Assembly line balancing: Two resource constrained cases
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Stephen C. Graves & Bruce W. Lamar, 1983. "An Integer Programming Procedure for Assembly System Design Problems," Operations Research, INFORMS, vol. 31(3), pages 522-545, June.
- .Ilker Baybars, 1986. "A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem," Management Science, INFORMS, vol. 32(8), pages 909-932, August.
- Yamada, Tetsuo & Matsui, Masayuki, 2003. "A management design approach to assembly line systems," International Journal of Production Economics, Elsevier, vol. 84(2), pages 193-204, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Miralles, Cristobal & Garcia-Sabater, Jose Pedro & Andres, Carlos & Cardos, Manuel, 2007. "Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 187-197, October.
- Scholl, Armin & Becker, Christian, 2005. "A note on "An exact method for cost-oriented assembly line balancing"," International Journal of Production Economics, Elsevier, vol. 97(3), pages 343-352, September.
- Hsiu-Hsueh Kao & Din-Horng Yeh & Yi-Hsien Wang, 2011. "Resource Constrained Assembly Line Balancing Problem Solved with Ranked Positional Weight Rule," Review of Economics & Finance, Better Advances Press, Canada, vol. 1, pages 71-80, November.
- Xujing Zhang & Yan Chen, 2019. "Carbon Emission Evaluation Based on Multi-Objective Balance of Sewing Assembly Line in Apparel Industry," Energies, MDPI, vol. 12(14), pages 1-19, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Miralles, Cristobal & Garcia-Sabater, Jose Pedro & Andres, Carlos & Cardos, Manuel, 2007. "Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 187-197, October.
- Becker, Christian & Scholl, Armin, 2006.
"A survey on problems and methods in generalized assembly line balancing,"
European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
- Armin Scholl & Christian Becker, 2003. "A survey on problems and methods in generalized assembly line balancing," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 21/2003, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
- Anulark Pinnoi & Wilbert E. Wilhelm, 1998. "Assembly System Design: A Branch and Cut Approach," Management Science, INFORMS, vol. 44(1), pages 103-118, January.
- Hsiu-Hsueh Kao & Din-Horng Yeh & Yi-Hsien Wang, 2011. "Resource Constrained Assembly Line Balancing Problem Solved with Ranked Positional Weight Rule," Review of Economics & Finance, Better Advances Press, Canada, vol. 1, pages 71-80, November.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008.
"Assembly line balancing: Which model to use when,"
International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "Assembly line balancing: Which model to use when?," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 23/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Christoph Müller & Martin Grunewald & Thomas S. Spengler, 2017. "Redundant configuration of automated flow lines based on “Industry 4.0”-technologies," Journal of Business Economics, Springer, vol. 87(7), pages 877-898, October.
- Pinnoi, Anulark & Wilhelm, Wilbert E., 2000. "Valid inequalities for a class of assembly system problems," European Journal of Operational Research, Elsevier, vol. 126(1), pages 31-50, October.
- Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
- Pape, Tom, 2015. "Heuristics and lower bounds for the simple assembly line balancing problem type 1: Overview, computational tests and improvements," European Journal of Operational Research, Elsevier, vol. 240(1), pages 32-42.
- Walter, Rico & Schulze, Philipp & Scholl, Armin, 2021. "SALSA: Combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 295(3), pages 857-873.
- Moreira, Mayron César O. & Costa, Alysson M., 2013. "Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers," International Journal of Production Economics, Elsevier, vol. 141(2), pages 552-560.
- García-Villoria, Alberto & Corominas, Albert & Nadal, Adrià & Pastor, Rafael, 2018. "Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints," European Journal of Operational Research, Elsevier, vol. 271(3), pages 882-895.
- Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
- Ece Sancı & Meral Azizoğlu, 2017. "Rebalancing the assembly lines: exact solution approaches," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 5991-6010, October.
- Borba, Leonardo & Ritt, Marcus & Miralles, Cristóbal, 2018. "Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 270(1), pages 146-156.
- Partanen, Jari & Haapasalo, Harri, 2004. "Fast production for order fulfillment: Implementing mass customization in electronics industry," International Journal of Production Economics, Elsevier, vol. 90(2), pages 213-222, July.
- Gokcen, Hadi & Erel, Erdal, 1997. "A goal programming approach to mixed-model assembly line balancing problem," International Journal of Production Economics, Elsevier, vol. 48(2), pages 177-185, January.
- Heike, G. & Ramulu, M. & Sorenson, E. & Shanahan, P. & Moinzadeh, K., 2001. "Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry," International Journal of Production Economics, Elsevier, vol. 72(2), pages 103-120, July.
- Karabati, Selcuk & Sayin, Serpil, 2003. "Assembly line balancing in a mixed-model sequencing environment with synchronous transfers," European Journal of Operational Research, Elsevier, vol. 149(2), pages 417-429, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:96:y:2005:i:1:p:129-140. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.