Optimizing the bidding strategy and assessing profitability of over-install renewable plants equipped with battery energy storage systems
Author
Abstract
Suggested Citation
DOI: 10.1016/j.renene.2024.121247
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
More about this item
Keywords
Battery degradation; Bidding strategy; Capacity-constrained RES sites; Overplanted hybrid RES sites; Photovoltaic power plants; Wind power plants;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:renene:v:234:y:2024:i:c:s0960148124013156. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/renewable-energy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.