Establishment of the optimal time interval between periodic inspections for redundant systems
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2014.06.021
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Montoro-Cazorla, Delia & Pérez-Ocón, Rafael, 2006. "A deteriorating two-system with two repair modes and sojourn times phase-type distributed," Reliability Engineering and System Safety, Elsevier, vol. 91(1), pages 1-9.
- de Castro, Hélio Fiori & Cavalca, Katia Lucchesi, 2006. "Maintenance resources optimization applied to a manufacturing system," Reliability Engineering and System Safety, Elsevier, vol. 91(4), pages 413-420.
- Nourelfath, Mustapha & Châtelet, Eric & Nahas, Nabil, 2012. "Joint redundancy and imperfect preventive maintenance optimization for series–parallel multi-state degraded systems," Reliability Engineering and System Safety, Elsevier, vol. 103(C), pages 51-60.
- Taghipour, Sharareh & Banjevic, Dragan & Jardine, Andrew K.S., 2010. "Periodic inspection optimization model for a complex repairable system," Reliability Engineering and System Safety, Elsevier, vol. 95(9), pages 944-952.
- Zequeira, R.I. & Bérenguer, C., 2006. "Periodic imperfect preventive maintenance with two categories of competing failure modes," Reliability Engineering and System Safety, Elsevier, vol. 91(4), pages 460-468.
- Flammini, Francesco & Marrone, Stefano & Mazzocca, Nicola & Vittorini, Valeria, 2009. "A new modeling approach to the safety evaluation of N-modular redundant computer systems in presence of imperfect maintenance," Reliability Engineering and System Safety, Elsevier, vol. 94(9), pages 1422-1432.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhang, Aibo & Hao, Songhua & Li, Peng & Xie, Min & Liu, Yiliu, 2022. "Performance modeling for condition-based activation of the redundant safety system subject to harmful tests," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Sharifi, Mani & Taghipour, Sharareh & Abhari, Abdolreza, 2021. "Inspection interval optimization for a k-out-of-n load sharing system under a hybrid mixed redundancy strategy," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
- Peng, Rui & Liu, Bin & Zhai, Qingqing & Wang, Wenbin, 2019. "Optimal maintenance strategy for systems with two failure modes," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 624-632.
- Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
- Liu, Yongchao & Wang, Guanjun & Liu, Peng, 2024. "A condition-based maintenance policy with non-periodic inspection for k-out-of-n: G systems," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- Hajipour, Yassin & Taghipour, Sharareh, 2016. "Non-periodic inspection optimization of multi-component and k-out-of-m systems," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 228-243.
- Golmohammadi, Elnaz & Ardakan, Mostafa Abouei, 2022. "Reliability optimization problem with the mixed strategy, degrading components, and a periodic inspection and maintenance policy," Reliability Engineering and System Safety, Elsevier, vol. 223(C).
- de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
- Edson Ruschel & Eduardo Alves Portela Santos & Eduardo de Freitas Rocha Loures, 2020. "Establishment of maintenance inspection intervals: an application of process mining techniques in manufacturing," Journal of Intelligent Manufacturing, Springer, vol. 31(1), pages 53-72, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Berrade, M.D. & Cavalcante, C.A.V. & Scarf, P.A., 2013. "Modelling imperfect inspection over a finite horizon," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 18-29.
- Wang, Chaonan & Xing, Liudong & Levitin, Gregory, 2013. "Reliability analysis of multi-trigger binary systems subject to competing failures," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 9-17.
- Zhu, Mixin & Zhou, Xiaojun, 2023. "Hybrid opportunistic maintenance policy for serial-parallel multi-station manufacturing systems with spare part overlap," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Chen, Yiming & Liu, Yu & Jiang, Tao, 2021. "Optimal maintenance strategy for multi-state systems with single maintenance capacity and arbitrarily distributed maintenance time," Reliability Engineering and System Safety, Elsevier, vol. 211(C).
- Mosayebi Omshi, E. & Grall, A., 2021. "Replacement and imperfect repair of deteriorating system: Study of a CBM policy and impact of repair efficiency," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Navarro, Jorge & Arriaza, Antonio & Suárez-Llorens, Alfonso, 2019. "Minimal repair of failed components in coherent systems," European Journal of Operational Research, Elsevier, vol. 279(3), pages 951-964.
- Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
- Zhang, Nan & Cai, Kaiquan & Zhang, Jun & Wang, Tian, 2022. "A condition-based maintenance policy considering failure dependence and imperfect inspection for a two-component system," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
- Hajipour, Yassin & Taghipour, Sharareh, 2016. "Non-periodic inspection optimization of multi-component and k-out-of-m systems," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 228-243.
- Xiaofeng Wang & Shu Guo & Jian Shen & Yang Liu, 2020. "Optimization of preventive maintenance for series manufacturing system by differential evolution algorithm," Journal of Intelligent Manufacturing, Springer, vol. 31(3), pages 745-757, March.
- Zhou, Yifan & Lin, Tian Ran & Sun, Yong & Bian, Yangqing & Ma, Lin, 2015. "An effective approach to reducing strategy space for maintenance optimisation of multistate series–parallel systems," Reliability Engineering and System Safety, Elsevier, vol. 138(C), pages 40-53.
- P-E Labeau & M-C Segovia, 2011. "Effective age models for imperfect maintenance," Journal of Risk and Reliability, , vol. 225(2), pages 117-130, June.
- Shen, Jingyuan & Hu, Jiawen & Ma, Yizhong, 2020. "Two preventive replacement strategies for systems with protective auxiliary parts subject to degradation and economic dependence," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Ding, Long & Wang, Hong & Jiang, Jin & Xu, Aidong, 2017. "SIL verification for SRS with diverse redundancy based on system degradation using reliability block diagram," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 170-187.
- Doostparast, Mohammad & Kolahan, Farhad & Doostparast, Mahdi, 2014. "A reliability-based approach to optimize preventive maintenance scheduling for coherent systems," Reliability Engineering and System Safety, Elsevier, vol. 126(C), pages 98-106.
- Hao Li & Shanghua Mi & Qifeng Li & Xiaoyu Wen & Dongping Qiao & Guofu Luo, 2020. "A scheduling optimization method for maintenance, repair and operations service resources of complex products," Journal of Intelligent Manufacturing, Springer, vol. 31(7), pages 1673-1691, October.
- Gao, Hongda & Cui, Lirong & Yi, He, 2019. "Availability analysis of k-out-of-n: F repairable balanced systems with m sectors," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
- Delia, Montoro-Cazorla & Rafael, Perez-Ocon, 2008. "A maintenance model with failures and inspection following Markovian arrival processes and two repair modes," European Journal of Operational Research, Elsevier, vol. 186(2), pages 694-707, April.
- Wang, Naichao & Li, Mingyuan & Xiao, Boping & Ma, Lin, 2019. "Availability analysis of a general time distribution system with the consideration of maintenance and spares," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
- Zhang, Chengjie & Qi, Faqun & Zhang, Ning & Li, Yong & Huang, Hongzhong, 2022. "Maintenance policy optimization for multi-component systems considering dynamic importance of components," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
More about this item
Keywords
Redundant systems; Periodic inspections; Markov Chains; Maintenance cost; Time interval between inspections;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:131:y:2014:i:c:p:148-165. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.