil & Damodaran, Purushothaman & Srihari, Krishnaswami, 2008. "Predicting performance measures for Markovian type of manufacturing systems with product failures," European Journal of Operational Research, Elsevier, vol. 184(2), pages 725-744, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu, Jialu & Yang, Sheng & Wu, Aiguo & Hu, S. Jack, 2012. "Multi-state throughput analysis of a two-stage manufacturing system with parallel unreliable machines and a finite buffer," European Journal of Operational Research, Elsevier, vol. 219(2), pages 296-304.
    2. Hulett, Maria & Damodaran, Purushothaman, 2011. "Analytical approximations to predict performance measures of markovian type manufacturing systems with job failures and parallel processing," European Journal of Operational Research, Elsevier, vol. 212(1), pages 89-99, July.
    3. Shraga Shoval & Mahmoud Efatmaneshnik & Michael J. Ryan, 2017. "Assembly sequence planning for processes with heterogeneous reliabilities," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2806-2828, May.
    4. Damodaran, Purushothaman & Hulett, Maria, 2012. "Analytical approximations to predict performance measures of manufacturing systems with general distributions, job failures and parallel processing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 74-86.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chen-Fu Chien & Chung-Jen Kuo & Chih-Min Yu, 2020. "Tool allocation to smooth work-in-process for cycle time reduction and an empirical study," Annals of Operations Research, Springer, vol. 290(1), pages 1009-1033, July.
    2. Hulett, Maria & Damodaran, Purushothaman, 2011. "Analytical approximations to predict performance measures of markovian type manufacturing systems with job failures and parallel processing," European Journal of Operational Research, Elsevier, vol. 212(1), pages 89-99, July.
    3. Pradhan, Salil & Damodaran, Purushothaman & Srihari, Krishnaswami, 2008. "Predicting performance measures for Markovian type of manufacturing systems with product failures," European Journal of Operational Research, Elsevier, vol. 184(2), pages 725-744, January.
    4. Girish, Muckai K. & Hu, Jian-Qiang, 2000. "Higher order approximations for the single server queue with splitting, merging and feedback," European Journal of Operational Research, Elsevier, vol. 124(3), pages 447-467, August.
    5. Berkley, Blair J., 1996. "Analyzing service blueprints using phase distributions," European Journal of Operational Research, Elsevier, vol. 88(1), pages 152-164, January.
    6. Shin, Yang Woo & Moon, Dug Hee, 2011. "Approximation of M/M/c retrial queue with PH-retrial times," European Journal of Operational Research, Elsevier, vol. 213(1), pages 205-209, August.
    7. Morabito, Reinaldo & de Souza, Mauricio C. & Vazquez, Mariana, 2014. "Approximate decomposition methods for the analysis of multicommodity flow routing in generalized queuing networks," European Journal of Operational Research, Elsevier, vol. 232(3), pages 618-629.
    8. Wall, A.D. & Worthington, D.J., 2007. "Time-dependent analysis of virtual waiting time behaviour in discrete time queues," European Journal of Operational Research, Elsevier, vol. 178(2), pages 482-499, April.
    9. Ghanmi, Ahmed, 2006. "Modeling and analysis of a Canadian Forces Geomatics division workflow," European Journal of Operational Research, Elsevier, vol. 170(3), pages 1001-1016, May.
    10. Nasr, Walid W. & Elshar, Ibrahim J., 2018. "Continuous inventory control with stochastic and non-stationary Markovian demand," European Journal of Operational Research, Elsevier, vol. 270(1), pages 198-217.
    11. Kerbache, Laoucine & MacGregor Smith, James, 2004. "Queueing networks and the topological design of supply chain systems," International Journal of Production Economics, Elsevier, vol. 91(3), pages 251-272, October.
    12. Hallak, Bassam K. & Nasr, Walid W. & Jaber, Mohamad Y., 2021. "Re-ordering policies for inventory systems with recyclable items and stochastic demand – Outsourcing vs. in-house recycling," Omega, Elsevier, vol. 105(C).
    13. Wu, Shaomin, 2021. "Two methods to approximate the superposition of imperfect failure processes," Reliability Engineering and System Safety, Elsevier, vol. 207(C).
    14. Dai, Melody D. M. & Schonfeld, Paul, 1998. "Metamodels for estimating waterway delays through series of queues," Transportation Research Part B: Methodological, Elsevier, vol. 32(1), pages 1-19, January.
    15. Mariotti, Giuliano & Siciliani, Luigi & Rebba, Vincenzo & Fellini, Rita & Gentilini, Maria & Benea, Giorgio & Bertoli, Pierpaolo & Bistolfi, Lorenzo & Brugaletta, Salvatore & Camboa, Pierluigi & Casuc, 2014. "Waiting time prioritisation for specialist services in Italy: The homogeneous waiting time groups approach," Health Policy, Elsevier, vol. 117(1), pages 54-63.
    16. Chou, Yon-Chun & Cheng, C.-T. & Yang, Feng-Cheng & Liang, Yi-Yu, 2007. "Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios," International Journal of Production Economics, Elsevier, vol. 105(2), pages 591-606, February.
    17. Vanteddu, Gangaraju & Chinnam, Ratna Babu & Gushikin, Oleg, 2011. "Supply chain focus dependent supplier selection problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 204-216, January.
    18. Kiesmüller, G.P., 2010. "Multi-item inventory control with full truckloads: A comparison of aggregate and individual order triggering," European Journal of Operational Research, Elsevier, vol. 200(1), pages 54-62, January.
    19. Thu-Ba T. Nguyen & Appa Iyer Sivakumar & Stephen C. Graves, 2017. "Scheduling rules to achieve lead-time targets in outpatient appointment systems," Health Care Management Science, Springer, vol. 20(4), pages 578-589, December.
    20. Damodaran, Purushothaman & Hulett, Maria, 2012. "Analytical approximations to predict performance measures of manufacturing systems with general distributions, job failures and parallel processing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 74-86.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:197:y:2009:i:2:p:588-598. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.