A Dynamic Lot-Sizing Model with Demand Time Windows
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.47.10.1384
Download full text from publisher
References listed on IDEAS
- Martin Desrochers & Jacques Desrosiers & Marius Solomon, 1992. "A New Optimization Algorithm for the Vehicle Routing Problem with Time Windows," Operations Research, INFORMS, vol. 40(2), pages 342-354, April.
- Hoesel C.P.M. van & Wagelmans A.P.M., 1997. "Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems," Research Memorandum 014, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Liman, Surya D. & Panwalkar, Shrikant S. & Thongmee, Sansern, 1996. "Determination of common due window location in a single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 93(1), pages 68-74, August.
- Cary Swoveland, 1975. "A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs," Management Science, INFORMS, vol. 21(9), pages 1007-1013, May.
- Niklas Kohl & Oli B. G. Madsen, 1997. "An Optimization Algorithm for the Vehicle Routing Problem with Time Windows Based on Lagrangian Relaxation," Operations Research, INFORMS, vol. 45(3), pages 395-406, June.
- Albert Wagelmans & Stan van Hoesel & Antoon Kolen, 1992. "Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case," Operations Research, INFORMS, vol. 40(1-supplem), pages 145-156, February.
- Marshall L. Fisher & Kurt O. Jörnsten & Oli B. G. Madsen, 1997. "Vehicle Routing with Time Windows: Two Optimization Algorithms," Operations Research, INFORMS, vol. 45(3), pages 488-492, June.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Dong X. Shaw & Albert P. M. Wagelmans, 1998. "An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs," Management Science, INFORMS, vol. 44(6), pages 831-838, June.
- van Hoesel, C.P.M. & Wagelmans, A.P.M., 1997. "Fully Polynomial Approximation Schemes for Single-Item Capacitated Economic Lot-Sizing Problems," Econometric Institute Research Papers EI 9735/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Awi Federgruen & Michal Tzur, 1991. "A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time," Management Science, INFORMS, vol. 37(8), pages 909-925, August.
- Alok Aggarwal & James K. Park, 1993. "Improved Algorithms for Economic Lot Size Problems," Operations Research, INFORMS, vol. 41(3), pages 549-571, June.
- Gabriel R. Bitran & Thomas L. Magnanti & Horacio H. Yanasse, 1984. "Approximation Methods for the Uncapacitated Dynamic Lot Size Problem," Management Science, INFORMS, vol. 30(9), pages 1121-1140, September.
- Chung-Yee Lee & Eric V. Denardo, 1986. "Rolling Planning Horizons: Error Bounds for the Dynamic Lot Size Model," Mathematics of Operations Research, INFORMS, vol. 11(3), pages 423-432, August.
- M. Florian & J. K. Lenstra & A. H. G. Rinnooy Kan, 1980. "Deterministic Production Planning: Algorithms and Complexity," Management Science, INFORMS, vol. 26(7), pages 669-679, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yasemin Merzifonluoğlu & Joseph Geunes & H.E. Romeijn, 2007. "Integrated capacity, demand, and production planning with subcontracting and overtime options," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(4), pages 433-447, June.
- Akartunalı, Kerem & Dauzère-Pérès, Stéphane, 2022. "Dynamic lot sizing with stochastic demand timing," European Journal of Operational Research, Elsevier, vol. 302(1), pages 221-229.
- Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Guiffrida, Alfred L. & Nagi, Rakesh, 2006. "Cost characterizations of supply chain delivery performance," International Journal of Production Economics, Elsevier, vol. 102(1), pages 22-36, July.
- Yongpei Guan & Andrew J. Miller, 2008. "Polynomial-Time Algorithms for Stochastic Uncapacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 56(5), pages 1172-1183, October.
- Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
- Yiyong Xiao & Meng You & Xiaorong Zuo & Shenghan Zhou & Xing Pan, 2018. "The Uncapacitatied Dynamic Single-Level Lot-Sizing Problem under a Time-Varying Environment and an Exact Solution Approach," Sustainability, MDPI, vol. 10(11), pages 1-14, October.
- Jaruphongsa, Wikrom & Cetinkaya, Sila & Lee, Chung-Yee, 2004. "Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain," International Journal of Production Economics, Elsevier, vol. 92(2), pages 169-180, November.
- Guan, Yongpei & Liu, Tieming, 2010. "Stochastic lot-sizing problem with inventory-bounds and constant order-capacities," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1398-1409, December.
- Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- WOLSEY, Laurence A., 2005. "Lot-sizing with production and delivery time windows," LIDAM Discussion Papers CORE 2005043, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
- Yongpei Guan, 2011. "Stochastic lot-sizing with backlogging: computational complexity analysis," Journal of Global Optimization, Springer, vol. 49(4), pages 651-678, April.
- Bakker, Hannah & Bindewald, Viktor & Dunke, Fabian & Nickel, Stefan, 2023. "Logistics for diagnostic testing: An adaptive decision-support framework," European Journal of Operational Research, Elsevier, vol. 311(3), pages 1120-1133.
- Hark‐Chin Hwang, 2007. "Dynamic lot‐sizing model with production time windows," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 692-701, September.
- Darvish, Maryam & Coelho, Leandro C., 2018. "Sequential versus integrated optimization: Production, location, inventory control, and distribution," European Journal of Operational Research, Elsevier, vol. 268(1), pages 203-214.
- Andrew Lim & Zhaowei Miao & Brian Rodrigues & Zhou Xu, 2005. "Transshipment through crossdocks with inventory and time windows," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(8), pages 724-733, December.
- Merzifonluoglu, Yasemin & Geunes, Joseph, 2006. "Uncapacitated production and location planning models with demand fulfillment flexibility," International Journal of Production Economics, Elsevier, vol. 102(2), pages 199-216, August.
- Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lee, C.Y. & Cetinkaya, S. & Wagelmans, A.P.M., 1999. "A dynamic lot-sizing model with demand time windows," Econometric Institute Research Papers EI 9948-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Chung-Yee Lee & Sila Çetinkaya & Albert P.M. Wagelmans, 1999. "A Dynamic Lot-Sizing Model with Demand Time Windows," Tinbergen Institute Discussion Papers 99-095/4, Tinbergen Institute.
- Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
- Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
- van den Heuvel, W.J. & Wagelmans, A.P.M., 2003.
"A geometric algorithm to solve the NI/G/NI/ND capacitated lot-sizing problem in O(T2) time,"
Econometric Institute Research Papers
EI 2003-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Geometric Algorithm to solve the NI/G/NI/ND Capacitated Lot-Sizing Problem in O(T^2) Time," ERIM Report Series Research in Management ERS-2003-066-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
- Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
- Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
- Fink, Jiří & Hurink, Johann L., 2015. "Minimizing costs is easier than minimizing peaks when supplying the heat demand of a group of houses," European Journal of Operational Research, Elsevier, vol. 242(2), pages 644-650.
- Goisque, Guillaume & Rapine, Christophe, 2017. "An efficient algorithm for the 2-level capacitated lot-sizing problem with identical capacities at both levels," European Journal of Operational Research, Elsevier, vol. 261(3), pages 918-928.
- Chung-Lun Li & Vernon Ning Hsu & Wen-Qiang Xiao, 2004. "Dynamic Lot Sizing with Batch Ordering and Truckload Discounts," Operations Research, INFORMS, vol. 52(4), pages 639-654, August.
- van Hoesel, C.P.M. & Romeijn, H.E. & Romero Morales, M.D. & Wagelmans, A., 2002. "Polynomial time algorithms for some multi-level lot-sizing problems with production capacities," Research Memorandum 018, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Alper Atamtürk & Dorit S. Hochbaum, 2001. "Capacity Acquisition, Subcontracting, and Lot Sizing," Management Science, INFORMS, vol. 47(8), pages 1081-1100, August.
- van den Heuvel, W., 2004. "On the complexity of the economic lot-sizing problem with remanufacturing options," Econometric Institute Research Papers EI 2004-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- van den Heuvel, Wilco & Wagelmans, Albert P.M., 2006.
"A polynomial time algorithm for a deterministic joint pricing and inventory model,"
European Journal of Operational Research, Elsevier, vol. 170(2), pages 463-480, April.
- van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Polynomial Time Algorithm for a Deterministic Joint Pricing and Inventory Model," ERIM Report Series Research in Management ERS-2003-065-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Fleischhacker, Adam J. & Zhao, Yao, 2011. "Planning for demand failure: A dynamic lot size model for clinical trial supply chains," European Journal of Operational Research, Elsevier, vol. 211(3), pages 496-506, June.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2007.
"Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems,"
Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2002. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Working Papers MRG/0001, Department of Management Science, Lancaster University, revised Nov 2004.
- van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
More about this item
Keywords
Lot Sizing; Dynamic Programming; Time Windows;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:47:y:2001:i:10:p:1384-1395. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.