IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v32y2014i4p382-402.html
   My bibliography  Save this article

Evaluating impact of construction risks in the Arabian Gulf Region from perspective of multinational architecture, engineering and construction firms

Author

Listed:
  • Ruqaya Al-Sabah
  • Carol C. Menassa
  • Awad Hanna

Abstract

Although multinational firms use risk mitigation measures when venturing into new international markets, there has been little research into identifying and evaluating the impact of these risks on project and multinational firm performance in the Arabian Gulf Region (AGR). Risks encountered in the AGR are identified through a data collection process from multinational architecture, engineering and construction (AEC) companies with work experience in the AGR. The impact of these risks on four performance metrics (i.e. project cost, schedule and performance; and company performance) is then evaluated using relative importance index (RII), significance score (SS) and principal component analysis (PCA) for validation. The results indicate that multinational firms are potentially exposed to a total of 27 external risks and 47 internal risks. Of the 27 external risks, war threat, political instability, price inflation, resources availability and quality, authorities and regulations requirements, and inclement climate have the most significant impact on the four performance metrics. Of the 47 internal risks, defective late design documents, constructive changes and insufficient scope definition have the most significant impact on the four performance metrics. These findings can guide multinational AEC firms in the AGR in establishing effective risk mitigation plans.

Suggested Citation

  • Ruqaya Al-Sabah & Carol C. Menassa & Awad Hanna, 2014. "Evaluating impact of construction risks in the Arabian Gulf Region from perspective of multinational architecture, engineering and construction firms," Construction Management and Economics, Taylor & Francis Journals, vol. 32(4), pages 382-402, April.
  • Handle: RePEc:taf:conmgt:v:32:y:2014:i:4:p:382-402
    DOI: 10.1080/01446193.2014.884281
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2014.884281
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2014.884281?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
    2. Jelena M. Andrić & Jiayuan Wang & Ruoyu Zhong, 2019. "Identifying the Critical Risks in Railway Projects Based on Fuzzy and Sensitivity Analysis: A Case Study of Belt and Road Projects," Sustainability, MDPI, vol. 11(5), pages 1-18, March.
    3. Guiliang Su & Rana Khallaf, 2022. "Research on the Influence of Risk on Construction Project Performance: A Systematic Review," Sustainability, MDPI, vol. 14(11), pages 1-19, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:32:y:2014:i:4:p:382-402. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.