Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- C. H. Jones, 1973. "An Economic Evaluation of Job Shop Dispatching Rules," Management Science, INFORMS, vol. 20(3), pages 293-307, November.
- Sen, Tapan & Gupta, Sushil K, 1984. "A state-of-art survey of static scheduling research involving due dates," Omega, Elsevier, vol. 12(1), pages 63-76.
- Stephen J. Balut, 1973. "Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain," Management Science, INFORMS, vol. 19(11), pages 1283-1288, July.
- James K. Weeks & John S. Fryer, 1976. "A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop," Management Science, INFORMS, vol. 22(12), pages 1362-1371, August.
- S. S. Panwalkar & M. L. Smith & A. Seidmann, 1982. "Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem," Operations Research, INFORMS, vol. 30(2), pages 391-399, April.
- Sarin, Subhash C. & Erel, Erdal & Steiner, George, 1991. "Sequencing jobs on a single machine with a common due date and stochastic processing times," European Journal of Operational Research, Elsevier, vol. 51(2), pages 188-198, March.
- Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
- Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
- Jeffrey B. Sidney, 1977. "Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties," Operations Research, INFORMS, vol. 25(1), pages 62-69, February.
- Kenneth N. McKay & Frank R. Safayeni & John A. Buzacott, 1988. "Job-Shop Scheduling Theory: What Is Relevant?," Interfaces, INFORMS, vol. 18(4), pages 84-90, August.
- Samuel Eilon & I. G. Chowdhury, 1977. "Minimising Waiting Time Variance in the Single Machine Problem," Management Science, INFORMS, vol. 23(6), pages 567-575, February.
- Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
- Soroush, H. M. & Fredendall, L. D., 1994. "The stochastic single machine scheduling problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 77(2), pages 287-302, September.
- Cheng, T. C. E., 1991. "Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 51(3), pages 348-353, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Laslo, Zohar & Golenko-Ginzburg, Dimitri & Keren, Baruch, 2008. "Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs," International Journal of Production Economics, Elsevier, vol. 111(2), pages 812-821, February.
- Ali Salmasnia & Mostafa Khatami & Reza Kazemzadeh & Seyed Zegordi, 2015. "Bi-objective single machine scheduling problem with stochastic processing times," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(1), pages 275-297, April.
- Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
- Alcaide, David & Rodriguez-Gonzalez, Andrés & Sicilia, Joaquín, 2003. "An approach to solve a hierarchical stochastic sequential ordering problem," Omega, Elsevier, vol. 31(3), pages 169-187, June.
- Sridharan, V. & Li, Xiaoming, 2008. "Improving delivery reliability by a new due-date setting rule," European Journal of Operational Research, Elsevier, vol. 186(3), pages 1201-1211, May.
- Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
- Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
- Portougal, Victor & Trietsch, Dan, 2006. "Johnson's problem with stochastic processing times and optimal service level," European Journal of Operational Research, Elsevier, vol. 169(3), pages 751-760, March.
- Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
- Soroush, H.M., 2007. "Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 181(1), pages 266-287, August.
- Baker, Kenneth R. & Trietsch, Dan, 2009. "Safe scheduling: Setting due dates in single-machine problems," European Journal of Operational Research, Elsevier, vol. 196(1), pages 69-77, July.
- Yue, Qing & Zhou, Shenghai, 2021. "Due-window assignment scheduling problem with stochastic processing times," European Journal of Operational Research, Elsevier, vol. 290(2), pages 453-468.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
- X. Cai & S. Zhou, 1997. "Scheduling stochastic jobs with asymmetric earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 531-557, September.
- Adamopoulos, G. I. & Pappis, C. P., 1995. "The CON due-date determination method with processing time-dependent lateness penalties," International Journal of Production Economics, Elsevier, vol. 40(1), pages 29-36, June.
- Adamopoulos, G. I. & Pappis, C. P., 1996. "Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method," European Journal of Operational Research, Elsevier, vol. 88(2), pages 336-344, January.
- Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
- Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
- Xiaoqiang Cai & Sean Zhou, 1999. "Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs," Operations Research, INFORMS, vol. 47(3), pages 422-437, June.
- Victor Portougal & David J. Robb, 2000. "Production Scheduling Theory: Just Where Is It Applicable?," Interfaces, INFORMS, vol. 30(6), pages 64-76, December.
- Soroush, H.M., 2007. "Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 181(1), pages 266-287, August.
- Chung‐Lun Li & T. C. E. Cheng, 1994. "The parallel machine min‐max weighted absolute lateness scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 33-46, February.
- Kolahan, F. & Liang, M., 1998. "An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 109(1), pages 142-159, August.
- Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
- Awi Federgruen & Gur Mosheiov, 1993. "Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 951-970, December.
- Bernard Dickman & Yonah Wilamowsky & Sheldon Epstein, 2001. "Multiple common due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 293-298, June.
- Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
- Cai, X., 1995. "Minimization of agreeably weighted variance in single machine systems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 576-592, September.
- Lin, Shih-Wei & Chou, Shuo-Yan & Ying, Kuo-Ching, 2007. "A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1294-1301, March.
- Uttarayan Bagchi & Yih‐Long Chang & Robert S. Sullivan, 1987. "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 739-751, October.
- T. C. E. Cheng & H. G. Kahlbacher, 1991. "A proof for the longest‐job‐first policy in one‐machine scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 715-720, October.
- Umar M. Al‐Turki & John Mittenthal & M. Raghavachari, 1996. "The single‐machine absolute‐deviation early‐tardy problem with random completion times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(4), pages 573-587, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:113:y:1999:i:2:p:450-468. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.