Dynamic preventive maintenance scheduling of the modules of fighter aircraft based on random effects regression model
Author
Abstract
Suggested Citation
DOI: 10.1057/jors.2008.167
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Gertsbakh, I. & Kordonsky, Kh. B., 1997. "Choice of the best time scale for preventive maintenance in heterogeneous environments," European Journal of Operational Research, Elsevier, vol. 98(1), pages 64-74, April.
- K B Yoon & S Y Sohn, 2007. "Forecasting both time varying MTBF of fighter aircraft module and expected demand of minor parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(6), pages 714-719, June.
- Grigoriev, Alexander & van de Klundert, Joris & Spieksma, Frits C.R., 2006.
"Modeling and solving the periodic maintenance problem,"
European Journal of Operational Research, Elsevier, vol. 172(3), pages 783-797, August.
- Grigoriev, A. & Pierard, G.E. & Storm, G, Chin P, Strijkers GJ., 2004. "Modeling and solving the periodic maintenance problem," Research Memorandum 027, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- K B Yoon & S Y Sohn, 2009. "Erratum: Forecasting both time varying MTBF of fighter aircraft module and expected demand of minor parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1292-1294, September.
- Sohn, So Young & Yoon, Kyung Bok & Chang, In Sang, 2006. "Random effects model for the reliability management of modules of a fighter aircraft," Reliability Engineering and System Safety, Elsevier, vol. 91(4), pages 433-437.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Khaled Alhamad & Yousuf Alkhezi, 2024. "Hybrid Genetic Algorithm and Tabu Search for Solving Preventive Maintenance Scheduling Problem for Cogeneration Plants," Mathematics, MDPI, vol. 12(12), pages 1-26, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- S Y Sohn & Y Kim & B T Kim, 2009. "Cost of ownership model for spare engines purchase for the Korean navy acquisition program," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(12), pages 1674-1682, December.
- Kuschel, Torben & Bock, Stefan, 2016. "The weighted uncapacitated planned maintenance problem: Complexity and polyhedral properties," European Journal of Operational Research, Elsevier, vol. 250(3), pages 773-781.
- Maquirriain, Javier & García-Villoria, Alberto & Pastor, Rafael, 2024. "Matheuristics for scheduling of maintenance service with linear operation cost and step function maintenance cost," European Journal of Operational Research, Elsevier, vol. 315(1), pages 73-87.
- Thomas Bittar & Pierre Carpentier & Jean-Philippe Chancelier & Jérôme Lonchampt, 2022. "A decomposition method by interaction prediction for the optimization of maintenance scheduling," Annals of Operations Research, Springer, vol. 316(1), pages 229-267, September.
- Fahimeh Shamsaei & Mathieu Vyve, 2017. "Solving integrated production and condition-based maintenance planning problems by MIP modeling," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 184-202, June.
- Michael Patriksson & Ann-Brith Strömberg & Adam Wojciechowski, 2015. "The stochastic opportunistic replacement problem, part II: a two-stage solution approach," Annals of Operations Research, Springer, vol. 224(1), pages 51-75, January.
- Robin P. Nicolai & Rommert Dekker, 2008.
"Optimal Maintenance of Multi-component Systems: A Review,"
Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 11, pages 263-286,
Springer.
- Nicolai, R.P. & Dekker, R., 2006. "Optimal maintenance of multi-component systems: a review," Econometric Institute Research Papers EI 2006-29, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
- Nikos P. Rachaniotis & Theodore G. Voutsinas & Costas P. Pappis, 2013. "Scheduling periodic preventive maintenance with a single server in a finite horizon," International Journal of Decision Sciences, Risk and Management, Inderscience Enterprises Ltd, vol. 5(1), pages 80-87.
- Freddy Hernández & Viviana Giampaoli, 2018. "The Impact of Misspecified Random Effect Distribution in a Weibull Regression Mixed Model," Stats, MDPI, vol. 1(1), pages 1-29, May.
- Kuschel, Torben & Bock, Stefan, 2019. "Solving the Weighted Capacitated Planned Maintenance Problem and its variants," European Journal of Operational Research, Elsevier, vol. 272(3), pages 847-858.
- Jiang, R. & Jardine, A.K.S., 2006. "Composite scale modeling in the presence of censored data," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 756-764.
- Jeon, Jeasu & Sohn, So Young, 2015. "Product failure pattern analysis from warranty data using association rule and Weibull regression analysis: A case study," Reliability Engineering and System Safety, Elsevier, vol. 133(C), pages 176-183.
- Asaf Levin & Gur Mosheiov & Assaf Sarig, 2009. "Scheduling a maintenance activity on parallel identical machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 33-41, February.
- Scott G. Frickenstein & Lyn R. Whitaker, 2003. "Age replacement policies in two time scales," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 592-613, September.
- Gizem Keysan & George L. Nemhauser & Martin W. P. Savelsbergh, 2010. "Tactical and Operational Planning of Scheduled Maintenance for Per-Seat, On-Demand Air Transportation," Transportation Science, INFORMS, vol. 44(3), pages 291-306, August.
- M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
- Phan, Dzung T. & Zhu, Yada, 2015. "Multi-stage optimization for periodic inspection planning of geo-distributed infrastructure systems," European Journal of Operational Research, Elsevier, vol. 245(3), pages 797-804.
- Joo, Seong-Jong, 2009. "Scheduling preventive maintenance for modular designed components: A dynamic approach," European Journal of Operational Research, Elsevier, vol. 192(2), pages 512-520, January.
- Fernández, Elena & Kalcsics, Jörg & Núñez-del-Toro, Cristina, 2017. "A branch-and-price algorithm for the Aperiodic Multi-Period Service Scheduling Problem," European Journal of Operational Research, Elsevier, vol. 263(3), pages 805-814.
More about this item
Keywords
dynamic preventive maintenance; fighter aircraft; random effects Weibull-inverse gamma regression model; MTBF; MTTR;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:61:y:2010:i:6:d:10.1057_jors.2008.167. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.