A series—parallel redundant reliability system for cellular manufacturing design
Author
Abstract
Suggested Citation
DOI: 10.1243/1748006XJRR212
Download full text from publisher
References listed on IDEAS
- Logendran, Rasaratnam & Talkington, Diane, 1997. "Analysis of cellular and functional manufacturing systems in the presence of machine breakdown," International Journal of Production Economics, Elsevier, vol. 53(3), pages 239-256, December.
- Safaei, N. & Saidi-Mehrabad, M. & Jabal-Ameli, M.S., 2008. "A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system," European Journal of Operational Research, Elsevier, vol. 185(2), pages 563-592, March.
- Diallo, Mohamadou & Pierreval, Henri & Quilliot, Alain, 2001. "Manufacturing cells design with flexible routing capability in presence of unreliable machines," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 175-182, December.
- Kuhn, Heinrich, 1997. "A dynamic lot sizing model with exponential machine breakdowns," European Journal of Operational Research, Elsevier, vol. 100(3), pages 514-536, August.
- Kacem, Imed & Chu, Chengbin, 2008. "Efficient branch-and-bound algorithm for minimizing the weighted sum of completion times on a single machine with one availability constraint," International Journal of Production Economics, Elsevier, vol. 112(1), pages 138-150, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Weckenborg, Christian & Schumacher, Patrick & Thies, Christian & Spengler, Thomas S., 2024. "Flexibility in manufacturing system design: A review of recent approaches from Operations Research," European Journal of Operational Research, Elsevier, vol. 315(2), pages 413-441.
- Das, K. & Lashkari, R.S. & Sengupta, S., 2007. "Reliability consideration in the design and analysis of cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 105(1), pages 243-262, January.
- Kuldeep Lamba & Ravi Kumar & Shraddha Mishra & Shubhangini Rajput, 2020. "Sustainable dynamic cellular facility layout: a solution approach using simulated annealing-based meta-heuristic," Annals of Operations Research, Springer, vol. 290(1), pages 5-26, July.
- Ting Qu & Matthias Thürer & Junhao Wang & Zongzhong Wang & Huan Fu & Congdong Li & George Q. Huang, 2017. "System dynamics analysis for an Internet-of-Things-enabled production logistics system," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2622-2649, May.
- Fatemeh Sabouhi & Ali Bozorgi-Amiri & Mohammad Moshref-Javadi & Mehdi Heydari, 2019. "An integrated routing and scheduling model for evacuation and commodity distribution in large-scale disaster relief operations: a case study," Annals of Operations Research, Springer, vol. 283(1), pages 643-677, December.
- Kellerer, Hans & Kubzin, Mikhail A. & Strusevich, Vitaly A., 2009. "Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval," European Journal of Operational Research, Elsevier, vol. 199(1), pages 111-116, November.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
- Iqbal, Asif & Al-Ghamdi, Khalid A., 2018. "Energy-efficient cellular manufacturing system: Eco-friendly revamping of machine shop configuration," Energy, Elsevier, vol. 163(C), pages 863-872.
- Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
- Aidin Delgoshaei & Mohd Khairol Anuar Ariffin & Ahad Ali, 2017. "A multi-period scheduling method for trading-off between skilled-workers allocation and outsource service usage in dynamic CMS," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 997-1039, February.
- Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
- Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
- Kerem Bülbül & Safia Kedad-Sidhoum & Halil Şen, 2019. "Single-machine common due date total earliness/tardiness scheduling with machine unavailability," Journal of Scheduling, Springer, vol. 22(5), pages 543-565, October.
- Chung-Ho Su & Jen-Ya Wang, 2022. "A Branch-and-Bound Algorithm for Minimizing the Total Tardiness of Multiple Developers," Mathematics, MDPI, vol. 10(7), pages 1-24, April.
- Taş, Duygu & Gendreau, Michel & Jabali, Ola & Jans, Raf, 2019. "A capacitated lot sizing problem with stochastic setup times and overtime," European Journal of Operational Research, Elsevier, vol. 273(1), pages 146-159.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Safaei, Nima & Tavakkoli-Moghaddam, Reza, 2009. "Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 301-314, August.
- Tsarouhas, Panagiotis H., 2009. "Classification and calculation of primary failure modes in bread production line," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 551-557.
More about this item
Keywords
cellular manufacturing system; series—parallel redundant reliability system; reliable route;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:risrel:v:223:y:2009:i:3:p:233-250. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.