Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.39.7.872
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- M Khouja, 2003. "Synchronization in supply chains: implications for design and management," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(9), pages 984-994, September.
- Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
- Fayez F. Boctor & Marie-Claude Bolduc, 2018. "The inventory replenishment planning and staggering problem: a bi-objective approach," 4OR, Springer, vol. 16(2), pages 199-224, June.
- Hoque, M.A. & Kingsman, B.G., 2006. "Synchronization in common cycle lot size scheduling for a multi-product serial supply chain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 316-331, September.
- Ouenniche, Jamal & Boctor, Fayez F., 2001. "The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops," European Journal of Operational Research, Elsevier, vol. 129(3), pages 539-554, March.
- Torabi, S.A. & Karimi, B. & Fatemi Ghomi, S.M.T., 2005. "The common cycle economic lot scheduling in flexible job shops: The finite horizon case," International Journal of Production Economics, Elsevier, vol. 97(1), pages 52-65, July.
- Van den broecke, Frank & Van Landeghem, Hendrik & Aghezzaf, El-Houssaine, 2008. "Implementing a near-optimal solution for the multi-stage, multi-product capacitated lot-sizing problem by rolling out a cyclical production plan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 121-137, March.
More about this item
Keywords
inventory management; production planning; production scheduling; job-shop scheduling; common cycle scheduling; lot-size scheduling; cyclic scheduling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:39:y:1993:i:7:p:872-885. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.