Multiple orders per job batch scheduling with incompatible jobs
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-007-0286-x
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Gregory Dobson & Ramakrishnan S. Nambimadom, 2001. "The Batch Loading and Scheduling Problem," Operations Research, INFORMS, vol. 49(1), pages 52-65, February.
- Javad H. Ahmadi & Reza H. Ahmadi & Sriram Dasu & Christopher S. Tang, 1992. "Batching and Scheduling Jobs on Batch and Discrete Processors," Operations Research, INFORMS, vol. 40(4), pages 750-763, August.
- Ari P. J. Vepsalainen & Thomas E. Morton, 1987. "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, INFORMS, vol. 33(8), pages 1035-1047, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
- Oleh Sobeyko & Lars Mönch, 2015. "Grouping genetic algorithms for solving single machine multiple orders per job scheduling problems," Annals of Operations Research, Springer, vol. 235(1), pages 709-739, December.
- Mason, Scott J. & Chen, Jen-Shiang, 2010. "Scheduling multiple orders per job in a single machine to minimize total completion time," European Journal of Operational Research, Elsevier, vol. 207(1), pages 70-77, November.
- Eduardo Queiroga & Rian G. S. Pinheiro & Quentin Christ & Anand Subramanian & Artur A. Pessoa, 2021. "Iterated local search for single machine total weighted tardiness batch scheduling," Journal of Heuristics, Springer, vol. 27(3), pages 353-438, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
- Koh, Shie-Gheun & Koo, Pyung-Hoi & Kim, Dong-Chun & Hur, Won-Suk, 2005. "Scheduling a single batch processing machine with arbitrary job sizes and incompatible job families," International Journal of Production Economics, Elsevier, vol. 98(1), pages 81-96, October.
- Laub, Jeffrey D. & Fowler, John W. & Keha, Ahmet B., 2007. "Minimizing makespan with multiple-orders-per-job in a two-machine flowshop," European Journal of Operational Research, Elsevier, vol. 182(1), pages 63-79, October.
- Thomas Schmitt & Bruce Faaland, 2004. "Scheduling recurrent construction," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(8), pages 1102-1128, December.
- Alidaee, Bahram & Kochenberger, Gary A. & Amini, Mohammad M., 2001. "Greedy solutions of selection and ordering problems," European Journal of Operational Research, Elsevier, vol. 134(1), pages 203-215, October.
- S-W Lin & K-C Ying, 2008. "A hybrid approach for single-machine tardiness problems with sequence-dependent setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1109-1119, August.
- Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
- Christoph Hertrich & Christian Weiß & Heiner Ackermann & Sandy Heydrich & Sven O. Krumke, 2022. "Online algorithms to schedule a proportionate flexible flow shop of batching machines," Journal of Scheduling, Springer, vol. 25(6), pages 643-657, December.
- Maria Anna Huka & Christian Rindler & Manfred Gronalt, 2021. "Scheduling and loading problem for multiple, identical dry kilns," Flexible Services and Manufacturing Journal, Springer, vol. 33(2), pages 312-336, June.
- Ruyan Fu & Ji Tian & Shisheng Li & Jinjiang Yuan, 2017. "An optimal online algorithm for the parallel-batch scheduling with job processing time compatibilities," Journal of Combinatorial Optimization, Springer, vol. 34(4), pages 1187-1197, November.
- Valente, Jorge M.S., 2007. "Improving the performance of the ATC dispatch rule by using workload data to determine the lookahead parameter value," International Journal of Production Economics, Elsevier, vol. 106(2), pages 563-573, April.
- Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
- Donghun Lee & Hyeongwon Kang & Dongjin Lee & Jeonwoo Lee & Kwanho Kim, 2023. "Deep Reinforcement Learning-Based Scheduler on Parallel Dedicated Machine Scheduling Problem towards Minimizing Total Tardiness," Sustainability, MDPI, vol. 15(4), pages 1-14, February.
- Raúl Mencía & Carlos Mencía, 2021. "One-Machine Scheduling with Time-Dependent Capacity via Efficient Memetic Algorithms," Mathematics, MDPI, vol. 9(23), pages 1-24, November.
- Alessandro Druetto & Erica Pastore & Elena Rener, 2023. "Parallel batching with multi-size jobs and incompatible job families," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(2), pages 440-458, July.
- Gregory Dobson & Ramakrishnan S. Nambimadom, 2001. "The Batch Loading and Scheduling Problem," Operations Research, INFORMS, vol. 49(1), pages 52-65, February.
- Alidaee, Bahram & Gopalan, Suresh, 1997. "A note on the equivalence of two heuristics to minimize total tardiness," European Journal of Operational Research, Elsevier, vol. 96(3), pages 514-517, February.
- Michael Pinedo & Marcos Singer, 1999. "A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 1-17, February.
- Payman Jula & Robert C. Leachman, 2010. "Coordinated Multistage Scheduling of Parallel Batch-Processing Machines Under Multiresource Constraints," Operations Research, INFORMS, vol. 58(4-part-1), pages 933-947, August.
- A H Kashan & B Karimi, 2008. "Scheduling a single batch-processing machine with arbitrary job sizes and incompatible job families: An ant colony framework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1269-1280, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:159:y:2008:i:1:p:245-260:10.1007/s10479-007-0286-x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.