IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v60y2009i3d10.1057_palgrave.jors.2602568.html
   My bibliography  Save this article

A branch and bound algorithm for disassembly scheduling with assembly product structure

Author

Listed:
  • H-J Kim

    (Graduate School of Logistics, Inha University)

  • D-H Lee

    (Hanyang University)

  • P Xirouchakis

    (Swiss Federal Institute of Technology (EPFL))

  • O K Kwon

    (Graduate School of Logistics, Inha University)

Abstract

This paper considers a production planning problem in disassembly systems, which is the problem of determining the quantity and timing of disassembling end-of-use/life products in order to satisfy the demand of their parts or components over a planning horizon. The case of single product type without parts commonality is considered for the objective of minimizing the sum of setup and inventory holding costs. To show the complexity of the problem, we prove that the problem is NP-hard. Then, after deriving the properties of optimal solutions, a branch and bound algorithm is suggested that incorporates the Lagrangean relaxation-based upper and lower bounds. Computational experiments are performed on a number of randomly generated problems and the test results indicate that the branch and bound algorithm can give optimal solutions up to moderate-sized problems in a reasonable computation time. A Lagrangean heuristic for a viable alternative for large-sized problems is also suggested and compared with the existing heuristics to show its effectiveness.

Suggested Citation

  • H-J Kim & D-H Lee & P Xirouchakis & O K Kwon, 2009. "A branch and bound algorithm for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 419-430, March.
  • Handle: RePEc:pal:jorsoc:v:60:y:2009:i:3:d:10.1057_palgrave.jors.2602568
    DOI: 10.1057/palgrave.jors.2602568
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602568
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602568?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. D-H Lee & P Xirouchakis, 2004. "A two-stage heuristic for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 287-297, March.
    2. Marshall L. Fisher, 1981. "The Lagrangian Relaxation Method for Solving Integer Programming Problems," Management Science, INFORMS, vol. 27(1), pages 1-18, January.
    3. Wallace B. Crowston & Michael H. Wagner, 1973. "Dynamic Lot Size Models for Multi-Stage Assembly Systems," Management Science, INFORMS, vol. 20(1), pages 14-21, September.
    4. Kongar, Elif & Gupta, Surendra M., 2006. "Disassembly to order system under uncertainty," Omega, Elsevier, vol. 34(6), pages 550-561, December.
    5. H-J Kim & D-H Lee & P Xirouchakis, 2006. "A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(10), pages 1231-1240, October.
    6. Albert Wagelmans & Stan van Hoesel & Antoon Kolen, 1992. "Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case," Operations Research, INFORMS, vol. 40(1-supplem), pages 145-156, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    2. Abdeljaouad, Mohamed Amine & Bahroun, Zied & Omrane, Anissa & Fondrevelle, Julien, 2015. "Job-shop production scheduling with reverse flows," European Journal of Operational Research, Elsevier, vol. 244(1), pages 117-128.
    3. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
    4. Godichaud, Matthieu & Amodeo, Lionel, 2018. "Economic order quantity for multistage disassembly systems," International Journal of Production Economics, Elsevier, vol. 199(C), pages 16-25.
    5. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
    6. Lu, Liang & Qi, Xiangtong & Liu, Zhixin, 2014. "On the cooperation of recycling operations," European Journal of Operational Research, Elsevier, vol. 233(2), pages 349-358.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yaping Ren & Xinyu Lu & Hongfei Guo & Zhaokang Xie & Haoyang Zhang & Chaoyong Zhang, 2023. "A Review of Combinatorial Optimization Problems in Reverse Logistics and Remanufacturing for End-of-Life Products," Mathematics, MDPI, vol. 11(2), pages 1-24, January.
    2. Tian, Xiaoyu & Zhang, Zhi-Hai, 2019. "Capacitated disassembly scheduling and pricing of returned products with price-dependent yield," Omega, Elsevier, vol. 84(C), pages 160-174.
    3. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
    4. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    5. Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
    6. H-J Kim & D-H Lee & P Xirouchakis, 2006. "A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(10), pages 1231-1240, October.
    7. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
    8. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
    9. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    10. Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
    11. M Diaby & A L Nsakanda, 2006. "Large-scale capacitated part-routing in the presence of process and routing flexibilities and setup costs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(9), pages 1100-1112, September.
    12. Ogbe, Emmanuel & Li, Xiang, 2017. "A new cross decomposition method for stochastic mixed-integer linear programming," European Journal of Operational Research, Elsevier, vol. 256(2), pages 487-499.
    13. Mutsunori Yagiura & Toshihide Ibaraki & Fred Glover, 2004. "An Ejection Chain Approach for the Generalized Assignment Problem," INFORMS Journal on Computing, INFORMS, vol. 16(2), pages 133-151, May.
    14. S Bilgin & M Azizoǧlu, 2006. "Capacity and tool allocation problem in flexible manufacturing systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 670-681, June.
    15. Weijun Xie & Yanfeng Ouyang & Sze Chun Wong, 2016. "Reliable Location-Routing Design Under Probabilistic Facility Disruptions," Transportation Science, INFORMS, vol. 50(3), pages 1128-1138, August.
    16. Peter Francis & Karen Smilowitz & Michal Tzur, 2006. "The Period Vehicle Routing Problem with Service Choice," Transportation Science, INFORMS, vol. 40(4), pages 439-454, November.
    17. Park, Moon-Won & Kim, Yeong-Dae, 2000. "A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints," European Journal of Operational Research, Elsevier, vol. 123(3), pages 504-518, June.
    18. Shangyao Yan & Chun-Ying Chen & Chuan-Che Wu, 2012. "Solution methods for the taxi pooling problem," Transportation, Springer, vol. 39(3), pages 723-748, May.
    19. Jenny Carolina Saldana Cortés, 2011. "Programación semidefinida aplicada a problemas de cantidad económica de pedido," Documentos CEDE 8735, Universidad de los Andes, Facultad de Economía, CEDE.
    20. van den Heuvel, Wilco & Gutiérrez, José Miguel & Hwang, Hark-Chin, 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," European Journal of Operational Research, Elsevier, vol. 213(2), pages 455-457, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:60:y:2009:i:3:d:10.1057_palgrave.jors.2602568. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.