Optimal replacement policy for a repairable system with deterioration based on a renewal-geometric process
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-016-2133-4
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Yu-Hung Chien & Chin-Chih Chang & Shey-Huei Sheu, 2010. "Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy," Annals of Operations Research, Springer, vol. 181(1), pages 723-744, December.
- Ruey Yeh & Wen Chang & Hui-Chiung Lo, 2010. "Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method," Annals of Operations Research, Springer, vol. 181(1), pages 171-183, December.
- Richard Barlow & Larry Hunter, 1960. "Optimum Preventive Maintenance Policies," Operations Research, INFORMS, vol. 8(1), pages 90-100, February.
- Reza Ahmadi, 2014. "Optimal maintenance scheduling for a complex manufacturing system subject to deterioration," Annals of Operations Research, Springer, vol. 217(1), pages 1-29, June.
- Tang, Ya-yong & Lam, Yeh, 2006. "A [delta]-shock maintenance model for a deteriorating system," European Journal of Operational Research, Elsevier, vol. 168(2), pages 541-556, January.
- Shey-Huei Sheu & Chin-Chih Chang & Yu-Hung Chien, 2011. "Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks," Annals of Operations Research, Springer, vol. 186(1), pages 317-329, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Nooshin Salari & Viliam Makis, 2020. "Joint maintenance and just-in-time spare parts provisioning policy for a multi-unit production system," Annals of Operations Research, Springer, vol. 287(1), pages 351-377, April.
- Caiyun Niu & Jiang Jiang & Bingfeng Ge & Yingwu Chen, 2022. "Preventive maintenance model based on the renewal-geometric process," Journal of Risk and Reliability, , vol. 236(2), pages 348-356, April.
- Yonit Barron, 2018. "Group maintenance policies for an R-out-of-N system with phase-type distribution," Annals of Operations Research, Springer, vol. 261(1), pages 79-105, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yonit Barron, 2018. "Group maintenance policies for an R-out-of-N system with phase-type distribution," Annals of Operations Research, Springer, vol. 261(1), pages 79-105, February.
- Reza Ahmadi, 2014. "Optimal maintenance scheduling for a complex manufacturing system subject to deterioration," Annals of Operations Research, Springer, vol. 217(1), pages 1-29, June.
- Nooshin Salari & Viliam Makis, 2020. "Joint maintenance and just-in-time spare parts provisioning policy for a multi-unit production system," Annals of Operations Research, Springer, vol. 287(1), pages 351-377, April.
- Zhao, Xufeng & Qian, Cunhua & Nakagawa, Toshio, 2013. "Optimal policies for cumulative damage models with maintenance last and first," Reliability Engineering and System Safety, Elsevier, vol. 110(C), pages 50-59.
- Xufeng Zhao & Toshio Nakagawa, 2016. "Over-time and over-level replacement policies with random working cycles," Annals of Operations Research, Springer, vol. 244(1), pages 103-116, September.
- Phan, Dzung T. & Zhu, Yada, 2015. "Multi-stage optimization for periodic inspection planning of geo-distributed infrastructure systems," European Journal of Operational Research, Elsevier, vol. 245(3), pages 797-804.
- Chien, Yu-Hung & Sheu, Shey-Huei & Zhang, Zhe George, 2012. "Optimal maintenance policy for a system subject to damage in a discrete time process," Reliability Engineering and System Safety, Elsevier, vol. 103(C), pages 1-10.
- Reza Ahmadi, 2024. "Reliability and maintenance modeling for a production system by means of point process observations," Annals of Operations Research, Springer, vol. 340(1), pages 3-26, September.
- Finkelstein, Maxim & Cha, Ji Hwan & Langston, Amy, 2023. "Improving classical optimal age-replacement policies for degrading items," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
- Chattopadhyay, Gopinath & Rahman, Anisur, 2008. "Development of lifetime warranty policies and models for estimating costs," Reliability Engineering and System Safety, Elsevier, vol. 93(4), pages 522-529.
- Junyuan Wang & Jimin Ye & Qianru Ma & Pengfei Xie, 2022. "An extended geometric process repairable model with its repairman having vacation," Annals of Operations Research, Springer, vol. 311(1), pages 401-415, April.
- Sheu, Shey-Huei, 1998. "A generalized age and block replacement of a system subject to shocks," European Journal of Operational Research, Elsevier, vol. 108(2), pages 345-362, July.
- Ji Hwan Cha & Maxim Finkelstein, 2020. "On optimal life extension for degrading systems," Journal of Risk and Reliability, , vol. 234(3), pages 487-495, June.
- Lin Wang & Zhiqiang Lu & Yifei Ren, 2019. "A rolling horizon approach for production planning and condition-based maintenance under uncertain demand," Journal of Risk and Reliability, , vol. 233(6), pages 1014-1028, December.
- Navarro, Jorge & Arriaza, Antonio & Suárez-Llorens, Alfonso, 2019. "Minimal repair of failed components in coherent systems," European Journal of Operational Research, Elsevier, vol. 279(3), pages 951-964.
- Amini, Morteza & Balakrishnan, N., 2013. "Nonparametric meta-analysis of independent samples of records," Computational Statistics & Data Analysis, Elsevier, vol. 66(C), pages 70-81.
- Hoskins, R. P. & Brint, A. T. & Strbac, G., 1999. "A structured approach to Asset Management within the electricity industry," Utilities Policy, Elsevier, vol. 7(4), pages 221-232, February.
- Ji Hwan Cha & Maxim Finkelstein, 2020. "Is perfect repair always perfect?," TEST: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 29(1), pages 90-104, March.
- Belyi, Dmitriy & Popova, Elmira & Morton, David P. & Damien, Paul, 2017. "Bayesian failure-rate modeling and preventive maintenance optimization," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1085-1093.
More about this item
Keywords
Renewal-geometric process; Delay circuit; Replacement policy; Cost rate;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:244:y:2016:i:1:d:10.1007_s10479-016-2133-4. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.