IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v199y2018icp16-25.html
   My bibliography  Save this article

Economic order quantity for multistage disassembly systems

Author

Listed:
  • Godichaud, Matthieu
  • Amodeo, Lionel

Abstract

Disassembly economic order quantity models are proposed in this paper in order to reduce inventory costs in reverse logistics. The problems is to determine the quantities and the timings of disassembly operations to generate components for which there are known, continuous and constant demands over a planning horizon. Disassembly operations generate unnecessary inventories when the demands are not the same for all components. The proposed models integrate disposal decisions to handle this inventory surplus. Three new models are developed to determine reorder intervals in disassembly systems according to fixed disassembly order costs and inventory costs. The first one is a single stage model (one product to disassemble with several requested components) with one reorder interval to determine. The other two are for multi-stage disassembly systems (one reorder interval to be determined for each stage) under nested policies and integer-ratio ratio policies.

Suggested Citation

  • Godichaud, Matthieu & Amodeo, Lionel, 2018. "Economic order quantity for multistage disassembly systems," International Journal of Production Economics, Elsevier, vol. 199(C), pages 16-25.
  • Handle: RePEc:eee:proeco:v:199:y:2018:i:c:p:16-25
    DOI: 10.1016/j.ijpe.2018.02.008
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318300975
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.02.008?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Leroy B. Schwarz, 1973. "A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem," Management Science, INFORMS, vol. 19(5), pages 555-566, January.
    2. Khouja, Moutaz & Goyal, Suresh, 2008. "A review of the joint replenishment problem literature: 1989-2005," European Journal of Operational Research, Elsevier, vol. 186(1), pages 1-16, April.
    3. Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
    4. Robin Roundy, 1985. "98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems," Management Science, INFORMS, vol. 31(11), pages 1416-1430, November.
    5. Gou, Qinglong & Liang, Liang & Huang, Zhimin & Xu, Chuanyong, 2008. "A joint inventory model for an open-loop reverse supply chain," International Journal of Production Economics, Elsevier, vol. 116(1), pages 28-42, November.
    6. H-J Kim & D-H Lee & P Xirouchakis, 2006. "A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(10), pages 1231-1240, October.
    7. Abdul-Jalbar, Beatriz & Gutiérrez, Jose M. & Sicilia, Joaquín, 2006. "Single cycle policies for the one-warehouse N-retailer inventory/distribution system," Omega, Elsevier, vol. 34(2), pages 196-208, April.
    8. Hsiao, Yu-Cheng, 2008. "Optimal single-cycle policies for the one-warehouse multi-retailer inventory/distribution system," International Journal of Production Economics, Elsevier, vol. 114(1), pages 219-229, July.
    9. Nilsson, Andreas & Segerstedt, Anders & van der Sluis, Erik, 2007. "A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 399-405, July.
    10. Abdul-Jalbar, B. & Gutierrez, J. & Sicilia, J., 2005. "Integer-ratio policies for distribution/inventory systems," International Journal of Production Economics, Elsevier, vol. 93(1), pages 407-415, January.
    11. S. K. Goyal, 1974. "Determination of Optimum Packaging Frequency of Items Jointly Replenished," Management Science, INFORMS, vol. 21(4), pages 436-443, December.
    12. Stephen C. Graves & Leroy B. Schwarz, 1977. "Single Cycle Continuous Review Policies for Arborescent Production/Inventory Systems," Management Science, INFORMS, vol. 23(5), pages 529-540, January.
    13. H-J Kim & D-H Lee & P Xirouchakis & O K Kwon, 2009. "A branch and bound algorithm for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 419-430, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liang, Wei & Zhang, Zeqiang & Yin, Tao & Zhang, Yu & Wu, Tengfei, 2023. "Modelling and optimisation of energy consumption and profit-oriented multi-parallel partial disassembly line balancing problem," International Journal of Production Economics, Elsevier, vol. 262(C).
    2. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hsiao, Yu-Cheng, 2008. "Optimal single-cycle policies for the one-warehouse multi-retailer inventory/distribution system," International Journal of Production Economics, Elsevier, vol. 114(1), pages 219-229, July.
    2. Abdul-Jalbar, Beatriz & Gutiérrez, José M. & Sicilia, Joaquín, 2009. "A two-echelon inventory/distribution system with power demand pattern and backorders," International Journal of Production Economics, Elsevier, vol. 122(2), pages 519-524, December.
    3. Carvajal, Jimmy & Castaño, Fabian & Sarache, William & Costa, Yasel, 2020. "Heuristic approaches for a two-echelon constrained joint replenishment and delivery problem," International Journal of Production Economics, Elsevier, vol. 220(C).
    4. Zhai, Xin & Ward, James E. & Schwarz, Leroy B., 2011. "Coordinating a one-warehouse N-retailer distribution system under retailer-reporting," International Journal of Production Economics, Elsevier, vol. 134(1), pages 204-211, November.
    5. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    6. Cui, Ligang & Deng, Jie & Liu, Rui & Xu, Dongyang & Zhang, Yajun & Xu, Maozeng, 2020. "A stochastic multi-item replenishment and delivery problem with lead-time reduction initiatives and the solving methodologies," Applied Mathematics and Computation, Elsevier, vol. 374(C).
    7. Lee, Dong Joo & Jeong, In-Jae, 2010. "A distributed coordination for a single warehouse-multiple retailer problem under private information," International Journal of Production Economics, Elsevier, vol. 125(1), pages 190-199, May.
    8. Abdul-Jalbar, Beatriz & Gutiérrez, Jose M. & Sicilia, Joaquín, 2006. "Single cycle policies for the one-warehouse N-retailer inventory/distribution system," Omega, Elsevier, vol. 34(2), pages 196-208, April.
    9. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    10. Wang, Lin & He, Jing & Wu, Desheng & Zeng, Yu-Rong, 2012. "A novel differential evolution algorithm for joint replenishment problem under interdependence and its application," International Journal of Production Economics, Elsevier, vol. 135(1), pages 190-198.
    11. Abdul-Jalbar, B. & Gutierrez, J. & Puerto, J. & Sicilia, J., 2003. "Policies for inventory/distribution systems: The effect of centralization vs. decentralization," International Journal of Production Economics, Elsevier, vol. 81(1), pages 281-293, January.
    12. Chu, Chi-Leung & Leon, V. Jorge, 2008. "Power-of-two single-warehouse multi-buyer inventory coordination with private information," International Journal of Production Economics, Elsevier, vol. 111(2), pages 562-574, February.
    13. Gautier Stauffer, 2018. "Approximation algorithms for k-echelon extensions of the one warehouse multi-retailer problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 88(3), pages 445-473, December.
    14. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
    15. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
    16. Jean-Philippe Gayon & Guillaume Massonnet & Christophe Rapine & Gautier Stauffer, 2017. "Fast Approximation Algorithms for the One-Warehouse Multi-Retailer Problem Under General Cost Structures and Capacity Constraints," Mathematics of Operations Research, INFORMS, vol. 42(3), pages 854-875, August.
    17. Ian R. Webb & Bruce R. Buzby & Gerard M. Campbell, 1997. "Cyclical schedules for the joint replenishment problem with dynamic demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 577-589, September.
    18. Wang, Qinan & Chay, Yiowmin & Wu, Zhang, 2011. "Streamlining inventory flows with time discounts to improve the profits of a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 132(2), pages 230-239, August.
    19. Abdul-Jalbar, B. & Gutierrez, J. & Sicilia, J., 2005. "Integer-ratio policies for distribution/inventory systems," International Journal of Production Economics, Elsevier, vol. 93(1), pages 407-415, January.
    20. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:199:y:2018:i:c:p:16-25. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.