Revenue sharing for resource reallocation among project activity contractors
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-020-03753-y
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- H. Peyton Young, 1987. "On Dividing an Amount According to Individual Claims or Liabilities," Mathematics of Operations Research, INFORMS, vol. 12(3), pages 398-414, August.
- Rodica Brânzei & Giulio Ferrari & Vito Fragnelli & Stef Tijs, 2002.
"Two Approaches to the Problem of Sharing Delay Costs in Joint Projects,"
Annals of Operations Research, Springer, vol. 109(1), pages 359-374, January.
- Brânzei, R. & Ferrari, G. & Fragnelli, V. & Tijs, S.H., 2001. "Two Approaches to the Problem of Sharing Delay Costs in Joint Projects," Discussion Paper 2001-22, Tilburg University, Center for Economic Research.
- Brânzei, R. & Ferrari, G. & Fragnelli, V. & Tijs, S.H., 2002. "Two approaches to the problem of sharing delay costs in joint projects," Other publications TiSEM 7e547fec-4bc3-412c-9199-3, Tilburg University, School of Economics and Management.
- Brânzei, R. & Ferrari, G. & Fragnelli, V. & Tijs, S.H., 2001. "Two Approaches to the Problem of Sharing Delay Costs in Joint Projects," Other publications TiSEM 0c51f267-e6c5-4d4e-a05f-d, Tilburg University, School of Economics and Management.
- Kedar Naphade & S. David Wu & Robert Storer, 1997. "Problem space search algorithms for resource-constrained project scheduling," Annals of Operations Research, Springer, vol. 70(0), pages 307-326, April.
- Jeroen Suijs & Peter Borm & Herbert Hamers & Marieke Quant & Maurice Koster, 2005.
"Communication and Cooperation in Public Network Situations,"
Annals of Operations Research, Springer, vol. 137(1), pages 117-140, July.
- Suijs, J.P.M. & Borm, P.E.M. & Hamers, H.J.M. & Koster, M.A.L. & Quant, M., 2001. "Communications and Cooperation in Public Network Situations," Discussion Paper 2001-44, Tilburg University, Center for Economic Research.
- Suijs, J.P.M. & Borm, P.E.M. & Hamers, H.J.M. & Koster, M.A.L. & Quant, M., 2001. "Communications and Cooperation in Public Network Situations," Other publications TiSEM 385509cd-511d-410c-aa23-2, Tilburg University, School of Economics and Management.
- Kolisch, Rainer, 1996. "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, Elsevier, vol. 90(2), pages 320-333, April.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- Bezalel Peleg & Peter Sudhölter, 2007. "Introduction to the Theory of Cooperative Games," Theory and Decision Library C, Springer, edition 0, number 978-3-540-72945-7, December.
- Trine Platz & Herbert Hamers, 2015.
"On games arising from multi-depot Chinese postman problems,"
Annals of Operations Research, Springer, vol. 235(1), pages 675-692, December.
- Platz, Trine Tornøe & Hamers, Herbert, 2012. "On games arising from multi-depot Chinese postman problems," Discussion Papers on Economics 24/2012, University of Southern Denmark, Department of Economics.
- Platz, T.T. & Hamers, H.J.M., 2013. "On Games Arising From Multi-Depot Chinese Postman Problems," Other publications TiSEM 6f68c9c0-75bc-4060-9ee3-4, Tilburg University, School of Economics and Management.
- Platz, T.T. & Hamers, H.J.M., 2013. "On Games Arising From Multi-Depot Chinese Postman Problems," Discussion Paper 2013-005, Tilburg University, Center for Economic Research.
- Ichiro Nishizaki & Tomohiro Hayashida & Yuki Shintomi, 2016. "A core-allocation for a network restricted linear production game," Annals of Operations Research, Springer, vol. 238(1), pages 389-410, March.
- Shapley, Lloyd S & Shubik, Martin, 1969. "Pure Competition, Coalitional Power, and Fair Division," International Economic Review, Department of Economics, University of Pennsylvania and Osaka University Institute of Social and Economic Research Association, vol. 10(3), pages 337-362, October.
- Yinlian Zeng & Lianmin Zhang & Xiaoqiang Cai & Jun Li, 2018. "Cost Sharing for Capacity Transfer in Cooperating Queueing Systems," Production and Operations Management, Production and Operations Management Society, vol. 27(4), pages 644-662, April.
- Dov Samet & Eitan Zemel, 1984.
"On the Core and Dual Set of Linear Programming Games,"
Mathematics of Operations Research, INFORMS, vol. 9(2), pages 309-316, May.
- Dov Samet & Eitan Zemel, 1981. "On the Core and Dual Set of Linear Programming Games," Discussion Papers 485, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
- Lloyd S. Shapley, 1967. "On balanced sets and cores," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 14(4), pages 453-460.
- Aristide Mingozzi & Vittorio Maniezzo & Salvatore Ricciardelli & Lucio Bianco, 1998. "An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation," Management Science, INFORMS, vol. 44(5), pages 714-729, May.
- Vicente Valls & Francisco Ballestín & Sacramento Quintanilla, 2004. "A Population-Based Approach to the Resource-Constrained Project Scheduling Problem," Annals of Operations Research, Springer, vol. 131(1), pages 305-324, October.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Ichiro Nishizaki & Tomohiro Hayashida & Yuki Shintomi, 2016. "A core-allocation for a network restricted linear production game," Annals of Operations Research, Springer, vol. 238(1), pages 389-410, March.
- Javier Castro & Daniel Gómez & Juan Tejada, 2014. "Allocating slacks in stochastic PERT network," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 22(1), pages 37-52, March.
- De Reyck, Bert & Herroelen, willy, 1998. "A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations," European Journal of Operational Research, Elsevier, vol. 111(1), pages 152-174, November.
- Pilar Tormos & Antonio Lova, 2001. "A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling," Annals of Operations Research, Springer, vol. 102(1), pages 65-81, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Weglarz, Jan & Józefowska, Joanna & Mika, Marek & Waligóra, Grzegorz, 2011. "Project scheduling with finite or infinite number of activity processing modes - A survey," European Journal of Operational Research, Elsevier, vol. 208(3), pages 177-205, February.
- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Dieter Debels & Mario Vanhoucke, 2007. "A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem," Operations Research, INFORMS, vol. 55(3), pages 457-469, June.
- Moumene, Khaled & Ferland, Jacques A., 2009. "Activity list representation for a generalization of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 199(1), pages 46-54, November.
- Chen, Jiaqiong & Askin, Ronald G., 2009. "Project selection, scheduling and resource allocation with time dependent returns," European Journal of Operational Research, Elsevier, vol. 193(1), pages 23-34, February.
- Debels, Dieter & De Reyck, Bert & Leus, Roel & Vanhoucke, Mario, 2006.
"A hybrid scatter search/electromagnetism meta-heuristic for project scheduling,"
European Journal of Operational Research, Elsevier, vol. 169(2), pages 638-653, March.
- Dieter Debels & Bert de Reyck & Roel Leus & Mario Vanhoucke, 2003. "A hybrid scatter search / electromagnetism meta-heuristic for project scheduling," Vlerick Leuven Gent Management School Working Paper Series 2003-25, Vlerick Leuven Gent Management School.
- D. Debels & B. De Reyck & R. Leus & M. Vanhoucke, 2004. "A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 04/237, Ghent University, Faculty of Economics and Business Administration.
- Valls, Vicente & Ballestin, Francisco & Quintanilla, Sacramento, 2005. "Justification and RCPSP: A technique that pays," European Journal of Operational Research, Elsevier, vol. 165(2), pages 375-386, September.
- Alexander Tesch, 2020. "A polyhedral study of event-based models for the resource-constrained project scheduling problem," Journal of Scheduling, Springer, vol. 23(2), pages 233-251, April.
- Kolisch, Rainer & Hartmann, Sonke, 2006. "Experimental investigation of heuristics for resource-constrained project scheduling: An update," European Journal of Operational Research, Elsevier, vol. 174(1), pages 23-37, October.
- D. Debels & M. Vanhoucke, 2005. "A Decomposition-Based Heuristic For The Resource-Constrained Project Scheduling Problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/293, Ghent University, Faculty of Economics and Business Administration.
- Bernardo F. Almeida & Isabel Correia & Francisco Saldanha-da-Gama, 2018. "A biased random-key genetic algorithm for the project scheduling problem with flexible resources," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 26(2), pages 283-308, July.
- Hartmann, Sönke, 2011. "Project scheduling with resource capacities and requests varying with time," Working Paper Series 01/2011, Hamburg School of Business Administration (HSBA).
- Amadeu A. Coco & Christophe Duhamel & Andréa Cynthia Santos, 2020. "Modeling and solving the multi-period disruptions scheduling problem on urban networks," Annals of Operations Research, Springer, vol. 285(1), pages 427-443, February.
- Rolf H. Möhring & Andreas S. Schulz & Frederik Stork & Marc Uetz, 2003. "Solving Project Scheduling Problems by Minimum Cut Computations," Management Science, INFORMS, vol. 49(3), pages 330-350, March.
- Luis F. Machado-Domínguez & Carlos D. Paternina-Arboleda & Jorge I. Vélez & Agustin Barrios-Sarmiento, 2021. "A memetic algorithm to address the multi-node resource-constrained project scheduling problem," Journal of Scheduling, Springer, vol. 24(4), pages 413-429, August.
- Yang-Kuei Lin & Chin Soon Chong, 2017. "Fast GA-based project scheduling for computing resources allocation in a cloud manufacturing system," Journal of Intelligent Manufacturing, Springer, vol. 28(5), pages 1189-1201, June.
- Moehring, Rolf & Uetz, Marc & Stork, Frederik & Schulz, Andreas S., 2002. "Solving Project Scheduling Problems by Minimum Cut," Working papers 4231-02, Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Luise-Sophie Hoffmann & Carolin Kellenbrink & Stefan Helber, 2020. "Simultaneous structuring and scheduling of multiple projects with flexible project structures," Journal of Business Economics, Springer, vol. 90(5), pages 679-711, June.
- Raphael Kramer & Mauro Dell’Amico & Manuel Iori, 2017. "A batching-move iterated local search algorithm for the bin packing problem with generalized precedence constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 55(21), pages 6288-6304, November.
- Peteghem, Vincent Van & Vanhoucke, Mario, 2010. "A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 201(2), pages 409-418, March.
More about this item
Keywords
Project management; Resource reallocation; Cooperative games; Revenue sharing; The core; The Shapley value; Separable revenue;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:301:y:2021:i:1:d:10.1007_s10479-020-03753-y. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.