IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v45y2023i3d10.1007_s10878-023-01020-x.html
   My bibliography  Save this article

Multitasking scheduling with alternate periods

Author

Listed:
  • Yujia Huo

    (Qufu Normal University)

  • Cuixia Miao

    (Qufu Normal University)

  • Fanyu Kong

    (Qufu Normal University)

  • Yuzhong Zhang

    (Qufu Normal University)

Abstract

In this paper, we consider the multitasking scheduling with alternate odd-period and even-period. For the minimization of makespan on one single machine, we present a 2-approximation algorithm for the general case and a $$\frac{4}{3}$$ 4 3 -approximation algorithm for a special case when jobs have identical release dates. And we prove that the problem is strongly NP-hard when jobs have different release dates. For the minimization of makespan on identical parallel machines, we present a $$(\frac{5}{2}-\frac{1}{m})$$ ( 5 2 - 1 m ) -approximation algorithm for the general case and a pseudo-polynomial time algorithm when the number of machines is constant. Furthermore, we prove that the single-machine scheduling of minimizing the lateness is strongly NP-hard.

Suggested Citation

  • Yujia Huo & Cuixia Miao & Fanyu Kong & Yuzhong Zhang, 2023. "Multitasking scheduling with alternate periods," Journal of Combinatorial Optimization, Springer, vol. 45(3), pages 1-13, April.
  • Handle: RePEc:spr:jcomop:v:45:y:2023:i:3:d:10.1007_s10878-023-01020-x
    DOI: 10.1007/s10878-023-01020-x
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-023-01020-x
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-023-01020-x?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ming Liu & Shijin Wang & Feifeng Zheng & Chengbin Chu, 2017. "Algorithms for the joint multitasking scheduling and common due date assignment problem," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 6052-6066, October.
    2. Zhanguo Zhu & Jinlin Li & Chengbin Chu, 2017. "Multitasking Scheduling Problems with Deterioration Effect," Mathematical Problems in Engineering, Hindawi, vol. 2017, pages 1-10, April.
    3. Yongjian Yang & Guangqiang Yin & Chunyu Wang & Yunqiang Yin, 2022. "Due date assignment and two-agent scheduling under multitasking environment," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2207-2223, November.
    4. Zhanguo Zhu & Feifeng Zheng & Chengbin Chu, 2017. "Multitasking scheduling problems with a rate-modifying activity," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 296-312, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xinyu Sun & Tao Liu & Xin-Na Geng & Yang Hu & Jing-Xiao Xu, 2023. "Optimization of scheduling problems with deterioration effects and an optional maintenance activity," Journal of Scheduling, Springer, vol. 26(3), pages 251-266, June.
    2. Xu, Shuling & Hall, Nicholas G., 2021. "Fatigue, personnel scheduling and operations: Review and research opportunities," European Journal of Operational Research, Elsevier, vol. 295(3), pages 807-822.
    3. Xiaoyun Xiong & Peng Zhou & Yunqiang Yin & T. C. E. Cheng & Dengfeng Li, 2019. "An exact branch‐and‐price algorithm for multitasking scheduling on unrelated parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(6), pages 502-516, September.
    4. Gur Mosheiov & Daniel Oron, 2020. "Scheduling problems with a weight-modifying-activity," Annals of Operations Research, Springer, vol. 295(2), pages 737-745, December.
    5. Hongyu He & Yanzhi Zhao & Xiaojun Ma & Zheng-Guo Lv & Ji-Bo Wang, 2023. "Branch-and-Bound and Heuristic Algorithms for Group Scheduling with Due-Date Assignment and Resource Allocation," Mathematics, MDPI, vol. 11(23), pages 1-14, November.
    6. Lei Pan & Xinyu Sun & Ji-Bo Wang & Li-Han Zhang & Dan-Yang Lv, 2023. "Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs," Journal of Combinatorial Optimization, Springer, vol. 45(4), pages 1-16, May.
    7. Sang, Yao-Wen & Wang, Jun-Qiang & Sterna, Małgorzata & Błażewicz, Jacek, 2023. "Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work," Omega, Elsevier, vol. 121(C).
    8. Min Ji & Yingchun Zhang & Yuan Zhang & T. C. E. Cheng & Yiwei Jiang, 2022. "Single-machine multitasking scheduling with job efficiency promotion," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 446-479, August.
    9. Yongjian Yang & Guangqiang Yin & Chunyu Wang & Yunqiang Yin, 0. "Due date assignment and two-agent scheduling under multitasking environment," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-17.
    10. Yongjian Yang & Guangqiang Yin & Chunyu Wang & Yunqiang Yin, 2022. "Due date assignment and two-agent scheduling under multitasking environment," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2207-2223, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:45:y:2023:i:3:d:10.1007_s10878-023-01020-x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.