Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
- James D. Abbey & Margaret G. Meloy & V. Daniel R. Guide Jr. & Selin Atalay, 2015. "Remanufactured Products in Closed-Loop Supply Chains for Consumer Goods," Production and Operations Management, Production and Operations Management Society, vol. 24(3), pages 488-503, March.
- Chen, Wenyi & Kucukyazici, Beste & Verter, Vedat & Jesús Sáenz, María, 2015. "Supply chain design for unlocking the value of remanufacturing under uncertainty," European Journal of Operational Research, Elsevier, vol. 247(3), pages 804-819.
- D-H Lee & P Xirouchakis, 2004. "A two-stage heuristic for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 287-297, March.
- Sgarbossa, Fabio & Russo, Ivan, 2017. "A proactive model in sustainable food supply chain: Insight from a case study," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 596-606.
- Wang, Wenyuan & Wang, Yue & Mo, Daniel & Tseng, Mitchell M., 2017. "Managing component reuse in remanufacturing under product diffusion dynamics," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 551-560.
- Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
- Moore, Kendra E. & Gungor, Askiner & Gupta, Surendra M., 2001. "Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships," European Journal of Operational Research, Elsevier, vol. 135(2), pages 428-449, December.
- Jeihoonian, Mohammad & Kazemi Zanjani, Masoumeh & Gendreau, Michel, 2016. "Accelerating Benders decomposition for closed-loop supply chain network design: Case of used durable products with different quality levels," European Journal of Operational Research, Elsevier, vol. 251(3), pages 830-845.
- Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
- Das, Kanchan & Rao Posinasetti, Nageswara, 2015. "Addressing environmental concerns in closed loop supply chain design and planning," International Journal of Production Economics, Elsevier, vol. 163(C), pages 34-47.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mohsen Tehrani & Surendra M. Gupta, 2021. "Designing a Sustainable Green Closed-Loop Supply Chain under Uncertainty and Various Capacity Levels," Logistics, MDPI, vol. 5(2), pages 1-31, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
- Zhang, Yanzi & Berenguer, Gemma & Zhang, Zhi-Hai, 2024. "A subsidized reverse supply chain in the Chinese electronics industry," Omega, Elsevier, vol. 122(C).
- Gong, Hailei & Zhang, Zhi-Hai, 2022. "Benders decomposition for the distributionally robust optimization of pricing and reverse logistics network design in remanufacturing systems," European Journal of Operational Research, Elsevier, vol. 297(2), pages 496-510.
- Van Engeland, Jens & Beliën, Jeroen & De Boeck, Liesje & De Jaeger, Simon, 2020. "Literature review: Strategic network optimization models in waste reverse supply chains," Omega, Elsevier, vol. 91(C).
- Xu, Xun & Zeng, Shuo & He, Yuanjie, 2017. "The influence of e-services on customer online purchasing behavior toward remanufactured products," International Journal of Production Economics, Elsevier, vol. 187(C), pages 113-125.
- Patricia van Loon & Luk N. Van Wassenhove & Ales Mihelic, 2022. "Designing a circular business strategy: 7 years of evolution at a large washing machine manufacturer," Business Strategy and the Environment, Wiley Blackwell, vol. 31(3), pages 1030-1041, March.
- Ramani, Vinay & De Giovanni, Pietro, 2017. "A two-period model of product cannibalization in an atypical Closed-loop Supply Chain with endogenous returns: The case of DellReconnect," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1009-1027.
- Zhang, Abraham & Wang, Jason X. & Farooque, Muhammad & Wang, Yulan & Choi, Tsan-Ming, 2021. "Multi-dimensional circular supply chain management: A comparative review of the state-of-the-art practices and research," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 155(C).
- Zhang, Yanzi & Diabat, Ali & Zhang, Zhi-Hai, 2021. "Reliable closed-loop supply chain design problem under facility-type-dependent probabilistic disruptions," Transportation Research Part B: Methodological, Elsevier, vol. 146(C), pages 180-209.
- Liangchuan Zhou & Surendra M. Gupta, 2019. "A Pricing and Acquisition Strategy for New and Remanufactured High-Technology Products," Logistics, MDPI, vol. 3(1), pages 1-26, February.
- Tong Shu & Qian Liu & Shou Chen & Shouyang Wang & Kin Keung Lai, 2018. "Pricing Decisions of CSR Closed-Loop Supply Chains with Carbon Emission Constraints," Sustainability, MDPI, vol. 10(12), pages 1-25, November.
- Xiaojiao Qiao & Xiukun Zhao & Jinhui Zou, 2021. "Remanufacturing Marketing Decisions in the Presence of Retailing Platforms in the Carbon Neutrality Era," IJERPH, MDPI, vol. 19(1), pages 1-18, December.
- Cheng-Han Wu, 2021. "Production-quality policy for a make-from-stock remanufacturing system," Flexible Services and Manufacturing Journal, Springer, vol. 33(2), pages 425-456, June.
- Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
- Gan, Shu-San & Pujawan, I. Nyoman & Suparno, & Widodo, Basuki, 2017. "Pricing decision for new and remanufactured product in a closed-loop supply chain with separate sales-channel," International Journal of Production Economics, Elsevier, vol. 190(C), pages 120-132.
- Abdul Salam Khan & Catalin Iulian Pruncu & Razaullah Khan & Khawar Naeem & Abdul Ghaffar & Pakeeza Ashraf & Shah Room, 2020. "A Trade-off Analysis of Economic and Environmental Aspects of a Disruption Based Closed-Loop Supply Chain Network," Sustainability, MDPI, vol. 12(17), pages 1-28, August.
- Alessio Ishizaka & Sharfuddin Ahmed Khan & Siamak Kheybari & Syed Imran Zaman, 2023. "Supplier selection in closed loop pharma supply chain: a novel BWM–GAIA framework," Annals of Operations Research, Springer, vol. 324(1), pages 13-36, May.
- He, Yuanjie, 2017. "Supply risk sharing in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 39-52.
- Lucas Dias Condeixa & Pierry Silva & Diego Moah & Brenda Farias & Adriana Leiras, 2022. "Evaluating cost impacts on reverse logistics using an Economic Order Quantity (EOQ) model with environmental and social considerations," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(3), pages 921-940, September.
- Caiquan Duan & Guoyi Xiu & Fengmin Yao, 2019. "Multi-Period E-Closed-Loop Supply Chain Network Considering Consumers’ Preference for Products and AI-Push," Sustainability, MDPI, vol. 11(17), pages 1-32, August.
More about this item
Keywords
closed-loop supply chain; maintenance; sensor embedded product; remanufacturing; disassembly;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jlogis:v:2:y:2018:i:1:p:3-:d:125841. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.