IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v88y2004i2p173-181.html
   My bibliography  Save this article

Simulated annealing in lot sizing problems

Author

Listed:
  • Tang, Ou

Abstract

No abstract is available for this item.

Suggested Citation

  • Tang, Ou, 2004. "Simulated annealing in lot sizing problems," International Journal of Production Economics, Elsevier, vol. 88(2), pages 173-181, March.
  • Handle: RePEc:eee:proeco:v:88:y:2004:i:2:p:173-181
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00339-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Grubbstrom, Robert W. & Molinder, Anders, 1996. "Safety production plans in MRP-systems using transform methodology," International Journal of Production Economics, Elsevier, vol. 46(1), pages 297-309, December.
    2. Wallace B. Crowston & Michael H. Wagner, 1973. "Dynamic Lot Size Models for Multi-Stage Assembly Systems," Management Science, INFORMS, vol. 20(1), pages 14-21, September.
    3. Grubbstrom, Robert W. & Tang, Ou, 1999. "Further developments on safety stocks in an MRP system applying Laplace transforms and input-output analysis," International Journal of Production Economics, Elsevier, vol. 60(1), pages 381-387, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wu, Tao & Shi, Leyuan & Geunes, Joseph & AkartunalI, Kerem, 2011. "An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging," European Journal of Operational Research, Elsevier, vol. 214(2), pages 428-441, October.
    2. Diaz, Rafael & Bailey, Mike, 2011. "Building knowledge to improve enterprise performance from inventory simulation models," International Journal of Production Economics, Elsevier, vol. 134(1), pages 108-113, November.
    3. Grubbström, Robert W. & Tang, Ou, 2012. "The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 765-777.
    4. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2014. "Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 175-186.
    5. Tao Wu, 2022. "Predictive Search for Capacitated Multi-Item Lot Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 34(1), pages 385-406, January.
    6. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
    7. Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
    8. Xiao, Yiyong & Zhang, Renqian & Zhao, Qiuhong & Kaku, Ikou & Xu, Yuchun, 2014. "A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 235(1), pages 102-114.
    9. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.
    2. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    3. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
    4. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
    5. Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Reprint of “Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 113-125.
    6. Marcin Bienkowski & Martin Böhm & Jaroslaw Byrka & Marek Chrobak & Christoph Dürr & Lukáš Folwarczný & Łukasz Jeż & Jiří Sgall & Nguyen Kim Thang & Pavel Veselý, 2020. "Online Algorithms for Multilevel Aggregation," Operations Research, INFORMS, vol. 68(1), pages 214-232, January.
    7. Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
    8. Bogataj, David & Battini, Daria & Calzavara, Martina & Persona, Alessandro, 2019. "The ageing workforce challenge: Investments in collaborative robots or contribution to pension schemes, from the multi-echelon perspective," International Journal of Production Economics, Elsevier, vol. 210(C), pages 97-106.
    9. Grubbstrom, Robert W., 1996. "Stochastic properties of a production--inventory process with planned production using transform methodology," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 407-419, August.
    10. Grubbstrom, Robert W. & Tang, Ou, 1999. "Further developments on safety stocks in an MRP system applying Laplace transforms and input-output analysis," International Journal of Production Economics, Elsevier, vol. 60(1), pages 381-387, April.
    11. Gencer, Cevriye & Erol, Serpil & Erol, Yalcin, 1999. "A decision network algorithm for multi-stage dynamic lot sizing problems," International Journal of Production Economics, Elsevier, vol. 62(3), pages 281-285, September.
    12. Sagawa, Juliana Keiko & Nagano, Marcelo Seido, 2015. "Modeling the dynamics of a multi-product manufacturing system: A real case application," European Journal of Operational Research, Elsevier, vol. 244(2), pages 624-636.
    13. Grubbstrom, Robert W., 1999. "A net present value approach to safety stocks in a multi-level MRP system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 361-375, March.
    14. Chu, Chi-Leung & Leon, V. Jorge, 2009. "Scalable methodology for supply chain inventory coordination with private information," European Journal of Operational Research, Elsevier, vol. 195(1), pages 262-279, May.
    15. Campuzano-Bolarín, Francisco & Marín-García, Fulgencio & Moreno-Nicolás, José Andrés & Bogataj, Marija & Bogataj, David, 2021. "Impacts of variable interest rates on the market areas of a spatial duopoly in supply chains operating on the finite horizon," International Journal of Production Economics, Elsevier, vol. 236(C).
    16. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    17. Tang, Ou & Grubbstrom, Robert W., 2002. "Planning and replanning the master production schedule under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 78(3), pages 323-334, August.
    18. Xiao, Yiyong & Zhang, Renqian & Zhao, Qiuhong & Kaku, Ikou & Xu, Yuchun, 2014. "A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 235(1), pages 102-114.
    19. H-J Kim & D-H Lee & P Xirouchakis & O K Kwon, 2009. "A branch and bound algorithm for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 419-430, March.
    20. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:88:y:2004:i:2:p:173-181. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.