Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2018.11.019
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hamidi, Maryam & Liao, Haitao & Szidarovszky, Ferenc, 2016. "Non-cooperative and cooperative game-theoretic models for usage-based lease contracts," European Journal of Operational Research, Elsevier, vol. 255(1), pages 163-174.
- Tarakci, Hakan & Tang, Kwei & Teyarachakul, Sunantha, 2009. "Learning effects on maintenance outsourcing," European Journal of Operational Research, Elsevier, vol. 192(1), pages 138-150, January.
- Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
- Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
- Grout, John R., 1997. "A model of incentive contracts for just-in-time delivery," European Journal of Operational Research, Elsevier, vol. 96(1), pages 139-147, January.
- Richard Barlow & Larry Hunter, 1960. "Optimum Preventive Maintenance Policies," Operations Research, INFORMS, vol. 8(1), pages 90-100, February.
- Tamer Boyaci & Saibal Ray, 2003. "Product Differentiation and Capacity Cost Interaction in Time and Price Sensitive Markets," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 18-36, May.
- Murthy, D. N. P. & Asgharizadeh, E., 1999. "Optimal decision making in a maintenance service operation," European Journal of Operational Research, Elsevier, vol. 116(2), pages 259-273, July.
- Teck H. Ho & Yu-Sheng Zheng, 2004. "Setting Customer Expectation in Service Delivery: An Integrated Marketing-Operations Perspective," Management Science, INFORMS, vol. 50(4), pages 479-488, April.
- Rodrigo Pascual & Gabriel Santelices & Haitao Liao & Sergio Maturana, 2016. "Channel coordination on fixed-term maintenance outsourcing contracts," IISE Transactions, Taylor & Francis Journals, vol. 48(7), pages 651-660, July.
- J. Ansell & A. Bendell & S. Humble, 1984. "Age Replacement Under Alternative Cost Criteria," Management Science, INFORMS, vol. 30(3), pages 358-367, March.
- Erica L. Plambeck & Stefanos A. Zenios, 2000. "Performance-Based Incentives in a Dynamic Principal-Agent Model," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 240-263, April.
- So, Kut C. & Song, Jing-Sheng, 1998. "Price, delivery time guarantees and capacity selection," European Journal of Operational Research, Elsevier, vol. 111(1), pages 28-49, November.
- A. Ben Mabrouk & A. Chelbi & M. Radhoui, 2016. "Optimal imperfect preventive maintenance policy for equipment leased during successive periods," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5095-5110, September.
- Huang, Yonghui & Guo, Xianping, 2011. "Finite horizon semi-Markov decision processes with application to maintenance systems," European Journal of Operational Research, Elsevier, vol. 212(1), pages 131-140, July.
- Ekin, Tahir, 2018. "Integrated maintenance and production planning with endogenous uncertain yield," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 52-61.
- Y. S. Sherif & M. L. Smith, 1981. "Optimal maintenance models for systems subject to failure–A Review," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 28(1), pages 47-74, March.
- Jaturonnatee, J. & Murthy, D.N.P. & Boondiskulchok, R., 2006. "Optimal preventive maintenance of leased equipment with corrective minimal repairs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 201-215, October.
- Hora, Michael E., 1987. "The unglamorous game of managing maintenance," Business Horizons, Elsevier, vol. 30(3), pages 67-75.
- Eti, M.C. & Ogaji, S.O.T. & Probert, S.D., 2006. "Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture," Applied Energy, Elsevier, vol. 83(11), pages 1235-1248, November.
- Andy Alexander & Yanjun Li & Robert Plante, 2017. "Sustaining system coordination in outsourcing the maintenance function of a process having a linear failure rate," IISE Transactions, Taylor & Francis Journals, vol. 49(5), pages 544-552, May.
- John R. Grout & David P. Christy, 1993. "An inventory model of incentives for on‐time delivery in just‐in‐time purchasing contracts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(6), pages 863-877, October.
- Kut C. So, 2000. "Price and Time Competition for Service Delivery," Manufacturing & Service Operations Management, INFORMS, vol. 2(4), pages 392-409, April.
- Alaswad, Suzan & Xiang, Yisha, 2017. "A review on condition-based maintenance optimization models for stochastically deteriorating system," Reliability Engineering and System Safety, Elsevier, vol. 157(C), pages 54-63.
- Pongpech, J. & Murthy, D.N.P., 2006. "Optimal periodic preventive maintenance policy for leased equipment," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 772-777.
- Ray, Saibal & Jewkes, E. M., 2004. "Customer lead time management when both demand and price are lead time sensitive," European Journal of Operational Research, Elsevier, vol. 153(3), pages 769-781, March.
- Olde Keizer, Minou C.A. & Flapper, Simme Douwe P. & Teunter, Ruud H., 2017. "Condition-based maintenance policies for systems with multiple dependent components: A review," European Journal of Operational Research, Elsevier, vol. 261(2), pages 405-420.
- Urban, Timothy L., 2009. "Establishing delivery guarantee policies," European Journal of Operational Research, Elsevier, vol. 196(3), pages 959-967, August.
- Toshio Nakagawa, 2005. "Maintenance Theory of Reliability," Springer Series in Reliability Engineering, Springer, number 978-1-84628-221-8, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Tao, Liangyan & Liu, Sifeng & Xie, Naiming & Javed, Saad Ahmed, 2021. "Optimal position of supply chain delivery window with risk-averse suppliers: A CVaR optimization approach," International Journal of Production Economics, Elsevier, vol. 232(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jackson, Canek & Pascual, Rodrigo & Mac Cawley, Alejandro & Godoy, Sergio, 2023. "Product–service system negotiation in aircraft lease contracts with option of disagreement," Journal of Air Transport Management, Elsevier, vol. 107(C).
- Hashemi, M. & Asadi, M. & Zarezadeh, S., 2020. "Optimal maintenance policies for coherent systems with multi-type components," Reliability Engineering and System Safety, Elsevier, vol. 195(C).
- Urban, Timothy L., 2009. "Establishing delivery guarantee policies," European Journal of Operational Research, Elsevier, vol. 196(3), pages 959-967, August.
- Hammami, Ramzi & Frein, Yannick & Nouira, Imen & Albana, Abduh-Sayid, 2022. "On the interplay between local lead times, overall lead time, prices, and profits in decentralized supply chains," International Journal of Production Economics, Elsevier, vol. 243(C).
- BadÃa, F.G. & Berrade, M.D. & Cha, Ji Hwan & Lee, Hyunju, 2018. "Optimal replacement policy under a general failure and repair model: Minimal versus worse than old repair," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 362-372.
- Weixin Shang & Liming Liu, 2011. "Promised Delivery Time and Capacity Games in Time-Based Competition," Management Science, INFORMS, vol. 57(3), pages 599-610, March.
- Jalili Marand, Ata & Li, Hongyan & Thorstenson, Anders, 2019. "Joint inventory control and pricing in a service-inventory system," International Journal of Production Economics, Elsevier, vol. 209(C), pages 78-91.
- Qian, Li, 2014. "Market-based supplier selection with price, delivery time, and service level dependent demand," International Journal of Production Economics, Elsevier, vol. 147(PC), pages 697-706.
- Zhao, Jing & Zhang, Qin, 2021. "The effect of contract methods on the lead time of a two-level photovoltaic supply chain: revenue-sharing vs. cost-sharing," Energy, Elsevier, vol. 231(C).
- Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
- Huang, Yeu-Shiang & Chen, Si-Hen & Ho, Jyh-Wen, 2013. "A study on pricing and delivery strategy for e-retailing systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 59(C), pages 71-84.
- Ülkü, M. Ali & Bookbinder, James H., 2012. "Optimal quoting of delivery time by a third party logistics provider: The impact of shipment consolidation and temporal pricing schemes," European Journal of Operational Research, Elsevier, vol. 221(1), pages 110-117.
- Xia, Tangbin & Dong, Yifan & Xiao, Lei & Du, Shichang & Pan, Ershun & Xi, Lifeng, 2018. "Recent advances in prognostics and health management for advanced manufacturing paradigms," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 255-268.
- Yang, Yang & Liu, Jie & Hu, Taizhong, 2023. "Capital allocation and pricing decisions under trade credit with time-sensitive stochastic demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 173(C).
- Finkelstein, Maxim & Cha, Ji Hwan & Langston, Amy, 2023. "Improving classical optimal age-replacement policies for degrading items," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Jayaswal, Sachin & Jewkes, Elizabeth & Ray, Saibal, 2011. "Product differentiation and operations strategy in a capacitated environment," European Journal of Operational Research, Elsevier, vol. 210(3), pages 716-728, May.
- Jayaswal, Sachin, 2014. "Priority Service System Optimization under Service Level Constraints," IIMA Working Papers WP2014-08-04, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Abhijit Upasani & Reha Uzsoy, 2008. "Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions," Annals of Operations Research, Springer, vol. 161(1), pages 171-188, July.
- Insua, David Rios & Ruggeri, Fabrizio & Soyer, Refik & Wilson, Simon, 2020. "Advances in Bayesian decision making in reliability," European Journal of Operational Research, Elsevier, vol. 282(1), pages 1-18.
- Shafiee, Mahmood & Chukova, Stefanka, 2013. "Maintenance models in warranty: A literature review," European Journal of Operational Research, Elsevier, vol. 229(3), pages 561-572.
More about this item
Keywords
Maintenance; Reliability; Availability; Outsourcing; Channel coordination; Game theory; Nash and stackelberg equilibria;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:53-68. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.