Determination of an order-up-to policy in the stochastic economic lot scheduling model
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- F Janssen & R Heuts & T de Kok, 1999. "The impact of data collection on fill rate performance in the (R, s, Q) inventory model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(1), pages 75-84, January.
- Guillermo Gallego, 1990. "Scheduling the Production of Several Items with Random Demands in a Single Facility," Management Science, INFORMS, vol. 36(12), pages 1579-1592, December.
- Robert C. Leachman & André Gascon, 1988. "A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands," Management Science, INFORMS, vol. 34(3), pages 377-390, March.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
- Robert C. Leachman & Zhong K. Xiong & André Gascon & Kwangtae Park, 1991. "Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine," Management Science, INFORMS, vol. 37(9), pages 1201-1205, September.
- Karla E. Bourland & Candace A. Yano, 1994. "The Strategic Use of Capacity Slack in the Economic Lot Scheduling Problem with Random Demand," Management Science, INFORMS, vol. 40(12), pages 1690-1704, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Vlasiou, M. & Adan, I.J.B.F. & Boxma, O.J., 2009. "A two-station queue with dependent preparation and service times," European Journal of Operational Research, Elsevier, vol. 195(1), pages 104-116, May.
- Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
- Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
- Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
- Kamath B, Narasimha & Bhattacharya, Subir, 2007. "Lead time minimization of a multi-product, single-processor system: A comparison of cyclic policies," International Journal of Production Economics, Elsevier, vol. 106(1), pages 28-40, March.
- Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
- Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
- Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
- Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
- Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
- Donald D. Eisenstein, 2005. "Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies," Operations Research, INFORMS, vol. 53(4), pages 675-688, August.
- Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
- Sridhar Tayur, 2000. "Improving Operations and Quoting Accurate Lead Times in a Laminate Plant," Interfaces, INFORMS, vol. 30(5), pages 1-15, October.
- Kamath B, Narasimha & Bhattacharya, Subir, 2007. "Lead time minimization of a multi-product, single-processor system: A comparison of cyclic policies," International Journal of Production Economics, Elsevier, vol. 106(1), pages 28-40, March.
- David M. Markowitz & Martin I. Reiman & Lawrence M. Wein, 2000. "The Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies," Operations Research, INFORMS, vol. 48(1), pages 136-154, February.
- Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
- David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
- Soman, Chetan Anil & Pieter van Donk, Dirk & Gaalman, Gerard, 2006. "Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand," International Journal of Production Economics, Elsevier, vol. 104(2), pages 441-453, December.
- Kelle, Peter & Peak, David, 1996. "A comparison of fixed and adaptive type controls for multi-product processing," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 139-146, August.
- McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
- Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
- Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
- Brander, Par & Leven, Erik & Segerstedt, Anders, 2005. "Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand," International Journal of Production Economics, Elsevier, vol. 93(1), pages 375-386, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:90:y:2004:i:3:p:377-389. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.