IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v11y2019i5p1239-d209251.html
   My bibliography  Save this article

Assessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants

Author

Listed:
  • Pramesh Krishnankutty

    (Productivity Council, Singapore Chemical Industry Council Limited, 8 Jurong Town Hall Road, #25-04 The JTC Summit, Singapore 609434, Singapore)

  • Bon-Gang Hwang

    (Department of Building, School of Design & Environment, National University of Singapore, 4 Architecture Drive, Singapore 117566, Singapore)

  • Carlos H. Caldas

    (Department of Civil, Architectural, and Environmental Engineering, The University of Texas at Austin, ECJ 5.210, Austin, TX 78712, USA)

  • Sriya Muralidharan

    (Department of Building, School of Design & Environment, National University of Singapore, 4 Architecture Drive, Singapore 117566, Singapore)

  • Daniel P. de Oliveira

    (Construction Industry Institute (CII), 3925 W, Braker Ln, Austin, TX 78759, USA)

Abstract

This paper describes the development of a method to assess the level of implementation of best productivity practices in the petrochemical industry. The proposed methodology focuses on construction, maintenance activities, shutdowns, and turnarounds. Its novelty and importance are emphasized by the lack of productivity studies that target these types of projects. This article reports the research methodology steps including tool development and detailed case study assessments of projects in Singapore. The approach involved the verification of best productivity practices and the development of an assessment method designed to fit the characteristics of petrochemical projects. The assessment points out productivity practices with low implementation levels and provides recommendations to increase their usage. The results showed that the level of implementation of productivity practices in the petrochemical projects investigated was 68.42%, out of a maximum score of 100%. Practices related to Material Management and Equipment Logistics received the lowest scores and recommendations on how to bridge this productivity practice implementation gap were provided. The adoption of the Best Productivity Practices Implementation Index (BPPII) as a Productivity management tool will help the petrochemical plants to improve productivity in their projects and to be resilient during the pre-planning phase. This should also allow the petrochemical industry to attract more investments and remain competitive in order to be sustainable. The identification and analysis of practices related to maintenance activities, shutdowns, and turnarounds of petrochemical plants will significantly contribute to the body of knowledge on best productivity practice.

Suggested Citation

  • Pramesh Krishnankutty & Bon-Gang Hwang & Carlos H. Caldas & Sriya Muralidharan & Daniel P. de Oliveira, 2019. "Assessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants," Sustainability, MDPI, vol. 11(5), pages 1-27, February.
  • Handle: RePEc:gam:jsusta:v:11:y:2019:i:5:p:1239-:d:209251
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/11/5/1239/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/11/5/1239/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Nancy Kong & Jose Tongzon, 2006. "Estimating total factor productivity growth in Singapore at sectoral level using data envelopment analysis," Applied Economics, Taylor & Francis Journals, vol. 38(19), pages 2299-2314.
    2. Wen-der Yu & Shao-tsai Cheng & Wei-cheng Ho & Yu-hao Chang, 2018. "Measuring the Sustainability of Construction Projects throughout Their Lifecycle: A Taiwan Lesson," Sustainability, MDPI, vol. 10(5), pages 1-16, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ming Shan & Yu-Shan Li & Bon-Gang Hwang & Jia-En Chua, 2021. "Productivity Metrics and Its Implementations in Construction Projects: A Case Study of Singapore," Sustainability, MDPI, vol. 13(21), pages 1-19, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kwo-Wuu Wang & Yuan-Yu Hsu & Wen-der Yu & Shao-tsai Cheng, 2018. "Determination of Project Procurement Method with a Graphical Analytic Model," Sustainability, MDPI, vol. 10(10), pages 1-17, October.
    2. Azza El-Shinnawy, 2010. "Trends of Total Factor Productivity in Egypt’s Pharmaceutical Industry: Evidence from the Nonparametric Malmquist Index Approach," Working Papers 524, Economic Research Forum, revised 05 Jan 2010.
    3. Stefano Armenia & Rosa Maria Dangelico & Fabio Nonino & Alessandro Pompei, 2019. "Sustainable Project Management: A Conceptualization-Oriented Review and a Framework Proposal for Future Studies," Sustainability, MDPI, vol. 11(9), pages 1-16, May.
    4. Boon Lee, 2011. "Distribution Trade Sector Output and Productivity Performance: A Case Study of Singapore and Hong Kong 2001-2008," School of Economics and Finance Discussion Papers and Working Papers Series 270, School of Economics and Finance, Queensland University of Technology.
    5. Reza Kiani Mavi & Denise Gengatharen & Neda Kiani Mavi & Richard Hughes & Alistair Campbell & Ross Yates, 2021. "Sustainability in Construction Projects: A Systematic Literature Review," Sustainability, MDPI, vol. 13(4), pages 1-24, February.
    6. Fatima S. Al Shamsi & Hassan Aly & Mohamed El-Bassiouni, 2009. "Measuring and explaining the efficiencies of the United Arab Emirates banking system," Applied Economics, Taylor & Francis Journals, vol. 41(27), pages 3505-3519.
    7. Ricardo P. F. Ferrarez & Claudia G. B. do Valle & Jeferson C. Alvarenga & Fabricio da C. Dias & Diego A. Vasco & André L. A. Guedes & Christine K. Chinelli & Assed N. Haddad & Carlos A. P. Soares, 2023. "Key Practices for Incorporating Sustainability in Project Management from the Perspective of Brazilian Professionals," Sustainability, MDPI, vol. 15(11), pages 1-21, May.
    8. Zhenwen Liu & Hsi-Chi Yang & Yan-Chyuan Shiau, 2020. "Investigation on Evaluation Framework of Elementary School Teaching Materials for Sustainable Development," Sustainability, MDPI, vol. 12(9), pages 1-19, May.
    9. Nasanjargal Erdenekhuu & Balázs Kocsi & Domicián Máté, 2022. "A Risk-Based Analysis Approach to Sustainable Construction by Environmental Impacts," Energies, MDPI, vol. 15(18), pages 1-21, September.
    10. Boon L. Lee, 2013. "Productivity, technical and efficiency change in Singapore's services sector, 2005 to 2008," Applied Economics, Taylor & Francis Journals, vol. 45(15), pages 2023-2029, May.
    11. Chisomo Kapatsa & Neema Kavishe & Godwin Maro & Sam Zulu, 2023. "The Identification of Sustainability Assessment Indicators for Road Infrastructure Projects in Tanzania," Sustainability, MDPI, vol. 15(20), pages 1-15, October.
    12. Butković Lana Lovrenčić, 2021. "A new framework for ranking Critical Success Factors for International Construction Projects," Organization, Technology and Management in Construction, Sciendo, vol. 13(2), pages 2505-2520, July.
    13. Boon L Lee, 2012. "Efficiency and Productivity of Singapore's Manufacturing Sector 2001-2010: An analysis using Simar and Wilson's (2007) bootstrapped truncated approach," School of Economics and Finance Discussion Papers and Working Papers Series 283, School of Economics and Finance, Queensland University of Technology.
    14. Oluremi Ogun, 2015. "A Fundamental-based Approach to Productivity Growth," Atlantic Economic Journal, Springer;International Atlantic Economic Society, vol. 43(3), pages 383-392, September.
    15. Hongyang Li & Ruoyu Jin & Xin Ning & Martin Skitmore & Tianyao Zhang, 2018. "Prioritizing the Sustainability Objectives of Major Public Projects in the Guangdong–Hong Kong–Macao Greater Bay Area," Sustainability, MDPI, vol. 10(11), pages 1-23, November.
    16. Hossam E. Hosny & Ahmed H. Ibrahim & Elin A. Eldars, 2022. "Development of infrastructure projects sustainability assessment model," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 24(6), pages 7493-7531, June.
    17. Majed Alinizzi & Husnain Haider & Meshal Almoshaogeh & Fawaz Alharbi & Saleh M. Alogla & Gamal A. Al-Saadi, 2020. "Sustainability Assessment of Construction Technologies for Large Pipelines on Urban Highways: Scenario Analysis using Fuzzy QFD," Sustainability, MDPI, vol. 12(7), pages 1-20, March.
    18. Perry C. Y. Liu & Huai-Wei Lo & James J. H. Liou, 2020. "A Combination of DEMATEL and BWM-Based ANP Methods for Exploring the Green Building Rating System in Taiwan," Sustainability, MDPI, vol. 12(8), pages 1-19, April.
    19. Jinhua Sun & Decai Tang & Haojia Kong & Valentina Boamah, 2022. "Impact of Industrial Structure Upgrading on Green Total Factor Productivity in the Yangtze River Economic Belt," IJERPH, MDPI, vol. 19(6), pages 1-15, March.
    20. Sandro Rondinella & Damiano B. Silipo, 2023. "The effects of chronic migraine on labour productivity: Evidence from Italy," LABOUR, CEIS, vol. 37(1), pages 1-32, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:11:y:2019:i:5:p:1239-:d:209251. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.