IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v10y2022i19p3417-d919743.html
   My bibliography  Save this article

Multi-AGV Flexible Manufacturing Cell Scheduling Considering Charging

Author

Listed:
  • Jianxun Li

    (School of Economics and Management, Xi’an University of Technology, Xi’an 710048, China)

  • Wenjie Cheng

    (School of Economics and Management, Xi’an University of Technology, Xi’an 710048, China)

  • Kin Keung Lai

    (International Business School, Shaanxi Normal University, Xi’an 710048, China)

  • Bhagwat Ram

    (Centre for Digital Transformation, Indian Institute of Management Ahmedabad, Vastrapur 380015, India)

Abstract

Because of their flexibility, controllability and convenience, Automated Guided Vehicles (AGV) have gradually gained popularity in intelligent manufacturing because to their adaptability, controllability, and simplicity. We examine the relationship between AGV scheduling tasks, charging thresholds, and power consumption, in order to address the issue of how AGV charging affects the scheduling of flexible manufacturing units with multiple AGVs. Aiming to promote AGVs load balance and reduce AGV charging times while meeting customer demands, we establish a scheduling model with the objective of minimizing the maximum completion time based on process sequence limitations, processing time restrictions, and workpiece transportation constraints. In accordance with the model’s characteristics, we code the machine, workpiece, and AGV independently, solve the model using a genetic algorithm, adjust the crossover mutation operator, and incorporate an elite retention strategy to the population initialization process to improve genetic diversity. Calculation examples are used to examine the marginal utility of the number of AGVs and electricity and validate the efficiency and viability of the scheduling model. The results show that the AVGs are effectively scheduled to complete transportation tasks and reduce the charging wait time. The multi-AGV flexible manufacturing cell scheduling can also help decision makers to seek AGVs load balance by simulation, reduce the charging times, and decrease the final completion time of manufacturing unit. In addition, AGV utilization can be maximized when the fleet size of AGV is 20%-40% of the number of workpieces.

Suggested Citation

  • Jianxun Li & Wenjie Cheng & Kin Keung Lai & Bhagwat Ram, 2022. "Multi-AGV Flexible Manufacturing Cell Scheduling Considering Charging," Mathematics, MDPI, vol. 10(19), pages 1-15, September.
  • Handle: RePEc:gam:jmathe:v:10:y:2022:i:19:p:3417-:d:919743
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/10/19/3417/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/10/19/3417/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Lacomme, Philippe & Larabi, Mohand & Tchernev, Nikolay, 2013. "Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles," International Journal of Production Economics, Elsevier, vol. 143(1), pages 24-34.
    2. Ümit Bilge & Gündüz Ulusoy, 1995. "A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS," Operations Research, INFORMS, vol. 43(6), pages 1058-1070, December.
    3. Dalila B. M. M. Fontes & Seyed Mahdi Homayouni, 2019. "Joint production and transportation scheduling in flexible manufacturing systems," Journal of Global Optimization, Springer, vol. 74(4), pages 879-908, August.
    4. Maryam Mousavi & Hwa Jen Yap & Siti Nurmaya Musa & Farzad Tahriri & Siti Zawiah Md Dawal, 2017. "Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization," PLOS ONE, Public Library of Science, vol. 12(3), pages 1-24, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yuan Gao & Qian Zhang & Chun Kit Lau & Bhagwat Ram, 2022. "Robust Appointment Scheduling in Healthcare," Mathematics, MDPI, vol. 10(22), pages 1-15, November.
    2. Zhuoling Jiang & Xiaodong Zhang & Pei Wang, 2023. "Grid-Map-Based Path Planning and Task Assignment for Multi-Type AGVs in a Distribution Warehouse," Mathematics, MDPI, vol. 11(13), pages 1-20, June.
    3. Maoyun Zhang & Yuheng Jiang & Chuan Wan & Chen Tang & Boyan Chen & Huizhuang Xi, 2023. "Design of an Intelligent Shop Scheduling System Based on Internet of Things," Energies, MDPI, vol. 16(17), pages 1-13, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Moussa Abderrahim & Abdelghani Bekrar & Damien Trentesaux & Nassima Aissani & Karim Bouamrane, 2020. "Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints," Energies, MDPI, vol. 13(18), pages 1-19, September.
    2. Fontes, Dalila B.M.M. & Homayouni, S. Mahdi & Gonçalves, José F., 2023. "A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources," European Journal of Operational Research, Elsevier, vol. 306(3), pages 1140-1157.
    3. Dalila B. M. M. Fontes & Seyed Mahdi Homayouni, 2019. "Joint production and transportation scheduling in flexible manufacturing systems," Journal of Global Optimization, Springer, vol. 74(4), pages 879-908, August.
    4. James T. Lin & Chun-Chih Chiu & Edward Huang & Hung-Ming Chen, 2018. "A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(01), pages 1-20, February.
    5. Arash Amirteimoori & Reza Kia, 2023. "Concurrent scheduling of jobs and AGVs in a flexible job shop system: a parallel hybrid PSO-GA meta-heuristic," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 727-753, September.
    6. James T. Lin & Chun-Chih Chiu & Yu-Hsiang Chang, 2019. "Simulation-based optimization approach for simultaneous scheduling of vehicles and machines with processing time uncertainty in FMS," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 104-141, March.
    7. Quang-Vinh Dang & Cong Thanh Nguyen & Hana Rudová, 2019. "Scheduling of mobile robots for transportation and manufacturing tasks," Journal of Heuristics, Springer, vol. 25(2), pages 175-213, April.
    8. Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
    9. Olatunde T. Baruwa & Miquel A. Piera, 2016. "A coloured Petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4773-4792, August.
    10. Wenxiang Xu & Shunsheng Guo, 2019. "A Multi-Objective and Multi-Dimensional Optimization Scheduling Method Using a Hybrid Evolutionary Algorithms with a Sectional Encoding Mode," Sustainability, MDPI, vol. 11(5), pages 1-24, March.
    11. Andy Ham, 2020. "Transfer-robot task scheduling in flexible job shop," Journal of Intelligent Manufacturing, Springer, vol. 31(7), pages 1783-1793, October.
    12. Berterottière, Lucas & Dauzère-Pérès, Stéphane & Yugma, Claude, 2024. "Flexible job-shop scheduling with transportation resources," European Journal of Operational Research, Elsevier, vol. 312(3), pages 890-909.
    13. Seyed Mahdi Homayouni & Dalila B. M. M. Fontes, 2021. "Production and transport scheduling in flexible job shop manufacturing systems," Journal of Global Optimization, Springer, vol. 79(2), pages 463-502, February.
    14. Dalila B. M. M. Fontes & S. Mahdi Homayouni & Mauricio G. C. Resende, 2022. "Job-shop scheduling-joint consideration of production, transport, and storage/retrieval systems," Journal of Combinatorial Optimization, Springer, vol. 44(2), pages 1284-1322, September.
    15. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
    16. Philippe Lacomme & Aziz Moukrim & Alain Quilliot & Marina Vinot, 2019. "Integration of routing into a resource-constrained project scheduling problem," EURO Journal on Computational Optimization, Springer;EURO - The Association of European Operational Research Societies, vol. 7(4), pages 421-464, December.
    17. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.
    18. Le-Anh, T. & de Koster, M.B.M., 2004. "A Review Of Design And Control Of Automated Guided Vehicle Systems," ERIM Report Series Research in Management ERS;2004-030-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    19. Cai, Wei & Wang, Lianguo & Li, Li & Xie, Jun & Jia, Shun & Zhang, Xugang & Jiang, Zhigang & Lai, Kee-hung, 2022. "A review on methods of energy performance improvement towards sustainable manufacturing from perspectives of energy monitoring, evaluation, optimization and benchmarking," Renewable and Sustainable Energy Reviews, Elsevier, vol. 159(C).
    20. Sunil Prayagi & Padma Lalitha Mareddy & Lakshmi Narasimhamu Katta & Sivarami Reddy Narapureddy, 2023. "Optimum Scheduling of a Multi-Machine Flexible Manufacturing System Considering Job and Tool Transfer Times without Tool Delay," Mathematics, MDPI, vol. 11(19), pages 1-37, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:10:y:2022:i:19:p:3417-:d:919743. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.