The common cycle economic lot scheduling in flexible job shops: The finite horizon case
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jose Juan Carreno, 1990. "Economic Lot Scheduling for Multiple Products on Parallel Identical Processors," Management Science, INFORMS, vol. 36(3), pages 348-358, March.
- Ouenniche, Jamal & Boctor, Fayez F., 2001. "The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops," European Journal of Operational Research, Elsevier, vol. 129(3), pages 539-554, March.
- Paul H. Zipkin, 1991. "Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem," Operations Research, INFORMS, vol. 39(1), pages 56-63, February.
- Hsu, John I. S. & EI-Najdawi, M., 1990. "Common cycle scheduling in a multistage production process," Engineering Costs and Production Economics, Elsevier, vol. 20(1), pages 73-80, July.
- Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
- Dobson, Gregory & Arai Yano, Candace, 1994. "Cyclic scheduling to minimize inventory in a batch flow line," European Journal of Operational Research, Elsevier, vol. 75(2), pages 441-461, June.
- Joseph Adams & Egon Balas & Daniel Zawack, 1988. "The Shifting Bottleneck Procedure for Job Shop Scheduling," Management Science, INFORMS, vol. 34(3), pages 391-401, March.
- Pesenti, Raffaele & Ukovich, Walter, 2003. "Economic lot scheduling on multiple production lines with resource constraints," International Journal of Production Economics, Elsevier, vol. 81(1), pages 469-481, January.
- Giri, B. C. & Moon, I., 2004. "Note on an economic lot scheduling problem under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 91(3), pages 229-234, October.
- Wen-Lian Hsu, 1983. "On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine," Management Science, INFORMS, vol. 29(1), pages 93-105, January.
- Mohammad K. El-Najdawi & Paul R. Kleindorfer, 1993. "Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production," Management Science, INFORMS, vol. 39(7), pages 872-885, July.
- HSU, Wen-Lian, 1983. "On the general feasibility test of scheduling lot sizes for several products on one machine," LIDAM Reprints CORE 515, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Kenneth R. Baker, 1984. "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, INFORMS, vol. 30(9), pages 1093-1104, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Xinyu Yao & Karmel S. Shehadeh & Rema Padman, 2024. "Multi-resource allocation and care sequence assignment in patient management: a stochastic programming approach," Health Care Management Science, Springer, vol. 27(3), pages 352-369, September.
- Sağlam, Ümit & Banerjee, Avijit, 2018. "Integrated multiproduct batch production and truck shipment scheduling under different shipping policies," Omega, Elsevier, vol. 74(C), pages 70-81.
- Li, Xinyu & Gao, Liang, 2016. "An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem," International Journal of Production Economics, Elsevier, vol. 174(C), pages 93-110.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bollapragada, Ramesh & Croce, Federico Della & Ghirardi, Marco, 2011. "Discrete-time, economic lot scheduling problem on multiple, non-identical production lines," European Journal of Operational Research, Elsevier, vol. 215(1), pages 89-96, November.
- Pesenti, Raffaele & Ukovich, Walter, 2003. "Economic lot scheduling on multiple production lines with resource constraints," International Journal of Production Economics, Elsevier, vol. 81(1), pages 469-481, January.
- Nazrul Shaikh & Vittal Prabhu & Danilo Abril & David Sánchez & Jorge Arias & Esteban Rodríguez & Germán Riaño, 2011. "Kimberly-Clark Latin America Builds an Optimization-Based System for Machine Scheduling," Interfaces, INFORMS, vol. 41(5), pages 455-465, October.
- Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
- Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
- Kim, Taebok & Hong, Yushin & Chang, Soo Young, 2006. "Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system," International Journal of Production Economics, Elsevier, vol. 103(1), pages 199-208, September.
- Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
- Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
- Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
- Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
- Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
- Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
- B.C. Giri & I. Moon & W.Y. Yun, 2003. "Scheduling economic lot sizes in deteriorating production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 650-661, September.
- Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
- Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
- Daniel Adelman & Christiane Barz, 2014. "A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem," Mathematics of Operations Research, INFORMS, vol. 39(2), pages 374-402, May.
- Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
- Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- M Khouja, 2003. "Synchronization in supply chains: implications for design and management," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(9), pages 984-994, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:97:y:2005:i:1:p:52-65. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.