IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v118y2013icp51-60.html
   My bibliography  Save this article

System reliability evaluation of a touch panel manufacturing system with defect rate and reworking

Author

Listed:
  • Lin, Yi-Kuei
  • Huang, Cheng-Fu
  • Chang, Ping-Chen

Abstract

In recent years, portable consumer electronic products, such as cell phone, GPS, digital camera, tablet PC, and notebook are using touch panel as interface. With the demand of touch panel increases, performance assessment is essential for touch panel production. This paper develops a method to evaluate system reliability of a touch panel manufacturing system (TPMS) with defect rate of each workstation and takes reworking actions into account. The system reliability which evaluates the possibility of demand satisfaction can provide to managers with an understanding of the system capability and can indicate possible improvements. First, we construct a capacitated manufacturing network (CMN) for a TPMS. Second, a decomposition technique is developed to determine the input flow of each workstation based on the CMN. Finally, we generate the minimal capacity vectors that should be provided to satisfy the demand. The system reliability is subsequently evaluated in terms of the minimal capacity vectors. A further decision making issue is discussed to decide a reliable production strategy.

Suggested Citation

  • Lin, Yi-Kuei & Huang, Cheng-Fu & Chang, Ping-Chen, 2013. "System reliability evaluation of a touch panel manufacturing system with defect rate and reworking," Reliability Engineering and System Safety, Elsevier, vol. 118(C), pages 51-60.
  • Handle: RePEc:eee:reensy:v:118:y:2013:i:c:p:51-60
    DOI: 10.1016/j.ress.2013.04.007
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832013001026
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2013.04.007?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lin, Yi-Kuei & Yeh, Cheng-Ta, 2011. "Maximal network reliability for a stochastic power transmission network," Reliability Engineering and System Safety, Elsevier, vol. 96(10), pages 1332-1339.
    2. Yi‐Kuei Lin & Ping‐Chen Chang, 2012. "Evaluation of system reliability for a cloud computing system with imperfect nodes," Systems Engineering, John Wiley & Sons, vol. 15(1), pages 83-94, March.
    3. Yeh, Wei-Chang, 2008. "A simple minimal path method for estimating the weighted multi-commodity multistate unreliable networks reliability," Reliability Engineering and System Safety, Elsevier, vol. 93(1), pages 125-136.
    4. Joseph C. Hudson & Kailash C. Kapur, 1985. "Reliability Bounds for Multistate Systems with Multistate Components," Operations Research, INFORMS, vol. 33(1), pages 153-160, February.
    5. Chen, Miao-Sheng & Lan, Chun-Hsiung, 2001. "The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity," International Journal of Production Economics, Elsevier, vol. 70(2), pages 175-184, March.
    6. Lan, Chun-Hsiung, 2007. "The design of multiple production lines under deadline constraint," International Journal of Production Economics, Elsevier, vol. 106(1), pages 191-203, March.
    7. Lin, Yi-Kuei & Chang, Ping-Chen, 2012. "Evaluate the system reliability for a manufacturing network with reworking actions," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 127-137.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chang, Ping-Chen & Lin, Yi-Kuei & Chiang, Yu-Min, 2019. "System reliability estimation and sensitivity analysis for multi-state manufacturing network with joint buffers––A simulation approach," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 103-109.
    2. Yu-Chung Tsao & Thuy-Linh Vu, 2023. "Electricity pricing, capacity, and predictive maintenance considering reliability," Annals of Operations Research, Springer, vol. 322(2), pages 991-1011, March.
    3. Forghani-elahabad, Majid & Mahdavi-Amiri, Nezam, 2015. "An efficient algorithm for the multi-state two separate minimal paths reliability problem with budget constraint," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 472-481.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lin, Yi-Kuei & Fiondella, Lance & Chang, Ping-Chen, 2013. "Quantifying the impact of correlated failures on system reliability by a simulation approach," Reliability Engineering and System Safety, Elsevier, vol. 109(C), pages 32-40.
    2. Lin, Yi-Kuei & Huang, Ding-Hsiang, 2020. "Reliability analysis for a hybrid flow shop with due date consideration," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    3. Yi-Kuei Lin & Hsien-Chang Chou & Ping-Chen Chang, 2017. "Reliability and sensitivity analysis for a banking company transmission system," Journal of Risk and Reliability, , vol. 231(2), pages 146-154, April.
    4. Lin, Yi-Kuei, 2010. "Calculation of minimal capacity vectors through k minimal paths under budget and time constraints," European Journal of Operational Research, Elsevier, vol. 200(1), pages 160-169, January.
    5. Bai, Guanghan & Zuo, Ming J. & Tian, Zhigang, 2015. "Search for all d-MPs for all d levels in multistate two-terminal networks," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 300-309.
    6. Lin, Yi-Kuei, 2010. "Reliability evaluation of a revised stochastic flow network with uncertain minimum time," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 389(6), pages 1253-1258.
    7. Ping-Chen Chang, 2019. "Reliability estimation for a stochastic production system with finite buffer storage by a simulation approach," Annals of Operations Research, Springer, vol. 277(1), pages 119-133, June.
    8. Yi-Kuei Lin & Ping-Chen Chang, 2015. "A novel model for a manufacturing system with joint production lines in terms of prior-set," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(2), pages 340-354, January.
    9. Hsieh, Tsung-Jung, 2023. "Performance indicator-based multi-objective reliability optimization for multi-type production systems with heterogeneous machines," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    10. Forghani-elahabad, Majid & Mahdavi-Amiri, Nezam, 2015. "An efficient algorithm for the multi-state two separate minimal paths reliability problem with budget constraint," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 472-481.
    11. Wang, Wei & Lin, Mingqiang & Fu, Yongnian & Luo, Xiaoping & Chen, Hanghang, 2020. "Multi-objective optimization of reliability-redundancy allocation problem for multi-type production systems considering redundancy strategies," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    12. Niu, Yi-Feng, 2021. "Performance measure of a multi-state flow network under reliability and maintenance cost considerations," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    13. Tina Song, Wheyming & Lin, Peisyuan, 2018. "System reliability of stochastic networks with multiple reworks," Reliability Engineering and System Safety, Elsevier, vol. 169(C), pages 258-268.
    14. Lin, Yi-Kuei & Chang, Ping-Chen, 2012. "Evaluate the system reliability for a manufacturing network with reworking actions," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 127-137.
    15. Lin, Yi-Kuei, 2010. "System reliability of a stochastic-flow network through two minimal paths under time threshold," International Journal of Production Economics, Elsevier, vol. 124(2), pages 382-387, April.
    16. Liu, Tao & Bai, Guanghan & Tao, Junyong & Zhang, Yun-An & Fang, Yining & Xu, Bei, 2022. "Modeling and evaluation method for resilience analysis of multi-state networks," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    17. Yeh, Wei-Chang & Bae, Changseok & Huang, Chia-Ling, 2015. "A new cut-based algorithm for the multi-state flow network reliability problem," Reliability Engineering and System Safety, Elsevier, vol. 136(C), pages 1-7.
    18. Lin, Yi-Kuei & Yeh, Cheng-Ta, 2011. "Maximal network reliability for a stochastic power transmission network," Reliability Engineering and System Safety, Elsevier, vol. 96(10), pages 1332-1339.
    19. Yu-Chung Tsao & Thuy-Linh Vu, 2023. "Electricity pricing, capacity, and predictive maintenance considering reliability," Annals of Operations Research, Springer, vol. 322(2), pages 991-1011, March.
    20. Niu, Yi-Feng & Gao, Zi-You & Lam, William H.K., 2017. "A new efficient algorithm for finding all d-minimal cuts in multi-state networks," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 151-163.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:118:y:2013:i:c:p:51-60. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.