IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v88y2004i3p243-256.html
   My bibliography  Save this article

Optimizing assembly planning through a three-stage integrated approach

Author

Listed:
  • Chen, Ruey-Shun
  • Lu, Kun-Yung
  • Tai, Pei-Hao

Abstract

No abstract is available for this item.

Suggested Citation

  • Chen, Ruey-Shun & Lu, Kun-Yung & Tai, Pei-Hao, 2004. "Optimizing assembly planning through a three-stage integrated approach," International Journal of Production Economics, Elsevier, vol. 88(3), pages 243-256, April.
  • Handle: RePEc:eee:proeco:v:88:y:2004:i:3:p:243-256
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00187-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Dowlatshahi, S., 1995. "An integrated manufacturing system design: an applied approach," International Journal of Production Economics, Elsevier, vol. 42(2), pages 187-199, December.
    2. J. W. Feng & P. L. Yu, 1998. "Minimum Spanning Table and Optimal Expansion of Competence Set," Journal of Optimization Theory and Applications, Springer, vol. 99(3), pages 655-679, December.
    3. F. Brian Talbot & James H. Patterson, 1984. "An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem," Management Science, INFORMS, vol. 30(1), pages 85-99, January.
    4. Amen, Matthias, 2001. "Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time," International Journal of Production Economics, Elsevier, vol. 69(3), pages 255-264, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lai, Tsung-Chyan & Sotskov, Yuri N. & Dolgui, Alexandre, 2019. "The stability radius of an optimal line balance with maximum efficiency for a simple assembly line," European Journal of Operational Research, Elsevier, vol. 274(2), pages 466-481.
    2. Guodong Yi & Chuanyuan Zhou & Yanpeng Cao & Hangjian Hu, 2021. "Hybrid Assembly Path Planning for Complex Products by Reusing a Priori Data," Mathematics, MDPI, vol. 9(4), pages 1-14, February.
    3. Lai, Tsung-Chyan & Sotskov, Yuri N. & Dolgui, Alexandre & Zatsiupa, Aksana, 2016. "Stability radii of optimal assembly line balances with a fixed workstation set," International Journal of Production Economics, Elsevier, vol. 182(C), pages 356-371.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
    2. Amen, Matthias, 2006. "Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds," European Journal of Operational Research, Elsevier, vol. 168(3), pages 747-770, February.
    3. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    4. Kara, Yakup & Paksoy, Turan & Chang, Ching-Ter, 2009. "Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing," European Journal of Operational Research, Elsevier, vol. 195(2), pages 335-347, June.
    5. Scholl, Armin & Becker, Christian, 2005. "A note on "An exact method for cost-oriented assembly line balancing"," International Journal of Production Economics, Elsevier, vol. 97(3), pages 343-352, September.
    6. Dashuang Li & Chaoyong Zhang & Xinyu Shao & Wenwen Lin, 2016. "A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraints," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 725-739, August.
    7. Scholl, Armin & Klein, Robert, 1999. "Balancing assembly lines effectively - A computational comparison," European Journal of Operational Research, Elsevier, vol. 114(1), pages 50-58, April.
    8. Bukchin, Yossi & Raviv, Tal, 2018. "Constraint programming for solving various assembly line balancing problems," Omega, Elsevier, vol. 78(C), pages 57-68.
    9. Aase, Gerald R. & Olson, John R. & Schniederjans, Marc J., 2004. "U-shaped assembly line layouts and their impact on labor productivity: An experimental study," European Journal of Operational Research, Elsevier, vol. 156(3), pages 698-711, August.
    10. Miralles, Cristobal & Garcia-Sabater, Jose Pedro & Andres, Carlos & Cardos, Manuel, 2007. "Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 187-197, October.
    11. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    12. Dowlatshahi, S., 2000. "Material selection and product safety: theory versus practice," Omega, Elsevier, vol. 28(4), pages 467-480, August.
    13. Otto, Alena & Otto, Christian & Scholl, Armin, 2013. "Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 228(1), pages 33-45.
    14. Po-Lung Yu & Yen-Chu Chen, 2012. "Dynamic multiple criteria decision making in changeable spaces: from habitual domains to innovation dynamics," Annals of Operations Research, Springer, vol. 197(1), pages 201-220, August.
    15. Kucukkoc, Ibrahim & Zhang, David Z., 2014. "Mathematical model and agent based solution approach for the simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines," International Journal of Production Economics, Elsevier, vol. 158(C), pages 314-333.
    16. Kucukkoc, Ibrahim & Li, Zixiang & Karaoglan, Aslan D. & Zhang, David Z., 2018. "Balancing of mixed-model two-sided assembly lines with underground workstations: A mathematical model and ant colony optimization algorithm," International Journal of Production Economics, Elsevier, vol. 205(C), pages 228-243.
    17. Sawik, Tadeusz, 1998. "A lexicographic approach to bi-objective loading of a flexible assembly system," European Journal of Operational Research, Elsevier, vol. 107(3), pages 656-668, June.
    18. Amen, Matthias, 2000. "Heuristic methods for cost-oriented assembly line balancing: A survey," International Journal of Production Economics, Elsevier, vol. 68(1), pages 1-14, October.
    19. Urban, Timothy L. & Chiang, Wen-Chyuan, 2006. "An optimal piecewise-linear program for the U-line balancing problem with stochastic task times," European Journal of Operational Research, Elsevier, vol. 168(3), pages 771-782, February.
    20. Walter, Rico & Schulze, Philipp & Scholl, Armin, 2021. "SALSA: Combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 295(3), pages 857-873.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:88:y:2004:i:3:p:243-256. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.