A modified Silver–Meal heuristic for dynamic lot sizing under incremental quantity discounts
Author
Abstract
Suggested Citation
DOI: 10.1057/palgrave.jors.2601679
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- J Hu & C L Munson, 2002. "Dynamic demand lot-sizing rules for incremental quantity discounts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(8), pages 855-863, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Mendoza, Abraham & Ventura, José A., 2008. "Incorporating quantity discounts to the EOQ model with transportation costs," International Journal of Production Economics, Elsevier, vol. 113(2), pages 754-765, June.
- Lee, Zu-Hsu & Deng, Shiming & Lin, Beixin & Yang, James G.S., 2010. "Decision model and analysis for investment interest expense deduction and allocation," European Journal of Operational Research, Elsevier, vol. 200(1), pages 268-280, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- J C Ho & Y-L Chang & A O Solis, 2006. "Two modifications of the least cost per period heuristic for dynamic lot-sizing," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(8), pages 1005-1013, August.
- Battini, Daria & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A sustainable EOQ model: Theoretical formulation and applications," International Journal of Production Economics, Elsevier, vol. 149(C), pages 145-153.
- Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
- Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
- Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
- Minjiao Zhang & Simge Küçükyavuz & Saumya Goel, 2014. "A Branch-and-Cut Method for Dynamic Decision Making Under Joint Chance Constraints," Management Science, INFORMS, vol. 60(5), pages 1317-1333, May.
- Liu, Tieming, 2008. "Economic lot sizing problem with inventory bounds," European Journal of Operational Research, Elsevier, vol. 185(1), pages 204-215, February.
- Lee, Jinkyu & Bae, Sanghyeon & Kim, Woo Chang & Lee, Yongjae, 2023. "Value function gradient learning for large-scale multistage stochastic programming problems," European Journal of Operational Research, Elsevier, vol. 308(1), pages 321-335.
- Kaijie Zhu & Ulrich W. Thonemann, 2009. "Coordination of pricing and inventory control across products," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 175-190, March.
- Chakrabarti, T. & Chaudhuri, K. S., 1997. "An EOQ model for deteriorating items with a linear trend in demand and shortages in all cycles," International Journal of Production Economics, Elsevier, vol. 49(3), pages 205-213, May.
- Rossi, Tommaso & Pozzi, Rossella & Testa, Mariapaola, 2017. "EOQ-based inventory management in single-machine multi-item systems," Omega, Elsevier, vol. 71(C), pages 106-113.
- Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
- Guerrero, W.J. & Prodhon, C. & Velasco, N. & Amaya, C.A., 2013. "Hybrid heuristic for the inventory location-routing problem with deterministic demand," International Journal of Production Economics, Elsevier, vol. 146(1), pages 359-370.
- Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
- Bouchery, Yann & Hezarkhani, Behzad & Stauffer, Gautier, 2022. "Coalition formation and cost sharing for truck platooning," Transportation Research Part B: Methodological, Elsevier, vol. 165(C), pages 15-34.
- Jenny Carolina Saldana Cortés, 2011. "Programación semidefinida aplicada a problemas de cantidad económica de pedido," Documentos CEDE 8735, Universidad de los Andes, Facultad de Economía, CEDE.
- Qiu, Ruozhen & Sun, Minghe & Lim, Yun Fong, 2017. "Optimizing (s, S) policies for multi-period inventory models with demand distribution uncertainty: Robust dynamic programing approaches," European Journal of Operational Research, Elsevier, vol. 261(3), pages 880-892.
- van den Heuvel, Wilco & Gutiérrez, José Miguel & Hwang, Hark-Chin, 2011.
"Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities","
European Journal of Operational Research, Elsevier, vol. 213(2), pages 455-457, September.
- van den Heuvel, W.J. & Gutierrez, J.M. & Hwang, H.C., 2010. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," Econometric Institute Research Papers EI 2010-70, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- van den Heuvel, W. & Gutierrez, J.M. & Hwang, H.C., 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," Econometric Institute Research Papers EI 2011-39, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Zhili Zhou & Yongpei Guan, 2013. "Two-stage stochastic lot-sizing problem under cost uncertainty," Annals of Operations Research, Springer, vol. 209(1), pages 207-230, October.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
More about this item
Keywords
inventory; quantity discounts; purchasing; material requirements planning; heuristics;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:55:y:2004:i:6:d:10.1057_palgrave.jors.2601679. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.