Proposing a Quality Inspection Process Model Using Advanced Technologies for the Transition to Smart Building Construction
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Seungho Kim & Sangyong Kim & Dong-Eun Lee, 2020. "Sustainable Application of Hybrid Point Cloud and BIM Method for Tracking Construction Progress," Sustainability, MDPI, vol. 12(10), pages 1-16, May.
- Ricardo Eiris & Masoud Gheisari & Behzad Esmaeili, 2018. "PARS: Using Augmented 360-Degree Panoramas of Reality for Construction Safety Training," IJERPH, MDPI, vol. 15(11), pages 1-21, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sunkuk Kim, 2021. "Technology and Management for Sustainable Buildings and Infrastructures," Sustainability, MDPI, vol. 13(16), pages 1-3, August.
- Ahmed Khairadeen Ali & One Jae Lee & Doyeop Lee & Chansik Park, 2021. "Remote Indoor Construction Progress Monitoring Using Extended Reality," Sustainability, MDPI, vol. 13(4), pages 1-23, February.
- Mojtaba Noghabaei & Arsalan Heydarian & Vahid Balali & Kevin Han, 2020. "Trend Analysis on Adoption of Virtual and Augmented Reality in the Architecture, Engineering, and Construction Industry," Data, MDPI, vol. 5(1), pages 1-18, March.
- Xiangcheng Meng & Huaiyuan Zhai & Alan H. S. Chan, 2019. "Development of Scales to Measure and Analyse the Relationship of Safety Consciousness and Safety Citizenship Behaviour of Construction Workers: An Empirical Study in China," IJERPH, MDPI, vol. 16(8), pages 1-18, April.
- Paweł Strzałkowski & Paweł Bęś & Mariusz Szóstak & Mateusz Napiórkowski, 2024. "Application of Virtual Reality (VR) Technology in Mining and Civil Engineering," Sustainability, MDPI, vol. 16(6), pages 1-16, March.
- Daniel Salinas & Felipe Muñoz-La Rivera & Javier Mora-Serrano, 2022. "Critical Analysis of the Evaluation Methods of Extended Reality (XR) Experiences for Construction Safety," IJERPH, MDPI, vol. 19(22), pages 1-26, November.
- Namhyuk Ham & Baek-Il Bae & Ok-Kyung Yuh, 2020. "Phased Reverse Engineering Framework for Sustainable Cultural Heritage Archives Using Laser Scanning and BIM: The Case of the Hwanggungwoo (Seoul, Korea)," Sustainability, MDPI, vol. 12(19), pages 1-23, October.
- Gang Yu & Lihua Shi & Yan Wang & Jing Xiong & Yucong Jin, 2023. "A Collaborative Emergency Drill System for Urban Tunnels Using BIM and an Agent-Based Model," Sustainability, MDPI, vol. 15(18), pages 1-19, September.
More about this item
Keywords
application programming interface (API); building information modeling (BIM); construction quality inspection; smart building construction; smart technologies;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:1:p:815-:d:1022902. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.