IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v181y2010i1p1-1910.1007-s10479-009-0662-9.html
   My bibliography  Save this article

IPA derivatives for a discrete model of make-to-stock production-inventory systems with backorders

Author

Listed:
  • Benjamin Melamed
  • Yihong Fan
  • Yao Zhao
  • Yorai Wardi

Abstract

We consider a class of single-stage, single-product Make-to-Stock production-inventory system (MTS system) with backorders. The system employs a continuous-review base-stock policy which strives to maintain a prescribed base-stock level of inventory. In a previous paper of Zhao and Melamed (Methodology and Computing in Applied Probability 8:191–222, 2006 ), the Infinitesimal Perturbation Analysis (IPA) derivatives of inventory and backorders time averages with respect to the base-stock level and a parameter of the production-rate process were computed in Stochastic Fluid Model (SFM) setting, where the demand stream at the inventory facility and its replenishment stream from the production facility are modeled by stochastic rate processes. The advantage of the SFM abstraction is that the aforementioned IPA derivatives can be shown to be unbiased. However, its disadvantages are twofold: (1) on the modeling side, the highly abstracted SFM formulation does not maintain the identity of transactions (individual demands, orders and replenishments) and has no notion of lead times, and (2) on the applications side, the aforementioned IPA derivatives are brittle in that they contain instantaneous rates at certain hitting times which are rarely known, and consequently, need to be estimated. In this paper, we remedy both disadvantages by using a discrete setting, where transaction identity is maintained, and order fulfillment from inventory following demand arrivals and inventory restocking following replenishment arrivals are modeled as discrete jumps in the inventory level. We then compute the aforementioned IPA derivatives with respect to the base-stock level and a parameter of the lead-time process in the discrete setting under any initial system state. The formulas derived are shown to be unbiased and directly computable from sample path observables, and their computation is both simple and computationally robust. Copyright Springer Science+Business Media, LLC 2010

Suggested Citation

  • Benjamin Melamed & Yihong Fan & Yao Zhao & Yorai Wardi, 2010. "IPA derivatives for a discrete model of make-to-stock production-inventory systems with backorders," Annals of Operations Research, Springer, vol. 181(1), pages 1-19, December.
  • Handle: RePEc:spr:annopr:v:181:y:2010:i:1:p:1-19:10.1007/s10479-009-0662-9
    DOI: 10.1007/s10479-009-0662-9
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s10479-009-0662-9
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s10479-009-0662-9?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ioannis Paschalidis & Yong Liu & Christos Cassandras & Christos Panayiotou, 2004. "Inventory Control for Supply Chains with Service Level Constraints: A Synergy between Large Deviations and Perturbation Analysis," Annals of Operations Research, Springer, vol. 126(1), pages 231-258, February.
    2. Y. Wardi & B. Melamed & C.G. Cassandras & C.G. Panayiòtou, 2002. "Online IPA Gradient Estimators in Stochastic Continuous Fluid Models," Journal of Optimization Theory and Applications, Springer, vol. 115(2), pages 369-405, November.
    3. Philip Heidelberger & Xi-Ren Cao & Michael A. Zazanis & Rajan Suri, 1988. "Convergence Properties of Infinitesimal Perturbation Analysis Estimates," Management Science, INFORMS, vol. 34(11), pages 1281-1302, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yao Zhao & Benjamin Melamed, 2006. "IPA Derivatives for Make-to-Stock Production-Inventory Systems with Backorders," Methodology and Computing in Applied Probability, Springer, vol. 8(2), pages 191-222, June.
    2. Yihong Fan & Benjamin Melamed & Yao Zhao & Yorai Wardi, 2009. "IPA Derivatives for Make-to-Stock Production-Inventory Systems With Backorders Under the (R,r) Policy," Methodology and Computing in Applied Probability, Springer, vol. 11(2), pages 159-179, June.
    3. Souheil Ayed & Zied Hajej & Sadok Turki & Nidhal Rezg, 2017. "FPA method for optimal production planning under availability/degradation machine and subcontracting constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2135-2148, April.
    4. Miguel A. Lejeune & Andrzej Ruszczyński, 2007. "An Efficient Trajectory Method for Probabilistic Production-Inventory-Distribution Problems," Operations Research, INFORMS, vol. 55(2), pages 378-394, April.
    5. (Yale) Gong, Yeming & Yücesan, Enver, 2012. "Stochastic optimization for transshipment problems with positive replenishment lead times," International Journal of Production Economics, Elsevier, vol. 135(1), pages 61-72.
    6. Cao, Xi-Ren, 1996. "Perturbation analysis of discrete event systems: Concepts, algorithms, and applications," European Journal of Operational Research, Elsevier, vol. 91(1), pages 1-13, May.
    7. Bernd Heidergott & Taoying Farenhorst-Yuan, 2010. "Gradient Estimation for Multicomponent Maintenance Systems with Age-Replacement Policy," Operations Research, INFORMS, vol. 58(3), pages 706-718, June.
    8. Seong-Cheol Kang & Theodora Brisimi & Ioannis Paschalidis, 2015. "Distribution-dependent robust linear optimization with applications to inventory control," Annals of Operations Research, Springer, vol. 231(1), pages 229-263, August.
    9. Raghu Pasupathy, 2010. "On Choosing Parameters in Retrospective-Approximation Algorithms for Stochastic Root Finding and Simulation Optimization," Operations Research, INFORMS, vol. 58(4-part-1), pages 889-901, August.
    10. Koltai, Tamas & Lozano, Sebastian, 1998. "Sensitivity calculation of the throughput of an FMS with respect to the routing mix using perturbation analysis," European Journal of Operational Research, Elsevier, vol. 105(3), pages 483-493, March.
    11. Xia, Li & Cao, Xi-Ren, 2012. "Performance optimization of queueing systems with perturbation realization," European Journal of Operational Research, Elsevier, vol. 218(2), pages 293-304.
    12. Mourani, Iyad & Hennequin, Sophie & Xie, Xiaolan, 2008. "Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay," International Journal of Production Economics, Elsevier, vol. 112(1), pages 26-36, March.
    13. Barry L. Nelson, 2004. "50th Anniversary Article: Stochastic Simulation Research in Management Science," Management Science, INFORMS, vol. 50(7), pages 855-868, July.
    14. Lejeune, Miguel A., 2013. "Probabilistic modeling of multiperiod service levels," European Journal of Operational Research, Elsevier, vol. 230(2), pages 299-312.
    15. Erwan Koch & Christian Y. Robert, 2018. "Stochastic derivative estimation for max-stable random fields," Papers 1812.05893, arXiv.org, revised Nov 2020.
    16. Xiangling Hu & Charles Munson & Stergios Fotopoulos, 2012. "Purchasing decisions under stochastic prices: Approximate solutions for order time, order quantity and supplier selection," Annals of Operations Research, Springer, vol. 201(1), pages 287-305, December.
    17. Marvin K. Nakayama & Perwez Shahabuddin, 1998. "Likelihood Ratio Derivative Estimation for Finite-Time Performance Measures in Generalized Semi-Markov Processes," Management Science, INFORMS, vol. 44(10), pages 1426-1441, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:181:y:2010:i:1:p:1-19:10.1007/s10479-009-0662-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.