Methodology of Planning the Course of the Cumulative Cost Curve in Construction Projects

Author

Listed:
  • Jarosław Konior

    (Department of Building Engineering, Faculty of Civil Engineering, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

  • Mariusz Szóstak

    (Department of Building Engineering, Faculty of Civil Engineering, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

Abstract

Appropriate planning and effective monitoring of the execution of construction projects is important with regard to their successful sustainment of implementation. Time and cost are key elements that determine the success or failure of construction projects. The obtaining of a rational S-curve course before the start of a construction project that reflects reality is important for all the participants involved in implementing an investment task. The article proposes an original methodology for planning the course of the cumulative cost curve in construction projects. It uses a method of shaping the S-curve, which is well-known in both literature and practical approaches. On the basis of the authors’ own research carried out in a homogeneous research group of hotel facilities, the areas of the curve for the correct planning of costs in construction projects were designated, which determine the boundaries of the predicted costs accumulated over time. The data for the development of the authors’ research methodology is the result of the authors’ own experience and professional work. The authors carried out Bank Investment Supervision in the years 2006–2019 on behalf of the banks that grant investment loans for non-public contracts. Knowing the total cost and duration of the planned construction project, which were determined on the basis of project documentation, cost estimates, and also their own database regarding planned and completed deadlines and budgets of similar investments, 6th degree polynomials of the real costs of the construction works were determined. This approach enabled the correct planning of costs over time and the determination of planned monthly amounts of construction works to be executed.

Suggested Citation

  • Jarosław Konior & Mariusz Szóstak, 2020. "Methodology of Planning the Course of the Cumulative Cost Curve in Construction Projects," Sustainability, MDPI, vol. 12(6), pages 1-22, March.
  • Handle: RePEc:gam:jsusta:v:12:y:2020:i:6:p:2347-:d:333645
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/12/6/2347/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/12/6/2347/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Yao, Jing-Shing & Chen, Miao-Sheng & Lu, Huei-Fu, 2006. "A fuzzy stochastic single-period model for cash management," European Journal of Operational Research, Elsevier, vol. 170(1), pages 72-90, April.
    2. K. C. Lam & A.T.P. So & Tiesong Hu & Thomas Ng & R. K. K. Yuen & S. M. Lo & S. O. Cheung & Hongwei Yang, 2001. "An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making," Construction Management and Economics, Taylor & Francis Journals, vol. 19(1), pages 63-76, January.
    3. Agnieszka Leśniak & Krzysztof Zima, 2018. "Cost Calculation of Construction Projects Including Sustainability Factors Using the Case Based Reasoning (CBR) Method," Sustainability, MDPI, vol. 10(5), pages 1-14, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Agnieszka Leśniak & Monika Górka & Izabela Skrzypczak, 2021. "Barriers to BIM Implementation in Architecture, Construction, and Engineering Projects—The Polish Study," Energies, MDPI, vol. 14(8), pages 1-20, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    2. Zhengxun Jin & Jonghyeob Kim & Chang-taek Hyun & Sangwon Han, 2019. "Development of a Model for Predicting Probabilistic Life-Cycle Cost for the Early Stage of Public-Office Construction," Sustainability, MDPI, vol. 11(14), pages 1-18, July.
    3. Moraes, Marcelo Botelho da Costa & Nagano, Marcelo Seido, 2014. "Evolutionary models in cash management policies with multiple assets," Economic Modelling, Elsevier, vol. 39(C), pages 1-7.
    4. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    5. Ágoston, Kolos Cs. & Benedek, Gábor & Gilányi, Zsolt, 2016. "Pareto improvement and joint cash management optimisation for banks and cash-in-transit firms," European Journal of Operational Research, Elsevier, vol. 254(3), pages 1074-1082.
    6. Fengchang Jiang & John Awaitey & Haiyan Xie, 2022. "Analysis of Construction Cost and Investment Planning Using Time Series Data," Sustainability, MDPI, vol. 14(3), pages 1-16, February.
    7. Wojciech Drozd & Agnieszka Leśniak, 2018. "Ecological Wall Systems as an Element of Sustainable Development—Cost Issues," Sustainability, MDPI, vol. 10(7), pages 1-15, June.
    8. Boda Liu & Bin Yang & Jianzhuang Xiao & Dayu Zhu & Binghan Zhang & Zhichen Wang & Miaosi Dong, 2021. "Review of Optimization Dynamically Applied in the Construction and the Application Potential of ICT," Sustainability, MDPI, vol. 13(10), pages 1-18, May.
    9. Abhijit Baidya & Uttam Kumar Bera, 2019. "New model for addressing supply chain and transport safety for disaster relief operations," Annals of Operations Research, Springer, vol. 283(1), pages 33-69, December.
    10. Nahyun Kwon & Joosung Lee & Moonsun Park & Inseok Yoon & Yonghan Ahn, 2019. "Performance Evaluation of Distance Measurement Methods for Construction Noise Prediction Using Case-Based Reasoning," Sustainability, MDPI, vol. 11(3), pages 1-18, February.
    11. Marcos Melo & Feruccio Bilich, 2013. "Expectancy balance model for cash flow," Journal of Economics and Finance, Springer;Academy of Economics and Finance, vol. 37(2), pages 240-252, April.
    12. Edmundas Kazimieras Zavadskas & Jonas Šaparauskas & Jurgita Antucheviciene, 2018. "Sustainability in Construction Engineering," Sustainability, MDPI, vol. 10(7), pages 1-7, June.
    13. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
    14. Daniel Wałach, 2020. "Analysis of Factors Affecting the Environmental Impact of Concrete Structures," Sustainability, MDPI, vol. 13(1), pages 1-14, December.
    15. Jing Zhao & Jie Wei & Xiaochen Sun, 2017. "Coordination of fuzzy closed-loop supply chain with price dependent demand under symmetric and asymmetric information conditions," Annals of Operations Research, Springer, vol. 257(1), pages 469-489, October.
    16. Janusz Kulejewski & Jerzy Rosłon, 2023. "Optimization of Ecological and Economic Aspects of the Construction Schedule with the Use of Metaheuristic Algorithms and Artificial Intelligence," Sustainability, MDPI, vol. 15(1), pages 1-26, January.
    17. Wang, Ge & Li, Yang & Zuo, Jian & Hu, Wenbo & Nie, Qingwei & Lei, Heqian, 2021. "Who drives green innovations? Characteristics and policy implications for green building collaborative innovation networks in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 143(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:12:y:2020:i:6:p:2347-:d:333645. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.