IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v58y2007i6d10.1057_palgrave.jors.2602198.html
   My bibliography  Save this article

Forecasting both time varying MTBF of fighter aircraft module and expected demand of minor parts

Author

Listed:
  • K B Yoon

    (Yonsei University)

  • S Y Sohn

    (Yonsei University)

Abstract

A fundamental aspect of inventory management of fighter aircraft is to forecast the demand of minor parts installed in the main module. Most of the existing inventory models do not take into account the time-varying characteristics of modules composed of minor parts even though the demand rate of minor parts is sensitive to the conditions of module. In this paper, we propose random-effects regression models to forecast the mean time between failure (MTBF) of modules and the expected demand for the minor parts in the module based on time-varying characteristics of modules. Subsequently, we show how they can be applied to find necessary seasonal demand of minor parts. Our study is expected to contribute to ROKAF (Republic of Korea Air Force) in terms of providing base information for inventory policy for minor parts.

Suggested Citation

  • K B Yoon & S Y Sohn, 2007. "Forecasting both time varying MTBF of fighter aircraft module and expected demand of minor parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(6), pages 714-719, June.
  • Handle: RePEc:pal:jorsoc:v:58:y:2007:i:6:d:10.1057_palgrave.jors.2602198
    DOI: 10.1057/palgrave.jors.2602198
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602198
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602198?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Fujiwara, Okitsugu & Sedarage, Dayani, 1997. "An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times," European Journal of Operational Research, Elsevier, vol. 100(3), pages 550-556, August.
    2. Vaughan, Timothy S., 2005. "Failure replacement and preventive maintenance spare parts ordering policy," European Journal of Operational Research, Elsevier, vol. 161(1), pages 183-190, February.
    3. Hill, Roger M., 1997. "Applying Bayesian methodology with a uniform prior to the single period inventory model," European Journal of Operational Research, Elsevier, vol. 98(3), pages 555-562, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. S Y Sohn & Y Kim & B T Kim, 2009. "Cost of ownership model for spare engines purchase for the Korean navy acquisition program," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(12), pages 1674-1682, December.
    2. S Y Sohn & K B Yoon, 2010. "Dynamic preventive maintenance scheduling of the modules of fighter aircraft based on random effects regression model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 974-979, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mostard, Julien & Teunter, Ruud, 2006. "The newsboy problem with resalable returns: A single period model and case study," European Journal of Operational Research, Elsevier, vol. 169(1), pages 81-96, February.
    2. M. Ganesh Kumar & R. Uthayakumar, 2019. "A two-echelon integrated inventory model under generalized lead time distribution with variable backordering rate," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(4), pages 552-562, August.
    3. Ye, Yuan & Lu, Yonggang & Robinson, Powell & Narayanan, Arunachalam, 2022. "An empirical Bayes approach to incorporating demand intermittency and irregularity into inventory control," European Journal of Operational Research, Elsevier, vol. 303(1), pages 255-272.
    4. Halkos, George & Kevork, Ilias, 2012. "Validity and precision of estimates in the classical newsvendor model with exponential and rayleigh demand," MPRA Paper 36460, University Library of Munich, Germany.
    5. Phillip M. Yelland & Shinji Kim & Renée Stratulate, 2010. "A Bayesian Model for Sales Forecasting at Sun Microsystems," Interfaces, INFORMS, vol. 40(2), pages 118-129, April.
    6. Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
    7. Kevork, Ilias S., 2010. "Estimating the optimal order quantity and the maximum expected profit for single-period inventory decisions," Omega, Elsevier, vol. 38(3-4), pages 218-227, June.
    8. Zhu, Mixin & Zhou, Xiaojun, 2023. "Hierarchical-clustering-based joint optimization of spare part provision and maintenance scheduling for serial-parallel multi-station manufacturing systems," International Journal of Production Economics, Elsevier, vol. 264(C).
    9. Wang, Wenbin & Banjevic, Dragan, 2012. "Ergodicity of forward times of the renewal process in a block-based inspection model using the delay time concept," Reliability Engineering and System Safety, Elsevier, vol. 100(C), pages 1-7.
    10. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    11. Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
    12. Biyu He & Franklin Dexter & Alex Macario & Stefanos Zenios, 2012. "The Timing of Staffing Decisions in Hospital Operating Rooms: Incorporating Workload Heterogeneity into the Newsvendor Problem," Manufacturing & Service Operations Management, INFORMS, vol. 14(1), pages 99-114, January.
    13. Halkos, George & Kevork, Ilias, 2012. "Evaluating alternative frequentist inferential approaches for optimal order quantities in the newsvendor model under exponential demand," MPRA Paper 39650, University Library of Munich, Germany.
    14. Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
    15. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    16. Lee, Chih-Ming, 2008. "A Bayesian approach to determine the value of information in the newsboy problem," International Journal of Production Economics, Elsevier, vol. 112(1), pages 391-402, March.
    17. Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
    18. Zhu, Sha & van Jaarsveld, Willem & Dekker, Rommert, 2022. "Critical project planning and spare parts inventory management in shutdown maintenance," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    19. Sun, Mingyao & Ng, Chi To & Yang, Liu & Zhang, Tianhua, 2024. "Optimal after-sales service offering strategy: Additive manufacturing, traditional manufacturing, or hybrid?," International Journal of Production Economics, Elsevier, vol. 268(C).
    20. Gu, Jingyao & Zhang, Guoqing & Li, Kevin W., 2015. "Efficient aircraft spare parts inventory management under demand uncertainty," Journal of Air Transport Management, Elsevier, vol. 42(C), pages 101-109.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:58:y:2007:i:6:d:10.1057_palgrave.jors.2602198. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.