Queueing Model Improves IBM's Semiconductor Capacity and Lead-Time Management
Author
Abstract
Suggested Citation
DOI: 10.1287/inte.1100.0516
Download full text from publisher
References listed on IDEAS
- Robert C. Leachman & Jeenyoung Kang & Vincent Lin, 2002. "SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics," Interfaces, INFORMS, vol. 32(1), pages 61-77, February.
- Stuart Bermon & Sarah Jean Hood, 1999. "Capacity Optimization Planning System (CAPS)," Interfaces, INFORMS, vol. 29(5), pages 31-50, October.
- Sungmin Park & John W. Fowler & Gerald T. Mackulak & J. Bert Keats & W. Matthew Carlyle, 2002. "D-Optimal Sequential Experiments for Generating a Simulation-Based Cycle Time-Throughput Curve," Operations Research, INFORMS, vol. 50(6), pages 981-990, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- S. K. Samanta & R. Nandi, 2021. "Queue-Length, Waiting-Time and Service Batch Size Analysis for the Discrete-Time GI/D-MSP (a,b) / 1 / ∞ $^{\text {(a,b)}}/1/\infty $ Queueing System," Methodology and Computing in Applied Probability, Springer, vol. 23(4), pages 1461-1488, December.
- Sujit Kumar Samanta & Kousik Das, 2023. "Detailed Analytical and Computational Studies of D-BMAP/D-BMSP/1 Queueing System," Methodology and Computing in Applied Probability, Springer, vol. 25(1), pages 1-37, March.
- Alfred Degbotse & Brian T. Denton & Kenneth Fordyce & R. John Milne & Robert Orzell & Chi-Tai Wang, 2013. "IBM Blends Heuristics and Optimization to Plan Its Semiconductor Supply Chain," Interfaces, INFORMS, vol. 43(2), pages 130-141, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Francisco Barahona & Stuart Bermon & Oktay Günlük & Sarah Hood, 2005. "Robust capacity planning in semiconductor manufacturing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 459-468, August.
- Romauch, Martin & Hartl, Richard F., 2017. "Capacity planning for cluster tools in the semiconductor industry," International Journal of Production Economics, Elsevier, vol. 194(C), pages 167-180.
- Leachman, Robert C. & Ding, Shengwei, 2007. "Integration of speed economics into decision-making for manufacturing management," International Journal of Production Economics, Elsevier, vol. 107(1), pages 39-55, May.
- Phillip O. Kriett & Sebastian Eirich & Martin Grunow, 2017. "Cycle time-oriented mid-term production planning for semiconductor wafer fabrication," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4662-4679, August.
- van Beers, Wim C.M. & Kleijnen, Jack P.C., 2008.
"Customized sequential designs for random simulation experiments: Kriging metamodeling and bootstrapping,"
European Journal of Operational Research, Elsevier, vol. 186(3), pages 1099-1113, May.
- van Beers, W.C.M. & Kleijnen, J.P.C., 2004. "Customized Sequential Designs for Random Simulation Experiments : Kriging Metamodelling and Bootstrapping," Other publications TiSEM 372530d0-3a48-43c5-a91a-4, Tilburg University, School of Economics and Management.
- van Beers, W.C.M. & Kleijnen, J.P.C., 2004. "Customized Sequential Designs for Random Simulation Experiments : Kriging Metamodelling and Bootstrapping," Discussion Paper 2004-63, Tilburg University, Center for Economic Research.
- van Beers, W.C.M. & Kleijnen, J.P.C., 2005. "Customized Sequential Designs for Random Simulation Experiments : Kriging Metamodelling and Bootstrapping," Discussion Paper 2005-55, Tilburg University, Center for Economic Research.
- van Beers, W.C.M. & Kleijnen, J.P.C., 2005. "Customized Sequential Designs for Random Simulation Experiments : Kriging Metamodelling and Bootstrapping," Other publications TiSEM 893d38f9-8ca5-42ae-9737-6, Tilburg University, School of Economics and Management.
- Martínez-Costa, Carme & Mas-Machuca, Marta & Benedito, Ernest & Corominas, Albert, 2014. "A review of mathematical programming models for strategic capacity planning in manufacturing," International Journal of Production Economics, Elsevier, vol. 153(C), pages 66-85.
- Kleijnen, Jack P.C., 2009.
"Kriging metamodeling in simulation: A review,"
European Journal of Operational Research, Elsevier, vol. 192(3), pages 707-716, February.
- Kleijnen, J.P.C., 2007. "Kriging Metamodeling in Simulation : A Review," Discussion Paper 2007-13, Tilburg University, Center for Economic Research.
- Kleijnen, J.P.C., 2007. "Kriging Metamodeling in Simulation : A Review," Other publications TiSEM 29d6926e-c381-4b58-ae58-8, Tilburg University, School of Economics and Management.
- Caner TaskIn, Z. & Tamer Ünal, A., 2009. "Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products," European Journal of Operational Research, Elsevier, vol. 199(1), pages 252-261, November.
- Batur, Demet & Bekki, Jennifer M. & Chen, Xi, 2018. "Quantile regression metamodeling: Toward improved responsiveness in the high-tech electronics manufacturing industry," European Journal of Operational Research, Elsevier, vol. 264(1), pages 212-224.
- Feng Yang & Bruce E. Ankenman & Barry L. Nelson, 2008. "Estimating Cycle Time Percentile Curves for Manufacturing Systems via Simulation," INFORMS Journal on Computing, INFORMS, vol. 20(4), pages 628-643, November.
- J P C Kleijnen & W C M van Beers, 2004.
"Application-driven sequential designs for simulation experiments: Kriging metamodelling,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(8), pages 876-883, August.
- Kleijnen, J.P.C. & van Beers, W.C.M., 2003. "Application-driven Sequential Designs for Simulation Experiments : Kriging Metamodeling," Other publications TiSEM 1af5ac49-a5f3-4b8a-901c-b, Tilburg University, School of Economics and Management.
- Kleijnen, J.P.C. & van Beers, W.C.M., 2003. "Application-driven Sequential Designs for Simulation Experiments : Kriging Metamodeling," Discussion Paper 2003-33, Tilburg University, Center for Economic Research.
- Van-Anh Truong & Robin O. Roundy, 2011. "Multidimensional Approximation Algorithms for Capacity-Expansion Problems," Operations Research, INFORMS, vol. 59(2), pages 313-327, April.
- Payman Jula & Robert C. Leachman, 2010. "Coordinated Multistage Scheduling of Parallel Batch-Processing Machines Under Multiresource Constraints," Operations Research, INFORMS, vol. 58(4-part-1), pages 933-947, August.
- Feng Yang & Bruce Ankenman & Barry L. Nelson, 2007. "Efficient generation of cycle time‐throughput curves through simulation and metamodeling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 78-93, February.
- Shabbir Ahmed & Nikolaos V. Sahinidis, 2003. "An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion," Operations Research, INFORMS, vol. 51(3), pages 461-471, June.
- Payman Jula & Robert Leachman, 2008. "Coordinating decentralized local schedulers in complex supply chain manufacturing," Annals of Operations Research, Springer, vol. 161(1), pages 123-147, July.
- C A Poojari & C Lucas & G Mitra, 2008. "Robust solutions and risk measures for a supply chain planning problem under uncertainty," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(1), pages 2-12, January.
- Yao, Shiqing & Jiang, Zhibin & Li, Na & Zhang, Huai & Geng, Na, 2011. "A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing," International Journal of Production Economics, Elsevier, vol. 130(1), pages 125-133, March.
- Yang, Feng & Liu, Jingang, 2012. "Simulation-based transfer function modeling for transient analysis of general queueing systems," European Journal of Operational Research, Elsevier, vol. 223(1), pages 150-166.
- P. Pedone & G. Vicario & D. Romano, 2009. "Kriging‐based sequential inspection plans for coordinate measuring machines," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 25(2), pages 133-149, March.
More about this item
Keywords
queueing networks; linear programming; semiconductors; manufacturing management; capacity planning; lead-time planning;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:40:y:2010:i:5:p:397-407. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.