Research on the Influence of Risk on Construction Project Performance: A Systematic Review
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
- Ruqaya Al-Sabah & Carol C. Menassa & Awad Hanna, 2014. "Evaluating impact of construction risks in the Arabian Gulf Region from perspective of multinational architecture, engineering and construction firms," Construction Management and Economics, Taylor & Francis Journals, vol. 32(4), pages 382-402, April.
- Hamidreza Khalesi & Amirhossein Balali & Alireza Valipour & Jurgita Antucheviciene & Darius Migilinskas & Viaceslav Zigmund, 2020. "Application of Hybrid SWARA–BIM in Reducing Reworks of Building Construction Projects from the Perspective of Time," Sustainability, MDPI, vol. 12(21), pages 1-20, October.
- Ahsan Nawaz & Ahsan Waqar & Syyed Adnan Raheel Shah & Muhammad Sajid & Muhammad Irslan Khalid, 2019. "An Innovative Framework for Risk Management in Construction Projects in Developing Countries: Evidence from Pakistan," Risks, MDPI, vol. 7(1), pages 1-10, February.
- Rocío Rodríguez-Rivero & Isabel Ortiz-Marcos & Javier Romero & Luis Ballesteros-Sánchez, 2020. "Finding the Links between Risk Management and Project Success: Evidence from International Development Projects in Colombia," Sustainability, MDPI, vol. 12(21), pages 1-19, November.
- Seyed Mohammad Seyedhoseini & Siamak Noori & Mohammad Ali Hatefi, 2009. "An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions," Risk Analysis, John Wiley & Sons, vol. 29(5), pages 752-763, May.
- Henry A. Odeyinka & John Lowe & Ammar P. Kaka, 2013. "Artificial neural network cost flow risk assessment model," Construction Management and Economics, Taylor & Francis Journals, vol. 31(5), pages 423-439, May.
- I Putu Artama Wiguna & Stephen Scott, 2006. "Relating risk to project performance in Indonesian building contracts," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1125-1135.
- Tasci, Asli D.A. & Wei, Wei & Milman, Ady, 2020. "Uses and misuses of the case study method," Annals of Tourism Research, Elsevier, vol. 82(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yonggu Kim & Keeyoung Shin & Joseph Ahn & Eul-Bum Lee, 2017. "Probabilistic Cash Flow-Based Optimal Investment Timing Using Two-Color Rainbow Options Valuation for Economic Sustainability Appraisement," Sustainability, MDPI, vol. 9(10), pages 1-16, October.
- Ahsan Nawaz & Xing Su & Qaiser Mohi Ud Din & Muhammad Irslan Khalid & Muhammad Bilal & Syyed Adnan Raheel Shah, 2020. "Identification of the H&S (Health and Safety Factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project," IJERPH, MDPI, vol. 17(2), pages 1-18, January.
- Xiaoyan Jiang & Sai Wang & Jie Wang & Sainan Lyu & Martin Skitmore, 2020. "A Decision Method for Construction Safety Risk Management Based on Ontology and Improved CBR: Example of a Subway Project," IJERPH, MDPI, vol. 17(11), pages 1-23, June.
- Dengsheng Wu & Xiaoqian Zhu & Jie Wan & Chunbing Bao & Jianping Li, 2019. "A Multiobjective Optimization Approach for Selecting Risk Response Strategies of Software Project: From the Perspective of Risk Correlations," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 339-364, January.
- Mahsa Parsaei Motamed & Shahrooz Bamdad, 2022. "A multi-objective optimization approach for selecting risk response actions: considering environmental and secondary risks," OPSEARCH, Springer;Operational Research Society of India, vol. 59(1), pages 266-303, March.
- Ji, Chenyi & Su, Xing & Qin, Zhongfu & Nawaz, Ahsan, 2022. "Probability Analysis of Construction Risk based on Noisy-or Gate Bayesian Networks," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
- Nicholas Thom & Andrew Dawson, 2019. "Sustainable Road Design: Promoting Recycling and Non-Conventional Materials," Sustainability, MDPI, vol. 11(21), pages 1-12, November.
- David Curto & Fernando Acebes & Jose M Gonzalez-Varona & David Poza, 2024. "Impact of aleatoric, stochastic and epistemic uncertainties on project cost contingency reserves," Papers 2406.03500, arXiv.org.
- Hsu-Shih Shih & I-Fei Chen & Nolberto Munier & Zena Alcide, 2023. "Investigating Risk-Constraint Nexus of Construction Projects in Caribbean Small Island Developing States," SAGE Open, , vol. 13(1), pages 21582440231, March.
- Yali Chen & Dan Huang & Zhen Liu & Mohamed Osmani & Peter Demian, 2022. "Construction 4.0, Industry 4.0, and Building Information Modeling (BIM) for Sustainable Building Development within the Smart City," Sustainability, MDPI, vol. 14(16), pages 1-37, August.
- Fatemeh Mostofi & Vedat Toğan & Yunus Emre Ayözen & Onur Behzat Tokdemir, 2022. "Predicting the Impact of Construction Rework Cost Using an Ensemble Classifier," Sustainability, MDPI, vol. 14(22), pages 1-19, November.
- Yiqing Su & Qiaoyuan Huang & Qi Meng & Liangzhen Zang & Hua Xiao, 2023. "Socialized Farmland Operation—An Institutional Interpretation of Farmland Scale Management," Sustainability, MDPI, vol. 15(4), pages 1-21, February.
- Xiao Han & Jiayun Zhang, 2022. "Business Model Innovation Paths of Manufacturing Oriented towards Green Development in Digital Economy," IJERPH, MDPI, vol. 19(24), pages 1-34, December.
- Hui-Ping Tserng & I-Cheng Cho & Chun-Hung Chen & Yu-Fan Liu, 2021. "Developing a Risk Management Process for Infrastructure Projects Using IDEF0," Sustainability, MDPI, vol. 13(12), pages 1-22, June.
- Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
- Eichfelder, Sebastian & Kluska, Mike & Knaisch, Jonas & Selle, Juliane, 2021. "Senkung der Unternehmenssteuerlast versus Förderung von Investitionen: Was ist die bessere Strategie zur Förderung der Standortattraktivität Deutschlands?," arqus Discussion Papers in Quantitative Tax Research 263, arqus - Arbeitskreis Quantitative Steuerlehre.
- Hamad Almujibah, 2023. "Assessment of Building Information Modeling (BIM) as a Time and Cost-Saving Construction Management Tool: Evidence from Two-Story Villas in Jeddah," Sustainability, MDPI, vol. 15(9), pages 1-26, April.
- John Malu Nzioki & Dr. Mary Nyawira Mwenda, 2021. "Enhancing Performance of the Building Construction Industry through Quantitative Risk Analysis and Risk Response: A Case of Exchequer Funded Building Construction Projects in Machakos County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(3), pages 31-39, March.
- Chien-Liang Lin & Bey-Kun Chen, 2021. "Research for Risk Management of Construction Projects in Taiwan," Sustainability, MDPI, vol. 13(4), pages 1-15, February.
- Eichfelder, Sebastian & Kluska, Mike & Knaisch, Jonas & Selle, Juliane, 2021. "Senkung der Unternehmenssteuerlast versus Förderung von Investitionen: Was ist die bessere Strategie zur Förderung der Standortattraktivität Deutschlands?," arqus Discussion Papers in Quantitative Tax Research 266, arqus - Arbeitskreis Quantitative Steuerlehre.
More about this item
Keywords
risk influence; construction project performance; contents analysis; method analysis; review;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:11:p:6412-:d:822867. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.