IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v84y2003i2p193-204.html
   My bibliography  Save this article

A management design approach to assembly line systems

Author

Listed:
  • Yamada, Tetsuo
  • Matsui, Masayuki

Abstract

No abstract is available for this item.

Suggested Citation

  • Yamada, Tetsuo & Matsui, Masayuki, 2003. "A management design approach to assembly line systems," International Journal of Production Economics, Elsevier, vol. 84(2), pages 193-204, May.
  • Handle: RePEc:eee:proeco:v:84:y:2003:i:2:p:193-204
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00413-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Feyzbakhsh, S. A. & Matsui, M. & Itai, K., 1998. "Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases," International Journal of Production Economics, Elsevier, vol. 55(2), pages 177-189, July.
    2. Nakase, Nobuaki & Yamada, Tetsuo & Matsui, Masayuki, 2002. "A management design approach to a simple flexible assembly system," International Journal of Production Economics, Elsevier, vol. 76(3), pages 281-292, April.
    3. Sarin, Subhash C. & Erel, Erdal & Dar-El, Ezey M., 1999. "A methodology for solving single-model, stochastic assembly line balancing problem," Omega, Elsevier, vol. 27(5), pages 525-535, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hsiu-Hsueh Kao & Din-Horng Yeh & Yi-Hsien Wang, 2011. "Resource Constrained Assembly Line Balancing Problem Solved with Ranked Positional Weight Rule," Review of Economics & Finance, Better Advances Press, Canada, vol. 1, pages 71-80, November.
    2. Agpak, Kursad & Gokcen, Hadi, 2005. "Assembly line balancing: Two resource constrained cases," International Journal of Production Economics, Elsevier, vol. 96(1), pages 129-140, April.
    3. Partanen, Jari & Haapasalo, Harri, 2004. "Fast production for order fulfillment: Implementing mass customization in electronics industry," International Journal of Production Economics, Elsevier, vol. 90(2), pages 213-222, July.
    4. Miralles, Cristobal & Garcia-Sabater, Jose Pedro & Andres, Carlos & Cardos, Manuel, 2007. "Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 187-197, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Diefenbach, Johannes & Stolletz, Raik, 2022. "Stochastic assembly line balancing: General bounds and reliability-based branch-and-bound algorithm," European Journal of Operational Research, Elsevier, vol. 302(2), pages 589-605.
    2. Hamta, Nima & Fatemi Ghomi, S.M.T. & Jolai, F. & Akbarpour Shirazi, M., 2013. "A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect," International Journal of Production Economics, Elsevier, vol. 141(1), pages 99-111.
    3. Delorme, Xavier & Dolgui, Alexandre & Kovalyov, Mikhail Y., 2012. "Combinatorial design of a minimum cost transfer line," Omega, Elsevier, vol. 40(1), pages 31-41, January.
    4. Nakase, Nobuaki & Yamada, Tetsuo & Matsui, Masayuki, 2002. "A management design approach to a simple flexible assembly system," International Journal of Production Economics, Elsevier, vol. 76(3), pages 281-292, April.
    5. Pereira, Jordi & Álvarez-Miranda, Eduardo, 2018. "An exact approach for the robust assembly line balancing problem," Omega, Elsevier, vol. 78(C), pages 85-98.
    6. Aase, Gerald R. & Olson, John R. & Schniederjans, Marc J., 2004. "U-shaped assembly line layouts and their impact on labor productivity: An experimental study," European Journal of Operational Research, Elsevier, vol. 156(3), pages 698-711, August.
    7. Sotskov, Yuri N. & Dolgui, Alexandre & Portmann, Marie-Claude, 2006. "Stability analysis of an optimal balance for an assembly line with fixed cycle time," European Journal of Operational Research, Elsevier, vol. 168(3), pages 783-797, February.
    8. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    9. Pirogov, Aleksandr & Gurevsky, Evgeny & Rossi, André & Dolgui, Alexandre, 2021. "Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions," European Journal of Operational Research, Elsevier, vol. 290(3), pages 946-955.
    10. Parvaneh Samouei & Mahsa Sobhishoja, 2023. "Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times," OPSEARCH, Springer;Operational Research Society of India, vol. 60(1), pages 87-124, March.
    11. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    12. Marcus Ritt & Alysson M. Costa & Cristóbal Miralles, 2016. "The assembly line worker assignment and balancing problem with stochastic worker availability," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 907-922, February.
    13. Bentaha, Mohand Lounes & Battaïa, Olga & Dolgui, Alexandre & Hu, S. Jack, 2015. "Second order conic approximation for disassembly line design with joint probabilistic constraints," European Journal of Operational Research, Elsevier, vol. 247(3), pages 957-967.
    14. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008. "Assembly line balancing: Which model to use when," International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
    15. Lale Özbakır & Gökhan Seçme, 2022. "A hyper-heuristic approach for stochastic parallel assembly line balancing problems with equipment costs," Operational Research, Springer, vol. 22(1), pages 577-614, March.
    16. Wenqiang Zhang & Weitao Xu & Gang Liu & Mitsuo Gen, 2017. "An effective hybrid evolutionary algorithm for stochastic multiobjective assembly line balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 28(3), pages 783-790, March.
    17. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007. "A classification of assembly line balancing problems," European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
    18. Xiaobo Zhao & Jianyong Liu & Katsuhisa Ohno & Shigenori Kotani, 2007. "Modeling and analysis of a mixed‐model assembly line with stochastic operation times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 681-691, September.
    19. Gamberini, Rita & Grassi, Andrea & Rimini, Bianca, 2006. "A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 226-243, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:84:y:2003:i:2:p:193-204. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.