Indicators for measuring performances of morphology and material handling systems in flexible manufacturing systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Stephen F. Weber, 1993. "A Modified Analytic Hierarchy Process for Automated Manufacturing Decisions," Interfaces, INFORMS, vol. 23(4), pages 75-84, August.
- Heragu, Sunderesh S. & Alfa, Attahiru Sule, 1992. "Experimental analysis of simulated annealing based algorithms for the layout problem," European Journal of Operational Research, Elsevier, vol. 57(2), pages 190-202, March.
- Egbelu, Pius J., 1993. "Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system," International Journal of Production Economics, Elsevier, vol. 29(1), pages 49-64, February.
- Heragu, Sunderesh S., 1992. "Recent models and techniques for solving the layout problem," European Journal of Operational Research, Elsevier, vol. 57(2), pages 136-144, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Dai, James B. & Lee, Neville K.S., 2012. "Economic feasibility analysis of flexible material handling systems: A case study in the apparel industry," International Journal of Production Economics, Elsevier, vol. 136(1), pages 28-36.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ravi Kumar, K. & Hadjinicola, George C. & Lin, Ting-li, 1995. "A heuristic procedure for the single-row facility layout problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 65-73, November.
- Kazuhiro Tsuchiya & Sunil Bharitkar & Yoshiyasu Takefuji, 1996. "A neural network approach to facility layout problems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 556-563, March.
- Lin, Jin-Ling & Foote, Bobbie & Pulat, Simin & Chang, Chir-Ho & Cheung, John Y., 1996. "Solving the failure-to-fit problem for plant layout: By changing department shapes and sizes," European Journal of Operational Research, Elsevier, vol. 89(1), pages 135-146, February.
- Ioannou, George, 2006. "Time-phased creation of hybrid manufacturing systems," International Journal of Production Economics, Elsevier, vol. 102(2), pages 183-198, August.
- Ghosh, Diptesh, 2011. "An Exponential Neighborhood Local Search Algorithm for the Single Row Facility Location Problem," IIMA Working Papers WP2011-08-01, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Yifei Zhao & Stein W. Wallace, 2016. "Appraising redundancy in facility layout," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 665-679, February.
- Uma Kothari & Diptesh Ghosh, 2012.
"A Competitive Genetic Algorithm for Single Row Facility Layout,"
Working Papers
id:4915, eSocialSciences.
- Kothari, Ravi & Ghosh, Diptesh, 2012. "A Competitive Genetic Algorithm for Single Row Facility Layout," IIMA Working Papers WP2012-03-01, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Bazargan-Lari, Massoud, 1999. "Layout designs in cellular manufacturing," European Journal of Operational Research, Elsevier, vol. 112(2), pages 258-272, January.
- Kothari, Ravi & Ghosh, Diptesh, 2013.
"Tabu search for the single row facility layout problem using exhaustive 2-opt and insertion neighborhoods,"
European Journal of Operational Research, Elsevier, vol. 224(1), pages 93-100.
- Kothari, Ravi & Ghosh, Diptesh, 2012. "Tabu Search for the Single Row Facility Layout Problem Using Exhaustive 2-Opt and Insertion Neighborhoods," IIMA Working Papers WP2012-01-03, Indian Institute of Management Ahmedabad, Research and Publication Department.
- André R. S. Amaral, 2008. "An Exact Approach to the One-Dimensional Facility Layout Problem," Operations Research, INFORMS, vol. 56(4), pages 1026-1033, August.
- Hsu, Chaug-Ing & Li, Hui-Chieh, 2009. "An integrated plant capacity and production planning model for high-tech manufacturing firms with economies of scale," International Journal of Production Economics, Elsevier, vol. 118(2), pages 486-500, April.
- Brusco, Michael J. & Jacobs, Larry W., 1995. "Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations," European Journal of Operational Research, Elsevier, vol. 86(2), pages 249-261, October.
- Kothari, Ravi & Ghosh, Diptesh, 2012. "A Lin-Kernighan Heuristic for Single Row Facility Layout," IIMA Working Papers WP2012-01-04, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Andijani, A. A. & Anwarul, M., 1997. "Manufacturing blocking discipline: A multi-criterion approach for buffer allocations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 155-163, September.
- Jerzy Grobelny & Rafał Michalski, 2020.
"Effects of scatter plot initial solutions on regular grid facility layout algorithms in typical production models,"
Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(2), pages 601-632, June.
- Jerzy Grobelny & Rafal Michalski, 2020. "Effects of scatter plot initial solutions on regular grid facility layout algorithms in typical production models," WORking papers in Management Science (WORMS) WORMS/20/12, Department of Operations Research and Business Intelligence, Wroclaw University of Science and Technology.
- Ai-Hsuan Chiang & Silvana Trimi & Tun-Chih Kou, 2024. "Critical Factors for Implementing Smart Manufacturing: A Supply Chain Perspective," Sustainability, MDPI, vol. 16(22), pages 1-21, November.
- Palubeckis, Gintaras, 2015. "Fast local search for single row facility layout," European Journal of Operational Research, Elsevier, vol. 246(3), pages 800-814.
- Amjath, Mohamed & Kerbache, Laoucine & Smith, James MacGregor & Elomri, Adel, 2022. "Fleet sizing of trucks for an inter-facility material handling system using closed queueing networks," Operations Research Perspectives, Elsevier, vol. 9(C).
- Guan, Jian & Lin, Geng, 2016. "Hybridizing variable neighborhood search with ant colony optimization for solving the single row facility layout problem," European Journal of Operational Research, Elsevier, vol. 248(3), pages 899-909.
- Hanson, Robin & Finnsgård, Christian, 2014. "Impact of unit load size on in-plant materials supply efficiency," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 46-52.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:64:y:2000:i:1-3:p:209-218. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.