Effects of OCRA parameters and learning rate on machine scheduling
Author
Abstract
Suggested Citation
DOI: 10.1007/s10100-020-00708-3
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Mossa, G. & Boenzi, F. & Digiesi, S. & Mummolo, G. & Romano, V.A., 2016. "Productivity and ergonomic risk in human based production systems: A job-rotation scheduling model," International Journal of Production Economics, Elsevier, vol. 171(P4), pages 471-477.
- Tiacci, Lorenzo & Mimmi, Mario, 2018. "Integrating ergonomic risks evaluation through OCRA index and balancing/sequencing decisions for mixed model stochastic asynchronous assembly lines," Omega, Elsevier, vol. 78(C), pages 112-138.
- Sebnem Demirkol Akyol & Adil Baykasoğlu, 2019. "A multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 557-573, February.
- Voutsinas, Theodore G. & Pappis, Costas P., 2002. "Scheduling jobs with values exponentially deteriorating over time," International Journal of Production Economics, Elsevier, vol. 79(3), pages 163-169, October.
- Panwalkar, S. S. & Rajagopalan, R., 1992. "Single-machine sequencing with controllable processing times," European Journal of Operational Research, Elsevier, vol. 59(2), pages 298-302, June.
- Aven, Terje, 2016. "Risk assessment and risk management: Review of recent advances on their foundation," European Journal of Operational Research, Elsevier, vol. 253(1), pages 1-13.
- Sebnem Demirkol Akyol & Adil Baykasoğlu, 2019. "ErgoALWABP: a multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem under ergonomic risk factors," Journal of Intelligent Manufacturing, Springer, vol. 30(1), pages 291-302, January.
- Chen, Qianqian & Lin, Ling & Tan, Zhiyi & Yan, Yujie, 2017. "Coordination mechanisms for scheduling games with proportional deterioration," European Journal of Operational Research, Elsevier, vol. 263(2), pages 380-389.
- Biskup, Dirk, 1999. "Single-machine scheduling with learning considerations," European Journal of Operational Research, Elsevier, vol. 115(1), pages 173-178, May.
- Wang, Ji-Bo, 2007. "Single-machine scheduling problems with the effects of learning and deterioration," Omega, Elsevier, vol. 35(4), pages 397-402, August.
- Kuo, Wen-Hung & Yang, Dar-Li, 2006. "Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1184-1190, October.
- Chen, Rubing & Yuan, Jinjiang & Geng, Zhichao, 2020. "ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost," Applied Mathematics and Computation, Elsevier, vol. 365(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
- Koulamas, Christos & Gupta, Sushil & Kyparisis, George J., 2010. "A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times," European Journal of Operational Research, Elsevier, vol. 205(2), pages 479-482, September.
- W-H Kuo & D-L Yang, 2011. "A note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effects," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 206-210, January.
- Chang, Pei-Chann & Chen, Shih-Hsin & Mani, V., 2009. "A note on due-date assignment and single machine scheduling with a learning/aging effect," International Journal of Production Economics, Elsevier, vol. 117(1), pages 142-149, January.
- Zoltán Varga & Pál Simon, 2014. "Examination Of Scheduling Methods For Production Systems," Advanced Logistic systems, University of Miskolc, Department of Material Handling and Logistics, vol. 8(1), pages 111-120, December.
- Biskup, Dirk, 2008. "A state-of-the-art review on scheduling with learning effects," European Journal of Operational Research, Elsevier, vol. 188(2), pages 315-329, July.
- Kai-biao Sun & Hong-xing Li, 2009. "Some single-machine scheduling problems with actual time and position dependent learning effects," Fuzzy Information and Engineering, Springer, vol. 1(2), pages 161-177, June.
- Lai, Peng-Jen & Lee, Wen-Chiung, 2011. "Single-machine scheduling with general sum-of-processing-time-based and position-based learning effects," Omega, Elsevier, vol. 39(5), pages 467-471, October.
- Dar-Li Yang & Wen-Hung Kuo, 2009. "Single-machine scheduling with both deterioration and learning effects," Annals of Operations Research, Springer, vol. 172(1), pages 315-327, November.
- Jian-You Xu & Win-Chin Lin & Yu-Wei Chang & Yu-Hsiang Chung & Juin-Han Chen & Chin-Chia Wu, 2023. "A Two-Machine Learning Date Flow-Shop Scheduling Problem with Heuristics and Population-Based GA to Minimize the Makespan," Mathematics, MDPI, vol. 11(19), pages 1-21, September.
- Heuser, Patricia & Tauer, Björn, 2023. "Single-machine scheduling with product category-based learning and forgetting effects," Omega, Elsevier, vol. 115(C).
- Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
- Wang, J.-B. & Ng, C.T. & Cheng, T.C.E. & Liu, L.L., 2008. "Single-machine scheduling with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 111(2), pages 802-811, February.
- Xingong Zhang & Guangle Yan & Wanzhen Huang & Guochun Tang, 2011. "Single-machine scheduling problems with time and position dependent processing times," Annals of Operations Research, Springer, vol. 186(1), pages 345-356, June.
- Wen-Hung Wu & Yunqiang Yin & T C E Cheng & Win-Chin Lin & Juei-Chao Chen & Shin-Yi Luo & Chin-Chia Wu, 2017. "A combined approach for two-agent scheduling with sum-of-processing-times-based learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 111-120, February.
- Li, Gang & Wang, Xiao-Yuan & Wang, Ji-Bo & Sun, Lin-Yan, 2013. "Worst case analysis of flow shop scheduling problems with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 142(1), pages 98-104.
- Corominas, Albert & Olivella, Jordi & Pastor, Rafael, 2010. "A model for the assignment of a set of tasks when work performance depends on experience of all tasks involved," International Journal of Production Economics, Elsevier, vol. 126(2), pages 335-340, August.
- D-L Yang & W-H Kuo, 2007. "Single-machine scheduling with an actual time-dependent learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1348-1353, October.
- Wen-Hung Kuo, 2012. "Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect," Annals of Operations Research, Springer, vol. 196(1), pages 349-359, July.
- Eryk Szwarc & Grzegorz Bocewicz & Paulina Golińska-Dawson & Zbigniew Banaszak, 2023. "Proactive Operations Management: Staff Allocation with Competence Maintenance Constraints," Sustainability, MDPI, vol. 15(3), pages 1-20, January.
More about this item
Keywords
Machine Scheduling; Learning Rate; Risk Assessment; Risk Based Deterioration; WMSD; OHSAS; Ergonomics; OCRA; ANOVA;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:30:y:2022:i:3:d:10.1007_s10100-020-00708-3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.