IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v10y2018i9p3046-d166075.html
   My bibliography  Save this article

Evaluating Supplier Management Maturity in Prefabricated Construction Project-Survey Analysis in China

Author

Listed:
  • Kangning Liu

    (School of Civil Engineering, Harbin Institute of Technology, Harbin 150001, China)

  • Yikun Su

    (School of Civil Engineering, Northeast Forestry University, Harbin 150040, China)

  • Shoujian Zhang

    (School of Civil Engineering, Harbin Institute of Technology, Harbin 150001, China)

Abstract

Prefabrication is considered as a modern method of construction, transferring part of on-site work into factories and generating a new decoupling point in supply chain. Management of prefabricated component (PC) suppliers plays a key role in the performance of prefabricated construction project (PCP). Evaluating and improving supplier management maturity (SMM) become critical issues for large contractors. Previous research on PCP supply chain mainly focused on technology, process and performance aspects, while paying little attention to supplier relationship management. This study proposes an assessment criteria system of supplier management from five dimensions, including procurement process, operation efficiency, relationship coordination and strategy alignment and corporate social responsibility. A maturity grid with five levels is designed to present continuous improvement of supplier management. 34 large PCP construction firms listed in contractor directory were investigated in China through semi-structured interview and questionnaire survey. Independent two-samples t -test and one-way analysis of variance were adopted to explore SMM of different groups according to business scope, procurement method and construction experience. The results indicate that the overall maturity level of supplier management is relatively low, implying that supply activity cannot achieve inter-organization integration. Management on relationship coordination and strategy alignment lag behind procurement management and operation efficiency. Single business contractors have higher SMM than diversified ones. Contractors integrated in engineering, procurement and construction are superior to design-bid-build contractors in supplier management, especially in relationship coordination and strategic alignment. Construction experience is conductive to supplier operation efficiency. Noticeably, there are no statistically significant differences in the performance of corporate social responsibility among different groups. These results will contribute to developing a benchmark framework for contractors to evaluate SMM and achieve continuous improvements in PCP.

Suggested Citation

  • Kangning Liu & Yikun Su & Shoujian Zhang, 2018. "Evaluating Supplier Management Maturity in Prefabricated Construction Project-Survey Analysis in China," Sustainability, MDPI, vol. 10(9), pages 1-21, August.
  • Handle: RePEc:gam:jsusta:v:10:y:2018:i:9:p:3046-:d:166075
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/10/9/3046/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/10/9/3046/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Benjamin S. Stroebele & Andreas J. Kiessling, 2017. "Impact Analysis of Complexity Drivers in the Supply Chain of Prefabricated Houses," Journal of Management and Strategy, Journal of Management and Strategy, Sciedu Press, vol. 8(1), pages 1-9, February.
    2. Lara Jaillon & C. S. Poon, 2008. "Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study," Construction Management and Economics, Taylor & Francis Journals, vol. 26(9), pages 953-966.
    3. Mohamed Naim & James Barlow, 2003. "An innovative supply chain strategy for customized housing," Construction Management and Economics, Taylor & Francis Journals, vol. 21(6), pages 593-602.
    4. Elisabete Correia & Helena Carvalho & Susana G. Azevedo & Kannan Govindan, 2017. "Maturity Models in Supply Chain Sustainability: A Systematic Literature Review," Sustainability, MDPI, vol. 9(1), pages 1-26, January.
    5. Sonja Petrovic-Lazarevic, 2008. "The development of corporate social responsibility in the Australian construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 26(2), pages 93-101.
    6. Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2017. "Factors Affecting the Capital Cost of Prefabrication—A Case Study of China," Sustainability, MDPI, vol. 9(9), pages 1-22, August.
    7. Yanhu Han & Miroslaw J. Skibniewski & Lufan Wang, 2017. "A Market Equilibrium Supply Chain Model for Supporting Self-Manufacturing or Outsourcing Decisions in Prefabricated Construction," Sustainability, MDPI, vol. 9(11), pages 1-18, November.
    8. Xiaolin Zhai & Richard Reed & Anthony Mills, 2014. "Factors impeding the offsite production of housing construction in China: an investigation of current practice," Construction Management and Economics, Taylor & Francis Journals, vol. 32(1-2), pages 40-52, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ayodeji Emmanuel Oke & Ahmed Farouk Kineber & Mohamed Elseknidy & Fakunle Samuel Kayode, 2023. "Radio frequency identification implementation model for sustainable development: A structural equation modeling approach," Sustainable Development, John Wiley & Sons, Ltd., vol. 31(3), pages 1824-1844, June.
    2. Marco Scherz & Bernd Markus Zunk & Christian Steinmann & Helmuth Kreiner, 2022. "How to Assess Sustainable Planning Processes of Buildings? A Maturity Assessment Model Approach for Designers," Sustainability, MDPI, vol. 14(5), pages 1-24, March.
    3. Muhammad Abdul Karim & Tze San Ong & Sin Huei Ng & Haslinah Muhammad & Noor Azman Ali, 2022. "Organizational Aspects and Practices for Enhancing Organizational Project Management Maturity," Sustainability, MDPI, vol. 14(9), pages 1-21, April.
    4. Zezhou Wu & Lirong Luo & Heng Li & Ying Wang & Guoqiang Bi & Maxwell Fordjour Antwi-Afari, 2021. "An Analysis on Promoting Prefabrication Implementation in Construction Industry towards Sustainability," IJERPH, MDPI, vol. 18(21), pages 1-21, October.
    5. James Amere OWICH & Jackline Akoth ODERO, 2023. "Supplier Selection Practices And Supply Chain Performance Of County Referral Hospitals In Kenya," Business Excellence and Management, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 13(3), pages 5-17, September.
    6. Yang Liu & Jianjun Dong & Ling Shen, 2020. "A Conceptual Development Framework for Prefabricated Construction Supply Chain Management: An Integrated Overview," Sustainability, MDPI, vol. 12(5), pages 1-29, March.
    7. Clyde Zhengdao Li & Mingcong Hu & Bing Xiao & Zhe Chen & Vivian W. Y. Tam & Yiyu Zhao, 2021. "Mapping the Knowledge Domains of Emerging Advanced Technologies in the Management of Prefabricated Construction," Sustainability, MDPI, vol. 13(16), pages 1-31, August.
    8. Yasser Yahya Al-Ashmori & Idris Othman & Al-Hussein M. H. Al-Aidrous, 2022. "“Values, Challenges, and Critical Success Factors” of Building Information Modelling (BIM) in Malaysia: Experts Perspective," Sustainability, MDPI, vol. 14(6), pages 1-18, March.
    9. Guangbin Wang & Huan Liu & Heng Li & Xiaochun Luo & Jiaxi Liu, 2020. "A Building Project-Based Industrialized Construction Maturity Model Involving Organizational Enablers: A Multi-Case Study in China," Sustainability, MDPI, vol. 12(10), pages 1-35, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pei Dang & Zhanwen Niu & Shang Gao & Lei Hou & Guomin Zhang, 2020. "Critical Factors Influencing the Sustainable Construction Capability in Prefabrication of Chinese Construction Enterprises," Sustainability, MDPI, vol. 12(21), pages 1-21, October.
    2. Pero, Margherita & Stößlein, Martin & Cigolini, Roberto, 2015. "Linking product modularity to supply chain integration in the construction and shipbuilding industries," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 602-615.
    3. Lei Jiang & Zhongfu Li & Long Li & Yunli Gao, 2018. "Constraints on the Promotion of Prefabricated Construction in China," Sustainability, MDPI, vol. 10(7), pages 1, July.
    4. Kaicheng Shen & Chen Cheng & Xiaodong Li & Zhihui Zhang, 2019. "Environmental Cost-Benefit Analysis of Prefabricated Public Housing in Beijing," Sustainability, MDPI, vol. 11(1), pages 1-21, January.
    5. Yu, Sisi & Liu, Yanfeng & Wang, Dengjia & Bahaj, AbuBakr S. & Wu, Yue & Liu, Jiaping, 2021. "Review of thermal and environmental performance of prefabricated buildings: Implications to emission reductions in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 137(C).
    6. Qianqian Shi & Jianbo Zhu & Marcel Hertogh & Zhaohan Sheng, 2018. "Incentive Mechanism of Prefabrication in Mega Projects with Reputational Concerns," Sustainability, MDPI, vol. 10(4), pages 1-16, April.
    7. Yang Liu & Jianjun Dong & Ling Shen, 2020. "A Conceptual Development Framework for Prefabricated Construction Supply Chain Management: An Integrated Overview," Sustainability, MDPI, vol. 12(5), pages 1-29, March.
    8. Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2018. "Capital Cost Optimization for Prefabrication: A Factor Analysis Evaluation Model," Sustainability, MDPI, vol. 10(1), pages 1-22, January.
    9. Ke Zhang & Jiin-Song Tsai, 2021. "Identification of Critical Factors Influencing Prefabricated Construction Quality and Their Mutual Relationship," Sustainability, MDPI, vol. 13(19), pages 1-21, October.
    10. Weiping Jiang & Lirong Luo & Zezhou Wu & Jianbo Fei & Maxwell Fordjour Antwi-Afari & Tao Yu, 2019. "An Investigation of the Effectiveness of Prefabrication Incentive Policies in China," Sustainability, MDPI, vol. 11(19), pages 1-24, September.
    11. Kazemi, Maha Zadeh & Elamer, Ahmed A. & Theodosopoulos, Grigorios & Khatib, Saleh F.A., 2023. "Reinvigorating research on sustainability reporting in the construction industry: A systematic review and future research agenda," Journal of Business Research, Elsevier, vol. 167(C).
    12. Jingyuan Shi & Jiaqing Sun, 2023. "Prefabrication Implementation Potential Evaluation in Rural Housing Based on Entropy Weighted TOPSIS Model: A Case Study of Counties in Chongqing, China," Sustainability, MDPI, vol. 15(6), pages 1-18, March.
    13. Lei Jiang & Zhongfu Li & Long Li & Tiankun Li & Yunli Gao, 2018. "A Framework of Industrialized Building Assessment in China Based on the Structural Equation Model," IJERPH, MDPI, vol. 15(8), pages 1-20, August.
    14. Zezhou Wu & Lirong Luo & Heng Li & Ying Wang & Guoqiang Bi & Maxwell Fordjour Antwi-Afari, 2021. "An Analysis on Promoting Prefabrication Implementation in Construction Industry towards Sustainability," IJERPH, MDPI, vol. 18(21), pages 1-21, October.
    15. Paulina Golinska-Dawson & Karolina Werner-Lewandowska & Monika Kosacka-Olejnik, 2021. "Responsible Resource Management in Remanufacturing—Framework for Qualitative Assessment in Small and Medium-Sized Enterprises," Resources, MDPI, vol. 10(2), pages 1-17, February.
    16. Ravijanya Chippagiri & Hindavi R. Gavali & Rahul V. Ralegaonkar & Mike Riley & Andy Shaw & Ana Bras, 2021. "Application of Sustainable Prefabricated Wall Technology for Energy Efficient Social Housing," Sustainability, MDPI, vol. 13(3), pages 1-12, January.
    17. Inês A. Ferreira & Radu Godina & Helena Carvalho, 2020. "Waste Valorization through Additive Manufacturing in an Industrial Symbiosis Setting," Sustainability, MDPI, vol. 13(1), pages 1-21, December.
    18. Renata Kučerová & Tomáš Dania & Renata Skýpalová & Veronika Blašková, 2018. "Construction Industry in the Czech Republic: the Level of Involvement in Corporate Social Responsibility," Acta Universitatis Agriculturae et Silviculturae Mendelianae Brunensis, Mendel University Press, vol. 66(2), pages 531-541.
    19. Seungho Kim & Dong-Eun Lee & Yonggu Kim & Sangyong Kim, 2020. "Development and Application of Precast Concrete Double Wall System to Improve Productivity of Retaining Wall Construction," Sustainability, MDPI, vol. 12(8), pages 1-12, April.
    20. Naim, Mohamed M. & Gosling, Jonathan, 2011. "On leanness, agility and leagile supply chains," International Journal of Production Economics, Elsevier, vol. 131(1), pages 342-354, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:9:p:3046-:d:166075. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.