Exhaustive simulation approach for severe accident risk in nuclear power plants: OPR-1000 full-power internal events
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2022.108580
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Queral, C. & Gómez-Magán, J. & ParÃs, C. & Rivas-Lewicky, J. & Sánchez-Perea, M. & Gil, J. & Mula, J. & Meléndez, E. & Hortal, J. & Izquierdo, J.M. & Fernández, I., 2018. "Dynamic event trees without success criteria for full spectrum LOCA sequences applying the integrated safety assessment (ISA) methodology," Reliability Engineering and System Safety, Elsevier, vol. 171(C), pages 152-168.
- Guo, Zehua & Dailey, Ryan & Feng, Tangtao & Zhou, Yukun & Sun, Zhongning & Corradini, Michael L & Wang, Jun, 2021. "Uncertainty analysis of ATF Cr-coated-Zircaloy on BWR in-vessel accident progression during a station blackout," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- Dvorzhak, Alla & Mora, Juan C. & Robles, Beatriz, 2016. "Probabilistic risk assessment from potential exposures to the public applied for innovative nuclear installations," Reliability Engineering and System Safety, Elsevier, vol. 152(C), pages 176-186.
- Stanley Kaplan & B. John Garrick, 1981. "On The Quantitative Definition of Risk," Risk Analysis, John Wiley & Sons, vol. 1(1), pages 11-27, March.
- Zheng, Xiaoyu & Itoh, Hiroto & Kawaguchi, Kenji & Tamaki, Hitoshi & Maruyama, Yu, 2015. "Application of Bayesian nonparametric models to the uncertainty and sensitivity analysis of source term in a BWR severe accident," Reliability Engineering and System Safety, Elsevier, vol. 138(C), pages 253-262.
- Francesco, Di Maio & Matteo, Fumagalli & Carlo, Guerini & Federico, Perotti & Enrico, Zio, 2021. "Time-dependent reliability analysis of the reactor building of a nuclear power plant for accounting of its aging and degradation," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Cho, Jaehyun & Han, Sang Hoon, 2021. "Identification of Risk-Significant Components in Nuclear Power Plants to Reduce Cs-137 Radioactive Risk," Reliability Engineering and System Safety, Elsevier, vol. 211(C).
- Song, Wonjong & Park, Sunghyun & Seo, Yein & Jae, Moosung, 2020. "A source term binning methodology for multi-unit consequence analyses," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
- Rebollo, M.J. & Queral, C. & Jimenez, G. & Gomez-Magan, J. & Meléndez, E. & Sanchez-Perea, M., 2016. "Evaluation of the offsite dose contribution to the global risk in a Steam Generator Tube Rupture scenario," Reliability Engineering and System Safety, Elsevier, vol. 147(C), pages 32-48.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Li, Xinbo & Gong, Jinxin, 2024. "Probabilistic evaluation of the leak-tightness function of the nuclear containment structure subjected to internal pressure," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- Mazgaj, Piotr & Darnowski, Piotr & Kaszko, Aleksej & Hortal, Javier & Dusic, Milorad & Mendizábal, Rafael & Pelayo, Fernando, 2022. "Demonstration of the E-BEPU methodology for SL-LOCA in a Gen-III PWR reactor," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Hamza, Mostafa & Joslin, Nick & Lawson, Glen & McSweeney, Luke & Liao, Huafei & Vivanco, Alaina & Diaconeasa, Mihai A., 2024. "Identifying and quantifying a complete set of full-power initiating events during early design stages of high-temperature gas-cooled reactors," Reliability Engineering and System Safety, Elsevier, vol. 242(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zheng, Xiaoyu & Tamaki, Hitoshi & Sugiyama, Tomoyuki & Maruyama, Yu, 2022. "Dynamic probabilistic risk assessment of nuclear power plants using multi-fidelity simulations," Reliability Engineering and System Safety, Elsevier, vol. 223(C).
- Zhou, Taotao & Modarres, Mohammad & Droguett, Enrique López, 2021. "Multi-unit nuclear power plant probabilistic risk assessment: A comprehensive survey," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- ParÃs, C. & Queral, C. & Mula, J. & Gómez-Magán, J. & Sánchez-Perea, M. & Meléndez, E. & Gil, J., 2019. "Quantitative risk reduction by means of recovery strategies," Reliability Engineering and System Safety, Elsevier, vol. 182(C), pages 13-32.
- Hamza, Mostafa & Joslin, Nick & Lawson, Glen & McSweeney, Luke & Liao, Huafei & Vivanco, Alaina & Diaconeasa, Mihai A., 2024. "Identifying and quantifying a complete set of full-power initiating events during early design stages of high-temperature gas-cooled reactors," Reliability Engineering and System Safety, Elsevier, vol. 242(C).
- Cho, Jaehyun & Lee, Sang Hun & Kim, Jaewhan & Park, Seong Kyu, 2022. "Framework to model severe accident management guidelines into Level 2 probabilistic safety assessment of a nuclear power plant," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
- S. Cucurachi & E. Borgonovo & R. Heijungs, 2016. "A Protocol for the Global Sensitivity Analysis of Impact Assessment Models in Life Cycle Assessment," Risk Analysis, John Wiley & Sons, vol. 36(2), pages 357-377, February.
- Chen, Fuzhong & Hsu, Chien-Lung & Lin, Arthur J. & Li, Haifeng, 2020. "Holding risky financial assets and subjective wellbeing: Empirical evidence from China," The North American Journal of Economics and Finance, Elsevier, vol. 54(C).
- Niël Almero Krüger & Natanya Meyer, 2021. "The Development of a Small and Medium-Sized Business Risk Management Intervention Tool," JRFM, MDPI, vol. 14(7), pages 1-14, July.
- Johnson, Caroline A. & Flage, Roger & Guikema, Seth D., 2021. "Feasibility study of PRA for critical infrastructure risk analysis," Reliability Engineering and System Safety, Elsevier, vol. 212(C).
- Kasai, Naoya & Matsuhashi, Shigemi & Sekine, Kazuyoshi, 2013. "Accident occurrence model for the risk analysis of industrialfacilities," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 71-74.
- J. C. Helton & F. J. Davis, 2002. "Illustration of Sampling‐Based Methods for Uncertainty and Sensitivity Analysis," Risk Analysis, John Wiley & Sons, vol. 22(3), pages 591-622, June.
- Michael Greenberg & Paul Lioy & Birnur Ozbas & Nancy Mantell & Sastry Isukapalli & Michael Lahr & Tayfur Altiok & Joseph Bober & Clifton Lacy & Karen Lowrie & Henry Mayer & Jennifer Rovito, 2013. "Passenger Rail Security, Planning, and Resilience: Application of Network, Plume, and Economic Simulation Models as Decision Support Tools," Risk Analysis, John Wiley & Sons, vol. 33(11), pages 1969-1986, November.
- Guo, Zehua & Dailey, Ryan & Feng, Tangtao & Zhou, Yukun & Sun, Zhongning & Corradini, Michael L & Wang, Jun, 2021. "Uncertainty analysis of ATF Cr-coated-Zircaloy on BWR in-vessel accident progression during a station blackout," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- Felipe Aguirre & Mohamed Sallak & Walter Schön & Fabien Belmonte, 2013. "Application of evidential networks in quantitative analysis of railway accidents," Journal of Risk and Reliability, , vol. 227(4), pages 368-384, August.
- Yacov Y. Haimes, 2012. "Systems‐Based Guiding Principles for Risk Modeling, Planning, Assessment, Management, and Communication," Risk Analysis, John Wiley & Sons, vol. 32(9), pages 1451-1467, September.
- Zio, E., 2018. "The future of risk assessment," Reliability Engineering and System Safety, Elsevier, vol. 177(C), pages 176-190.
- Julie E. Shortridge & Benjamin F. Zaitchik, 2018. "Characterizing climate change risks by linking robust decision frameworks and uncertain probabilistic projections," Climatic Change, Springer, vol. 151(3), pages 525-539, December.
- Piotr Darnowski & Piotr Mazgaj & Mateusz Włostowski, 2021. "Uncertainty and Sensitivity Analysis of the In-Vessel Hydrogen Generation for Gen-III PWR and Phebus FPT-1 with MELCOR 2.2," Energies, MDPI, vol. 14(16), pages 1-28, August.
- Yacov Y. Haimes, 2006. "On the Definition of Vulnerabilities in Measuring Risks to Infrastructures," Risk Analysis, John Wiley & Sons, vol. 26(2), pages 293-296, April.
- Angelo Panno & Annalisa Theodorou & Giuseppe Alessio Carbone & Evelina De Longis & Chiara Massullo & Gianluca Cepale & Giuseppe Carrus & Claudio Imperatori & Giovanni Sanesi, 2021. "Go Greener, Less Risk: Access to Nature Is Associated with Lower Risk Taking in Different Domains during the COVID-19 Lockdown," Sustainability, MDPI, vol. 13(19), pages 1-17, September.
More about this item
Keywords
Exhaustive simulation; Level 2 PSA; LERF; Cs-137; Severe accident scenarios; Containment event tree; OPR-1000; MAAP5;All these keywords.
JEL classification:
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:225:y:2022:i:c:s0951832022002265. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.