IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v16y2024i9p3860-d1388697.html
   My bibliography  Save this article

Optimal Preventive Maintenance Policy for Equipment Rented under Free Leasing as a Contributor to Sustainable Development

Author

Listed:
  • Lazhar Tlili

    (National School of Advanced Sciences and Technologies of Borj Cedria, University of Carthage, Borj Cedria 2084, Tunisia
    Laboratoire de Recherche en Robotique Intelligente, Laboratory: LR20ES02 RIFTSI, Fiabilité et Traitement de Signal et d’Images, University of Tunis, Montfleury, Tunis 1008, Tunisia)

  • Anis Chelbi

    (Ecole Nationale Supérieure d’Ingénieurs de Tunis (ENSIT), Laboratory: LR20ES02 RIFTSI, University of Tunis, Montfleury, Tunis 1008, Tunisia
    Mediterranean School of Business, South Mediterranean University, Lac 2, Tunis 1053, Tunisia)

  • Rim Gharyani

    (Ecole Nationale Supérieure d’Ingénieurs de Tunis (ENSIT), Laboratory: LR20ES02 RIFTSI, University of Tunis, Montfleury, Tunis 1008, Tunisia)

  • Wajdi Trabelsi

    (Laboratoire de Génie Informatique, de Production et de Maintenance (LGIPM), ICN Business School, 57073 Metz, France)

Abstract

Leasing has proven to be a business model that is perfectly suited to the circular economy. It significantly contributes to sustainable development by enabling the reuse of machinery and equipment after each lease period and by including preventive maintenance and overhauls within and between lease terms. This helps to extend the life cycle of equipment, promote value recovery, and reduce waste. This paper examines an imperfect preventive maintenance (PM) strategy applied to equipment rented under the terms of “free leasing”. In free leasing, the lessor makes the equipment available to the customer for a specified period of time without charging rent. In return, the customer is required to purchase the equipment’s consumables exclusively from the lessor. The lessor is also responsible for the maintenance of the equipment at the customer’s premises. The greater the quantity of consumables used by the customer, the more the equipment will deteriorate. Consequently, the lessor must be able to determine the most effective approach to preventive maintenance, ensuring that it aligns with the customer’s planned usage rate while maximizing profit. This work proposes a PM strategy to be adopted by the lessor during the free lease period. This strategy involves the performance of imperfect PM actions just before the start of the lease period and then periodically. Different packages of preventive actions can be applied each time, with each package having a different cost depending on the level of effectiveness in terms of rejuvenating the equipment. Minimal repairs are performed in the event of equipment failure. The decision variables are the PM period to be adopted and the maintenance efficiency level to be chosen for each preventive intervention. The objective is to determine, for a given customer with an estimated consumption rate profile of consumables, the optimal values of these decision variables so that the lessor maximizes their profit. A mathematical model is developed to express the lessor’s average profit over each lease period. A solution procedure is developed for small instances of the problem, and an Artificial Bee Colony algorithm is implemented for larger instances. A numerical example and a sensitivity analysis are presented.

Suggested Citation

  • Lazhar Tlili & Anis Chelbi & Rim Gharyani & Wajdi Trabelsi, 2024. "Optimal Preventive Maintenance Policy for Equipment Rented under Free Leasing as a Contributor to Sustainable Development," Sustainability, MDPI, vol. 16(9), pages 1-24, May.
  • Handle: RePEc:gam:jsusta:v:16:y:2024:i:9:p:3860-:d:1388697
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/16/9/3860/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/16/9/3860/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Huang, Yeu-Shiang & Ho, Jyh-Wen & Hung, Jin-Wei & Tseng, Tzu-Liang (Bill), 2021. "A customized warranty model by considering multi-usage levels for the leasing industry," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    2. Ben Mabrouk, A. & Chelbi, A. & Radhoui, M., 2016. "Optimal imperfect maintenance strategy for leased equipment," International Journal of Production Economics, Elsevier, vol. 178(C), pages 57-64.
    3. Baozhen Yao & Qianqian Yan & Mengjie Zhang & Yunong Yang, 2017. "Improved artificial bee colony algorithm for vehicle routing problem with time windows," PLOS ONE, Public Library of Science, vol. 12(9), pages 1-18, September.
    4. A. Ben Mabrouk & A. Chelbi & M. Radhoui, 2016. "Optimal imperfect preventive maintenance policy for equipment leased during successive periods," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5095-5110, September.
    5. Su, Chun & Wang, Xiaolin, 2016. "A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty," Reliability Engineering and System Safety, Elsevier, vol. 155(C), pages 169-178.
    6. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    7. Pongpech, J. & Murthy, D.N.P., 2006. "Optimal periodic preventive maintenance policy for leased equipment," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 772-777.
    8. Liu, Yanping & Liu, Biyu & Yang, Haidong, 2024. "Optimal pricing and financing strategies for leased equipment considering maintenance and lessees’ options," International Journal of Production Economics, Elsevier, vol. 269(C).
    9. Mahmood Shafiee & Stefanka Chukova & Won Yun & Seyed Niaki, 2011. "On the investment in a reliability improvement program for warranted second-hand items," IISE Transactions, Taylor & Francis Journals, vol. 43(7), pages 525-534.
    10. Chukova, S. & Arnold, R. & Wang, Dong Q., 2004. "Warranty analysis: An approach to modeling imperfect repairs," International Journal of Production Economics, Elsevier, vol. 89(1), pages 57-68, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ben Mabrouk, A. & Chelbi, A. & Radhoui, M., 2016. "Optimal imperfect maintenance strategy for leased equipment," International Journal of Production Economics, Elsevier, vol. 178(C), pages 57-64.
    2. Xia, Tangbin & Sun, Bowen & Chen, Zhen & Pan, Ershun & Wang, Hao & Xi, Lifeng, 2021. "Opportunistic maintenance policy integrating leasing profit and capacity balancing for serial-parallel leased systems," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    3. Shafiee, Mahmood & Chukova, Stefanka, 2013. "Maintenance models in warranty: A literature review," European Journal of Operational Research, Elsevier, vol. 229(3), pages 561-572.
    4. Ammar Y. Alqahtani & Surendra M. Gupta, 2017. "One-Dimensional Renewable Warranty Management within Sustainable Supply Chain," Resources, MDPI, vol. 6(2), pages 1-26, April.
    5. Sharafali, Moosa & Tarakci, Hakan & Kulkarni, Shailesh & Razack Shahul Hameed, Raja Abdul, 2019. "Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance," International Journal of Production Economics, Elsevier, vol. 208(C), pages 53-68.
    6. Zhu, Ying & Xia, Tangbin & Chen, Zhen & Pan, Ershun & Xi, Lifeng, 2022. "Optimal maintenance service strategy for OEM entering competitive MRO market under opposite patterns," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    7. Wang, Yukun & Liu, Yiliu & Liu, Zixian & Li, Xiaopeng, 2017. "On reliability improvement program for second-hand products sold with a two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 452-463.
    8. Xia, Tangbin & Cao, Lei & Xu, Yuhui & Zhang, Kaigan & Chen, Zhen & Pan, Ershun & Xi, Lifeng, 2024. "Multi-level maintenance and inventory joint optimization for a k-out-of-n hyper-system considering the selection of suppliers with incentive discount policies," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    9. Amel Ben Mabrouk & Anis Chelbi & Mohamed Salah Aguir & Sofiene Dellagi, 2024. "Optimal Maintenance Policy for Equipment Submitted to Multi-Period Leasing as a Circular Business Model," Sustainability, MDPI, vol. 16(12), pages 1-14, June.
    10. Mohamed Noomane Darghouth & Anis Chelbi & Daoud Ait-kadi, 2017. "Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4643-4661, August.
    11. Alqahtani, Ammar Y. & Gupta, Surendra M. & Nakashima, Kenichi, 2019. "Warranty and maintenance analysis of sensor embedded products using internet of things in industry 4.0," International Journal of Production Economics, Elsevier, vol. 208(C), pages 483-499.
    12. Huang, Yeu-Shiang & Fang, Chih-Chiang & Lu, Chang-Ming & (Bill) Tseng, Tzu-Liang, 2022. "Optimal Warranty Policy for Consumer Electronics with Dependent Competing Failure Processes," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    13. Xia, Tangbin & Dong, Yifan & Xiao, Lei & Du, Shichang & Pan, Ershun & Xi, Lifeng, 2018. "Recent advances in prognostics and health management for advanced manufacturing paradigms," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 255-268.
    14. Rossi, Tommaso & Pozzi, Rossella & Testa, Mariapaola, 2017. "EOQ-based inventory management in single-machine multi-item systems," Omega, Elsevier, vol. 71(C), pages 106-113.
    15. Wang, Xiaolin & Liu, Bin & Zhao, Xiujie, 2021. "A performance-based warranty for products subject to competing hard and soft failures," International Journal of Production Economics, Elsevier, vol. 233(C).
    16. Ruey Yeh & Wen Chang & Hui-Chiung Lo, 2010. "Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method," Annals of Operations Research, Springer, vol. 181(1), pages 171-183, December.
    17. Wang, Xiaolin & Li, Lishuai & Xie, Min, 2020. "An unpunctual preventive maintenance policy under two-dimensional warranty," European Journal of Operational Research, Elsevier, vol. 282(1), pages 304-318.
    18. Santos, Augusto César de Jesus & Cavalcante, Cristiano Alexandre Virgínio & Wu, Shaomin, 2023. "Maintenance policies and models: A bibliometric and literature review of strategies for reuse and remanufacturing," Reliability Engineering and System Safety, Elsevier, vol. 231(C).
    19. Zhu, Xiaoyan & Jiao, Can & Yuan, Tao, 2019. "Optimal decisions on product reliability, sales and promotion under nonrenewable warranties," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    20. Toon Vanderschueren & Robert Boute & Tim Verdonck & Bart Baesens & Wouter Verbeke, 2022. "Prescriptive maintenance with causal machine learning," Papers 2206.01562, arXiv.org.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:16:y:2024:i:9:p:3860-:d:1388697. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.